Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
Quarterly Report
For the quarter ended 30 September 2023
An emerging,
vertically integrated
niobium producer.
Globe Metals & Mining Limited
ABN 33 114 400 609
ASX: GBE
globemm.com
Niobium’s place in a technically advancing world.
For the quarter ended 30 September 2023
Kanyika Niobium Project
Ownership 100% | Malawi
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the
regional centre of Kasungu and secured by Mining Licence LML0216/21. Niobium is at the
forefront of numerous new-age technologies including fast charging batteries, super conductors,
nuclear SMRs, medical imaging, particle accelerators, aerospace but is also used in the
manufacture of everyday items such as optical glass applications, capacitors, and paint.
The Company aims to develop the world’s next niobium oxide plant in Namibia using feedstock from the
Kanyika Malawi site. Successful execution of an African niobium mine would greatly assist in alleviating
the current geographic concentration of major niobium suppliers (with two in South America and one in
Canada) resulting in the partial mitigation of existing supply chain risks for the whole industry.
The focus for the quarter was on raising capital to progress the feasibility study for Phase One ahead of
evaluating the Final Decision to Mine. This included advancing the “Phase One” design and establishing
confident costs estimates for capital and operating expenses.
Figure 1. Location of the mine and refinery.
2
For the quarter ended 30 September 2023
3
Further to an Entitlement Offer which closed on 31 August 2023 and raised approximately $6,122,384 in
proceeds and ahead of a Shortfall Offer to raise another $1,913,509, the Company now has the funds to
progress its next priority milestones:
•
completion of advanced sample test-work and other technical feasibility work;
•
metallurgical test work and commissioning of lab scale refinery pilot plant;
•
production of offtake samples;
•
confirmation of design parameters on full scale plant;
•
Namibia EIA data collection;
•
updating current Feasibility Study and financial model; and
•
establishing confident cost estimates for capital expenditure and operating expenses for the Phase
One Process Plant.
This adds to our recent progress in (i) securing key vendors and other appointments to advance Kanyika
(ii) obtaining an agreement to amend the timing for commencement of substantial mine development and
mineral production at the Project; and (iii) receiving further Government endorsement with a site visit
from the Honourable Monica Chang’anamuno (Minister of Mining) and the Honourable Ibrahim Matola
(Minister of Energy).
This capital raise has occurred at a crucial time in terms of development in the niobium market and has
been an important milestone in the plan towards securing offtakes and onboarding strategic investors in
the future.
Figure 2. Globe is developing its niobium operations according to a staged plan.
Globe was honoured to host Hon. Monica Chang’anamuno (Minister of Mining), Hon. Werani Chilenga
(Chair of Parliamentary Natural Resources Committee), Dr. Joseph Mkandawire (Principal Secretary in
Ministry of Mining), Samuel Sakhuta (Commissioner of Mines and Minerals), and Stanley Nyama
(Director of Geological Survey Department) in Perth in September 2023 as part of the Africa Down
Under Conference.
For the quarter ended 30 September 2023
Figure 3. Malawi Minister of Mining: Hon. Monica Chang’anamuno (Centre) with Globe Directors Mr Michael Barrett (Left)
and Mr Michael Choi (Right) at the Africa Down Under Conference in Perth, September 2023
4
For the quarter ended 30 September 2023
5
Niobium Market update
Niobium, often overshadowed by more well-known elements, is emerging as a silent hero in the
world of science and technology. Beyond its conventional uses, niobium is driving innovations
across various industries.
As niobium continues to reveal its hidden powers, it is shaping the future of memory technology and
influencing numerous other scientific and technological domains. Its remarkable properties make it an
unsung hero in a world craving efficient, sustainable, and high-performance solutions. Whether in data
storage, medical diagnostics, particle physics, or quantum computing, niobium is proving to be an
element of immense potential, poised to transform industries and redefine what's possible in science and
technology.
Niobium has a wide range of uses across various industries due to its unique properties. Some of the
diverse uses of niobium include:
•
Alloys: Niobium is commonly used as an alloying element in steel production. It improves the
strength, toughness, and corrosion resistance of the alloy. Niobium-based alloys are used in the
construction of pipelines, oil and gas exploration equipment, and automotive components.
•
Superconductors: Niobium is an important material in the field of superconductivity. It is used in the
production of superconducting wires and magnets for applications in medical imaging (MRI), particle
accelerators, and energy storage devices.
•
Nuclear industry: Niobium alloys are used in the nuclear industry due to their high-temperature
strength and resistance to corrosion. They are used in reactor components, fuel elements, and
cladding materials.
For the quarter ended 30 September 2023
6
•
Electronics: Niobium compounds, such as niobates, are used in electronic devices. For example,
lithium niobate is used in the production of piezoelectric devices, optical modulators, and surface
acoustic wave devices.
•
Aerospace and defence: Niobium superalloys are used in the aerospace and defence industries
due to their high strength, low density, and resistance to high temperatures. They are used in aircraft
engines, rocket nozzles, and other high-performance applications.
•
Medical implants: Niobium is biocompatible and has low toxicity, making it suitable for use in
medical implants such as pacemakers, orthopaedic implants, and dental implants.
•
Chemical processing: Niobium compounds are used as catalysts in various chemical processes,
including petroleum refining, hydrogenation reactions, and oxidation reactions.
•
Jewellery: Niobium's unique properties, such as its hypoallergenic nature and ability to be anodized
in various colours, make it a popular material for jewellery, especially for individuals with metal
allergies.
•
Batteries: Niobium oxide batteries can be fully charged in less than 10 minutes at lower operating
temperatures and can withstand more than 10,000 charge cycles. Niobium oxide can also increase
the energy density of batteries by 200%.
These are just a few examples of the diverse uses of niobium. Its combination of strength, corrosion
resistance, and other desirable properties make it a valuable material in various industries 1.
Key facts about the current Niobium market.
•
In 2020 Brazil accounted for ~91% of global primary niobium production.
•
Niobium ranked 2nd out of 50 critical minerals by the U.S. Department of the Interior in 2022.
•
Niobium was the only commodity for which both the United States and China are 100% net
import reliant.
•
Its increasing implementation into modern and energy-efficient, low emission technologies has
raised concerns over the possibility of supply restrictions related to its restricted geographic
resource distribution2.
Niobium's rise: Fueling faster charging, superconductors and quantum dreams, 5 September 2023;
https://www.theweek.in/news/sci-tech/2023/09/05/niobium-rise--fueling-faster-charging--superconductors-and-quant.html
1
Brazil’s CBMM expects niobium for batteries to make 25% of revenues by 2030, 13 September 2023;
https://www.fastmarkets.com/insights/brazils-cbmm-niobium-batteries-2030
Superconducting niobium waveguide achieves high-precision communications for B5G/6G networks, 2 October 2023;
https://www.eurekalert.org/news-releases/1003643
Niobium oxide plays a ‘network former’ role within silicate glass structures, 12 October 2023;
https://www.laserfocusworld.com/optics/article/14299972/niobium-oxide-plays-a-network-former-role-within-silicate-glassstructures
World’s Leading Niobium Anode Battery Materials Supplier (echiontech.com) 2023
Dalton M. McCaffrey, Nedal T. Nassar, Simon M. Jowitt, Abraham J. Padilla, Laurence R. Bird, Embedded critical material flow:
The case of niobium, the United States, and China, Resources, Conservation and Recycling, Volume 188, 2023, 106698, ISSN
0921-3449.
2
For the quarter ended 30 September 2023
•
7
Prices are significantly up on the last 360 days and the most noticeably in the last 4 months. 3
Figure 4 and 5. Asia metals downloads 23 October 2023.
To take advantage of the current escalation of interest in niobium oxides and the commensurate surge in
the price thereof, Globe is actively looking at ways to enter the market more quickly. This would allow
Globe to establish a strategic foothold and, in this regard, ongoing discussions are being held with our
partners to chart the optimum way forward.
3
https://www.asianmetal.com/Niobium/
For the quarter ended 30 September 2023
8
Corporate
Cash at Bank
Cash at bank and term deposits at 30 September 2023 was $4.356 million (30 June 2023: $0.245
million).
During the quarter Globe completed a pro-rata non-renounceable entitlement offer of three (3) new fully
paid ordinary shares for every seven (7) shares, raising approximately $6,122,384 in proceeds 4. The
raising will allow the Company to progress its next priority milestones, and funds will be used for:
• Technical feasibility work at the Project;
• Metallurgical test work and pilot plant work at the Project;
• Mine and refinery preparation and planning costs at the Project;
• Director loan repayments (refer below); and
• Corporate, operating and marketing costs, and costs associated with the Entitlement Offer.
Of the $6,122,384 in proceeds received from the entitlement offer, $1,274,871 was not received in cash.
Instead, it was agreed that this amount (which was owed to Triple Talent Enterprises Ltd (Triple Talent),
an entity associated with Director Bo Tan, pursuant to various outstanding loan facilities) be set-off
against Triple Talent’s commitment to subscribe for additional shares under the entitlement offer at an
issue price of $0.037 per share, subject to shareholder approval.
As at 26 October 2023, the total amount owed to Triple Talent under the loan facilities was $1,274,871.
On 26 October 2023, shareholders approved the issue of 34,455,972 shares, at an issue price of
A$0.037 per share, to Triple Talent as full repayment of all outstanding loan facilities.
Appointment of Market Development Consultant
On 31 August 2023, the Company announced the appointment of Mr Rogerio Magalhães Pastore as a
consultant to assist Globe with marketing of its niobium oxide and metals products, negotiating offtakes
and generating strategic business opportunities.
Previously, Mr Pastore spent over 11 years at CBMM, the world’s leading supplier of niobium products
and technology, where he rose to the position of Head of Market Development for Energy Materials
Technology. In this role he led the implementation of go-to-market (B2B) strategies for the energy sector
worldwide, integrating the commercial, technological, and marketing teams and seeking market growth
and development of new technologies 5.
4
5
Refer ASX Announcement dated 4 September 2023: Results of Entitlement Offer.
Refer ASX Announcement dated 31 August 2023: Appointment of Market Development Consultant.
For the quarter ended 30 September 2023
9
Change in Auditor
During the quarter, Globe announced that, in accordance with ASX Listing Rule 3.16.3, BDO Audit Pty
Ltd (BDO) had been appointed as auditor of the Company effective from 4 July 2023 6.
Malawi: Appointment of Legal Counsel
Mr. Alan J. William Chinula SC has been appointed as legal counsel for Globe Metals and Mining (Africa)
Limited. Mr. Chinula acts on behalf of a number of other ASX-listed companies operating in Malawi and
has had an enviable working career. His appointment is welcomed by the Board.
Tranche Two Placement
During the quarter, the Company announced that it had terminated its engagement of Viriathus Capital
Pty Ltd as Globe’s advisor and lead manager of the Placement. Consequently, the Company will not be
proceeding with tranche two of the Placement 7.
ASX Additional Information
ASX Listing Rule 5.3.1: There were no substantive mining exploration activities during the quarter. Work
was confined to evaluation. The Company expended $Nil on evaluation activities (refer section 2.1(d) of
Appendix 5B).
ASX Listing Rule 5.3.2: There were no substantive mining production and development activities during
the quarter.
ASX Listing Rule 5.3.5: A total of $81,000 was paid to related parties during the quarter comprising NonExecutive Directors’ fees (including superannuation).
ASX Announcements during the Quarter
The following announcements were lodged on the ASX Market Announcements Platform during the
quarter:
6
7
Date
Description
4-Jul-23
24-Jul-23
25-Jul-23
31-Jul-23
31-Jul-23
31-Jul-23
4-Aug-23
4-Aug-23
4-Aug-23
4-Aug-23
4-Aug-23
7-Aug-23
17-Aug-23
Details of Auditor Appointment/Resignation
Change in substantial holding
Change in substantial holding
Notification regarding unquoted securities – GBE
Tranche Two Placement - Update
Quarterly Activities/Appendix 5B Cash Flow Report
Entitlement Offer to raise up to $8 million
Entitlement Offer Prospectus
Proposed issue of securities – GBE
Investor Presentation
Notice to Optionholders – Entitlement Offer
Update – Proposed issue of securities - GBE
Entitlement Offer open and dispatch of Prospectus
Refer ASX Announcement dated 4 July 2023: Change in Auditor.
Refer ASX Announcement dated 31 July 2023: Tranche Two Placement – Update.
For the quarter ended 30 September 2023
17-Aug-23
31-Aug-23
4-Sep-23
7-Sep-23
11-Sep-23
11-Sep-23
12-Sep-23
12-Sep-23
15-Sep-23
22-Sep-23
22-Sep-23
29-Sep-23
10
Notice to Ineligible Shareholders – Entitlement Offer
Appointment of Market Consultant
Results of Entitlement Offer
Application for quotation of securities – GBE
Appendix 3Y – Alice Wong
Appendix 3Y – Bo Tan
Change in substantial holding
Change in substantial holding
Becoming a substantial holder
Notice of General Meeting/Proxy Form
Letter to Shareholders – Notice of General Meeting
Full Year Statutory Accounts
These announcements are available for viewing on the Company’s website www.globemm.com.
Shareholding Information
At 30 September 2023, shares on issue totalled: 637,782,562. The number and distribution of holders at
30 September 2023 was:
Units
Number
Total Units
%
64
40
65
324
153
646
1,826
133,539
524,061
14,289,983
622,833,153
637,782,562
0.00%
0.02%
0.08%
2.24%
97.66%
100.00%
1 - 1,000
1,001 – 5,000
5,001 – 10,000
10,001 – 100,00
100,001 and above
Total
Top 20 Holders at 30 September 2023
Position
Holder Name
1
2
APOLLO METALS INVESTMENT COMPANY LIMITED
AO-ZHONG INTERNATIONAL MINERALRE SOURCES
PTY LTD
TRIPLE TALENT ENTERPRISES LTD
BNP PARIBAS NOMINEES PTY LTD ACF
CLEARSTREAM
MR COLIN ROBERT SEARL &
MRS CYNDA SEARL
CITICORP NOMINEES PTY LIMITED
BNP PARIBAS NOMS PTY LTD
<DRP>
M & K KORKIDAS PTY LTD
<M & K KORKIDAS PTY LTD A/C>
MR RICHARD ULRICK &
MRS WENDY ULRICK
<ULRICK SUPER FUND A/C>
GOENG INVESTMENTS PTY LTD
<GOENG PENSION FUND A/C>
HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED A/C 2
C & CR SUPERCO PTY LTD
<C & CR SEARL SUPERFUND A/C>
3
4
5
6
7
8
9
10
11
12
Holding
% IC
351,405,158
118,143,062
55.10%
18.52%
34,972,690
13,924,329
5.48%
2.18%
11,568,571
1.81%
8,351,260
5,172,248
1.31%
0.81%
4,398,808
0.69%
3,934,439
0.62%
3,858,697
0.61%
3,459,844
0.54%
3,333,888
0.52%
For the quarter ended 30 September 2023
13
14
15
16
17
18
18
19
20
11
GOTHA STREET CAPITAL PTY LTD
<BLUE SKY NO 2 A/C>
BENRET PTY LTD
<COLIN SEARL FAMILY A/C>
MR KELLY PETER BODMAN
MR NOEL MALCOLM SCAMMELL
MR DRITAN MEHMETI
MR ALI SUSANTO &
MRS SIMPATIHATY TANDADJAJA
MR MARK LEONARD SWANSON
BNP PARIBAS NOMINEES PTY LTD
<IB AU NOMS RETAILCLIENT DRP>
Total
Total Issued Capital
3,021,810
0.47%
2,789,545
0.44%
2,520,562
2,405,035
2,000,000
1,751,714
0.40%
0.38%
0.31%
0.27%
1,725,000
1,517,423
0.27%
0.24%
580,254,083
637,782,562
90.98%
100.00%
Schedule of Mineral Tenements as at 30 September 2023
Country Project Type
Status
Tenement
Mining
Licence
Granted
LML0216/21*
Malawi
Kanyika
Interest held by Globe
30 Jun 2023
30 Jun 2023
100%
100%
There were no tenements acquired or disposed during the quarter.
* Pursuant to the Mines and Minerals Act, the Malawi Government is entitled to a 10% free equity interest
in LML0216/21 subject to formally notifying GMMA of its desire to take up its entitlement. As at the date
of this report, neither Globe nor GMMA has received any such notice.
Authorisation for Release
This report has been authorised for release by the Company’s Chief Executive Officer, Grant Hudson.
For further information, please contact:
Grant Hudson
Chief Executive Officer
+61 8 6118 7240
gh@globemm.com
For the quarter ended 30 September 2023
12
Qualifying Statements
Mineral Resources Estimates
The information in this report that relates to Mineral Resources is extracted from the report titled
“Kanyika Niobium Project – Updated JORC Resource Estimate” released to the Australian Securities
Exchange (ASX) on 11 July 2018 and available to view at www.globemm.com and for which Competent
Persons’ consents were obtained. Each Competent Person’s consent remains in place for subsequent
releases by the Company of the same information in the same form and context, until the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the
information included in the original ASX announcement released on 11 July 2018 and, in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the
estimates in the original ASX announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Persons’ findings are presented
have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 titled “Kanyika Niobium
Project – Updated JORC Resource Estimate” available to view at www.globemm.com.
The information in this report that relates to Ore Reserves is extracted from the report titled “Kanyika
Niobium Project – Project Feasibility and Economics” released to ASX on 19 August 2021 and available
to view at www.globemm.com and for which Competent Persons’ consents were obtained. Each
Competent Person’s consent remains in place for subsequent releases by the Company of the same
information in the same form and context, until the consent is withdrawn or replaced by a subsequent
report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the
information included in the original ASX announcement released on 19 August 2021 and, in the case of
estimates of Ore Reserves, that all material assumptions and technical parameters underpinning the
estimates in the original ASX announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Persons’ findings are presented
have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 19 August 2021 titled “Kanyika Niobium
Project – Project Feasibility and Economics” available to view at www.globemm.com.
Disclaimer
This report has been prepared by Globe Metals & Mining Limited (Company). The material contained in
this report is for information purposes only. This release is not an offer or invitation for subscription or
purchase of, or a recommendation in relation to, securities in the Company and neither this release nor
anything contained in it shall form the basis of any contract or commitment.
This report may contain forward-looking statements. Forward-looking statements include, but are not
limited to, statements concerning the Company’s business plans, intentions, opportunities, expectations,
capabilities, and other statements that are not historical facts. Forward-looking statements include those
containing such words as could-plan-target-estimate-forecast-anticipate-indicate-expect-intend-may-
For the quarter ended 30 September 2023
13
potential-should or similar expressions. Such forward-looking statements are not guarantees of future
performance and involve known and unknown risks, uncertainties, assumptions, and other important
factors, many of which are beyond the control of the Company, and which could cause actual results to
differ from those expressed in this report. Because actual results might differ materially to the information
in this report, the Company does not make, and this report should not be relied upon as, any
representation or warranty as to the accuracy, or reasonableness, of the underlying assumptions and
uncertainties. Investors are cautioned to view all forward-looking statements with caution and to not
place undue reliance on such statements.
The report has been prepared by the Company based on information available to it, including information
from third parties, and has not been independently verified. No representation or warranty, express or
implied, is made to the fairness, accuracy or completeness of the information or opinions contained in
this report.
The Company estimates its reserves and resources in accordance with the Australasian Code for
Reporting of Identified Mineral resources and Ore Reserves 2012 Edition (JORC Code), which governs
such disclosures by companies listed on ASX.
For the quarter ended 30 September 2023
14
Appendix A: About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the regional centre of
Kasungu and is secured by Large-Scale Mining Licence No. LML0216/21 which grants the Company security of
tenure and the right to mine niobium, tantalum, and deleterious uranium.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have defined the extent of mineralisation.
Structured and progressive engineering studies have resulted in the current (JORC 2012) Mineral Resource
Estimate (refer below) and given rise to significant improvements and simplifications in the process flowsheet.
In addition, Globe has undertaken substantial metallurgical optimisation work and commissioned the pilot plant
design work to demonstrate and further optimise metallurgical processes. Metallurgical optimisations studies have
improved recoveries from 62% in 2012 to 75% today, through novel patented metallurgical processes.
The Kanyika operations will produce a pyrochlore mineral concentrate that contains both niobium and tantalum in
commercially valuable volumes to be shipped to a refinery for advanced processing into high purity materials.
A Mineral Resource Estimate for the Kanyika Niobium Project under the 2012 JORC guidelines was reported to
ASX on 11 July 2018 as follows:
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Globe Metals & Mining Limited
ABN
Quarter ended (“current quarter”)
33 114 400 609
30 September 2023
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3 months)
$A’000
(424)
(424)
(369)
(369)
-
-
-
-
(793)
(793)
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) exploration & evaluation
-
-
(e) investments
-
-
(f)
-
-
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (provide details if material)
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Current quarter
$A’000
Year to date
(3 months)
$A’000
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
-
-
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
4,848
4,848
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(344)
(344)
3.5
Proceeds from borrowings
400
400
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
4,904
4,904
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
245
245
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(793)
(793)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
-
-
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
4,904
4,904
Consolidated statement of cash flows
2.2
Proceeds from the disposal of:
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3 months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
4,356
4,356
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
4,356
4,356
4,356
4,356
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
81
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
The payments made to directors of the entity and their associates reported at 6.1 were comprised as
follows:
A$’000
Non-executive directors’ fees
81
TOTAL
81
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
1,200
1,200
1,200
1,200
7.1
Loan facilities
7.2
Credit standby arrangements
7.3
Other (please specify)
7.4
Total financing facilities
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
At the end of the quarter, the total amount of all outstanding loan facilities provided to the
Company was A$1.2 million. The debt of A$1.2 million (plus interest) comprised 3 separate
loan facilities provided by Director Bo Tan, each of which was assigned to Triple Talent
Enterprises Ltd (Triple Talent), an entity associated with Mr Tan, on or about 29 August 2023.
A description of each loan facility is as follows:
-
First Loan Facility
• Lender: Triple Talent (previously Bo Tan)
• Facility Limit: A$400,000
• Interest Rate: 8% per annum
• Default Interest Rate: 20% per annum
• Maturity Date: 4 November 2023
• Security: the loan is unsecured
• Repayment: repayable in cash or, subject to shareholder approval, by the issue of fully
paid ordinary shares at an issue price of A$0.037.
Second Loan Facility
• Lender: Triple Talent (previously Bo Tan)
• Facility Limit: A$600,000
• Interest Rate: 8.3% per annum
• Default Interest Rate: 20% per annum
• Maturity Date: 4 November 2023
• Security: the loan is unsecured
• Repayment: repayable in cash or, subject to shareholder approval, by the issue of fully
paid ordinary shares at an issue price of A$0.037.
Third Loan Facility
• Lender: Triple Talent (previously Bo Tan)
• Facility Limit: A$200,000
• Interest Rate: 8.