5 February 2024
Robust Optimisation Study results support Globe’s Kanyika
Niobium Project
Highlights
Globe has completed its Op�misa�on Study which confirms robust financial and technical outcomes for
the Kanyika Niobium Project, including:
•
Pre-tax NPV (8%) of US$1.004B and IRR of 47.08%.
•
Total unit cost of Niobium Pentoxide reduces by 15% to US$18.90/kg and gross profit margin
increases by 5% to 71%.
•
27-year life of mine.
•
Two-Phase development approach allows a significant reduc�on in ini�al upfront capital from
US$70m to US$30m and greatly reduces the risk profile of the Project.
•
Change in refining technology to the chlorina�on process, which is more environmentally
sustainable, cost-effec�ve, and produces high purity products which can command premium
prices.
•
Preferred loca�on of the Refinery to be Malawi.
Globe Metals & Mining Limited (ASX: GBE) (“Globe” or “Company”) is pleased to announce it has
achieved significantly improved economic and environmental outcomes from its Kanyika Niobium
Project in Malawi (“Project”) through an op�misa�on study which provides a strong founda�on for
Globe to advance the Project towards financing and development.
Kanyika has the poten�al to become the first new globally significant niobium mine in 50 years, with an
average nameplate produc�on of 3,267 tonnes per annum of niobium pentoxide, (Nb2O5) and 136
tonnes per annum of tantalum pentoxide (Ta2O5) over the 27-year life of opera�ons. The Nb2O5 and
Ta2O5 products will be high-specifica�on high-purity products with grades exceeding 99.5% and 99%
respec�vely.
The op�misa�on study follows the announced 2021 Defini�ve Feasibility Study (“DFS”) which first
established Kanyika’s poten�al configura�on and economic feasibility. Globe will present a further
detailed report regarding the op�misa�on study during the current quarter.
The key elements of the op�misa�on include:
•
a low-risk, two-phased approach to the development of the Project;
•
op�misa�on of the milling and concentra�on circuits;
•
the use of chlorina�on technology for the refining of high-purity metal oxides rather than the
tradi�onal HF acid floata�on process; and
•
the preferred loca�on of the refinery to be Malawi.
The financial impacts of these op�misa�on steps (versus the DFS in 2021) are summarised in the
financial results discussion below.
Summary of financial results of the op�misa�on study: Kanyika Niobium Project Malawi
Metrics
Units
Phase 1
Phase 2
ROM Ore Production
ROM Grade (Nb2O5)
Concentrate production
Concentrate grade
Refined Nb2O5
Refined Ta2O5
ktpa
Ppm
Ktpa
%
tons/year
tons/year
86
4,933
2
20%
313
14
1,455
3,063
18
18%
3,155
142
Annual Turnover
Annual EBITDA
US$m
US$m
20
7
205
112
Capital Costs (Mine & Concentrator)
Capital Costs (Refinery)
Total Capital cost including Environmental
bond & PAP relocation
Operating Cost (Mine & Concentrator)
Operating Cost (Refinery)
Total Operating Costs
US$m
US$m
17
12
190
41
US$m
29
231
US$/kg (Nb205)
US$/kg (Nb205)
US$/kg (Nb205)
14.17
11.90
26.08
6.91
11.88
18.79
Project NPV/pre-tax (8%)
IRR (pre-tax)
US$m
%
20
32.54%
984
47.08%
Financial Commentary
•
Es�mated NPV 8% (pre-tax) confirmed at just over US$1B contribu�ng an IRR (pre-tax) just
under 50% over an updated 27-year life of mine.
•
A 15% reduc�on in unit cost of Niobium Pentoxide to US$18.90kg.
•
Gross margin increases to 71%, a 5% increase versus the 2021 DFS with an average selling price
forecast of US$51.48 per kg of NB205 and US$280 per kg for Ta205 over the life of the mine.
•
Ini�al Phase One Capex of US$29m including Environmental bond and project-affected people
reloca�on.
2
Summary of the op�misa�on results rela�ve to the 2021 DFS: Kanyika Niobium Project
Malawi
Metrics
Units
2021 DFS
2023 Optimisation Study
NPV 8% (pre-tax)
IRR (pre-tax)
Closing cash balance (LOM)
Total FCF pre-tax (LOM)
Life of Mine
Payback period (Yrs)
US$m
%
US$m
US$m
1,009
49.70%
4,361
3,759
23
1.3
1,004
47.08%
2,882
3,834
27
4.4
%
US$m
US$m
US$m
US$m
4,961
1,632
3,329
67.10%
2,838
4,645
134
4,511
4,785
1,395
3,390
70.83%
2,719
3,805
1,122
2,682
Total ore mined
Total ore including waste mined
Total concentrate produced
Total Nb205 production
Total Ta205 production
tons m
tons m
tons (000's)
tons (000's)
tons (000's)
33.8
87.1
186.3
73.3
3.2
33.8
87.2
414.0
73.8
3.3
Total unit cost per ton of ore
Total unit cost per ton of ore including
waste
US$
48
41
US$
19
16
Total unit cost (Per kg Nb205)
Selling price of Nb205 (per kg)
US$
US$
22.28
50.00
18.90
51.48
Revenue (LOM)
Cost of goods sold (LOM)
Gross Margin (LOM)
Gross Margin (LOM)
EBIT (LOM)
Net profit before tax (LOM)
Tax (LOM)
Net profit after tax (LOM)
Years
Years
US$m
US$m
US$m
Two-Phased Development Approach
Phase 1
1.
Low risk and low capital (es�mated total capital cost of US$29m) cost phase 1 (mine,
concentrator, and refinery development).
2.
Mine capacity of 86k tonnes per annum ROM, and 1,760 tonnes per annum of concentrate, for
shipment to the planned Lilongwe refinery.
3.
Deferral of the Milenje River Dam by 4 years (capital cost US$25m).
4.
The preferred loca�on of the phase 1 refinery is Malawi (this is subject to the finalisa�on
discussions with the Government of Malawi).
Phase 2
1.
Mine and concentrator ramp up in year 3 of opera�ons.
2.
Mine capacity development to 1.5m tonnes per annum and 17.7k tonnes per annum of
concentrate.
3
3.
Phase 2 Refinery to be built in Malawi (subject to finalisa�on of financial incen�ves with the
Government of Malawi).
Mine Concentrator Design Op�misa�on
1.
Replacement of SAG mill with the EDS horizontal mul�-sha� mill.
2.
Redesign of the two-stage flota�on circuit to a single stage, and the reduc�on of flota�on
reagents to 4 from 12 reagents.
3.
Op�misa�on of mass pull and recovery of concentrator.
4.
Dry tailings disposal and co-deposi�on with mine strip waste material.
Refining Technology
Switch in refining technology from the tradi�onal HF diges�on/solvent extrac�on process to the
carbochlorina�on process.
1.
The carbochlorina�on process involves reac�ng a mixture of charcoal and concentrate with
gaseous chlorine. The metal oxides in the ore convert to chlorides some of which have boiling
points below the 900oC reactor temperature. These chlorides leave the reactor, and the gas is
systema�cally cooled down allowing for the removal of separate metal chlorides. The
separated metal chlorides are purified before being oxidised to yield high-purity metal oxides.
2.
The Niobium oxide products will be sold into the speciality metals markets, realising premium
prices over the ferro-niobium market.
Preferred Refinery Loca�on – Malawi
1.
The Company has evaluated a number of op�ons for the loca�on of the Refinery, including the
UAE, Namibia, and Malawi.
2.
Malawi is the preferred loca�on of the Phase 1 refinery for the following key reasons:
(a)
Regulatory – ini�al discussions rela�ng to the regulatory requirements of opera�ng a
Class 7 facility in Malawi have been construc�ve and favourable to the Project.
(b)
Availability of land.
(c)
Ini�al discussions around a range of financial incen�ves to operate a refinery in Malawi
have been favourable.
(d)
Stable and low-risk country in which to operate.
(e)
Transparent and efficient legal and regulatory system.
(f)
Cost-effec�ve source of reagents, including salt (chlorine genera�on).
4
Sales and Marke�ng
Globe is focused on the produc�on of high purity Niobium Oxides and will not be compe�ng in the
mainstream ferro-niobium market. The high-purity Niobium oxide products will be sold into the
specialty metals markets, realising premium prices over the ferro-niobium market. The oxide market
includes all oxide grades from standard grade up to op�cal grades of 99.99% niobium pentoxide, thus
facilita�ng prices over US$50/kg.
ESG
Niobium is on the US cri�cal mineral list and has many applica�ons in the new economy. A key target
market is the fast-charging batery market. Using niobium as the anode is proven to allow faster and
safer charging, higher energy density, and safer performance.
Niobium (Nb) is an integral component of daily-use, energy-related, and specialty technologies and
structures such as in steels (for example, bridges, high-rise buildings, offshore pla�orms, oil and gas
pipelines, automobiles), superalloys (for example, aircra� engines, rocket assemblies, and solar power
generator engines), and superconduc�ng magnets (for example, medical imaging devices, and nuclear
power genera�on).
The Kanyika Project has been shown to be a botom quar�le cost project and is designed to ensure the
produc�on of “green Niobium” in that its Scope 1 and Scope 2 carbon emissions will be of the lowest in
the world, with hydroelectric and solar power domina�ng its power sources for both the mine site and
the refinery. The very low carbon footprint is also supported by a unique closed-cycle chlorina�on
refining process, which is transforma�ve for the industry.
Con�nua�on of metallurgical test work and refinery pilot plant
Globe con�nues to conduct metallurgical test work on the Kanyika ore concentrate to further develop
its inten�on to refine its produc�on to high-purity Niobium and Tantalum oxides. We refer to our
revised announcement on 27 October 2023, in which we announced the posi�ve extrac�on tests
resul�ng in the extrac�on of over 99% of both Niobium and Tantalum from the Kanyika concentrate.
Further test work is con�nuing, and the design and development of the refinery pilot plant is underway.
Grant Hudson, Globe’s CEO commented:
“The extremely positive results of the Optimisation Study reflect the continuing upward trajectory of this
exciting venture, and as the use of niobium soars, Globe is in the invidious position of being the most
advanced new niobium producer in the world. Our latest refinery technology initiatives, coupled with
our conflict-free status and outstanding green credentials, will further enhance Globe’s strong economic
proposition and I look forward to sharing this wonderful story with interested investors and off-take
partners at this week’s Mining Indaba in Cape Town.”
This announcement has been authorised for release by the Company’s Chief Executive Officer, Grant
Hudson.
5
For further information, please contact:
Grant Hudson
Chief Executive Officer
+61 8 6118 7240
gh@globemm.com
Paul Smith
Chief Operating Officer
+61 8 6118 7240
paul.smith@globemm.com
About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the regional centre of
Kasangu and is secured by Large-Scale Mining Licence No. LML0216/21 which grants the Company security of
tenure and the right to mine niobium, tantalum, and deleterious uranium.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have defined the extent of
mineralisa�on. Structured and progressive engineering studies have resulted in the current (JORC 2012) Mineral
Resource Es�mate (refer below) and given rise to significant improvements and simplifica�ons in the process
flowsheet.
In addi�on, Globe has undertaken substan�al metallurgical op�misa�on work and commissioned the pilot plant
design work to demonstrate and further op�mise metallurgical processes. Metallurgical op�misa�ons studies
have improved recoveries from 62% in 2012 to 75% today, through novel patented metallurgical processes.
The Kanyika opera�ons will produce a pyrochlore mineral concentrate that contains both niobium and tantalum in
commercially valuable volumes to be shipped to a refinery for advanced processing into high purity materials.
A Mineral Resource Es�mate for the Kanyika Niobium Project under the 2012 JORC guidelines was reported to
ASX on 11 July 2018 as follows:
6
Table 1: MRE for KNP using a 1,500 ppm Nb2 O5 lower cut
Category
Resource
(Mt)
Measured
5.3
Indicated
47
Nb2 O5 (ppm)
Table 2: MRE for KNP using a 3,000 ppm Nb2 O5 lower cut
Resource
(Mt)
Nb2 O5 (ppm)
Ta2 O5 (ppm)
Ta2 O5 (ppm)
Category
3,790
180
Measured
3.4
4,790
220
2,860
135
Indicated
16.6
4,120
160
Inferred
16
2,430
120
Inferred
2.8
4,110
190
TOTAL
68.3
2,830
135
TOTAL
22.8
4,220
190
Mineral Resource Es�mates
The informa�on in this report that relates to Mineral Resources is extracted from the report �tled “Kanyika Niobium Project –
Updated JORC Resource Es�mate” released to the Australian Securi�es Exchange (ASX) on 11 July 2018 and available to view
at www.globemm.com and for which Competent Persons’ consents were obtained. Each Competent Person’s consent remains
in place for subsequent releases by the Company of the same informa�on in the same form and context, un�l the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new informa�on or data that materially affects the informa�on included in the
original ASX announcement released on 11 July 2018 and, in the case of es�mates of Mineral Resources, that all material
assump�ons and technical parameters underpinning the es�mates in the original ASX announcement con�nue to apply and
have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are
presented have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 �tled “Kanyika Niobium Project – Updated JORC
Resource Es�mate” available to view at www.globemm.com.
7
Share your feedback
Discover