27 October 2023
Correction to Announcement: Positive metallurgical testwork
results achieved on concentrate material from the Kanyika
Project, with extraction of both Niobium and Tantalum above
99%
The ASX announcement titled “Positive metallurgical testwork results achieved on concentrate material
from the Kanyika Project, with extraction of both Niobium and Tantalum above 99%” on 24 October
2023 has been amended as follows:
BODY OF TEXT
•
An additional paragraph is included in the section titled “Process overview” which references the
JORC Table 1 from the ASX announcement dated 19 August 2021: “Kanyika Niobium Project –
Project Feasibility and Economics” and provides further information on the bulk sample for this
metallurigical testwork.
•
A competent person statement for the exploration results is included.
APPENDIX A
•
A completed Table 1, Sections 1 and 2 of the JORC Code (including a location map for the test
material) is included.
This announcement has been authorised for release by the Company’s Chief Executive Officer, Grant
Hudson.
For further information, please contact:
Grant Hudson
Chief Executive Officer
+61 8 6118 7240
gh@globemm.com
Gareth Quinn
Media and Investor Relations
+61 417 711 108
gareth@republicpr.com.au
Globe Metals & Mining Limited
ABN 33 114 400 609
45 Ventnor Avenue
West Perth WA 6005
ASX: GBE
+61 8 6118 7240
info@globemm.com
globemm.com
ASX Announcement
27 October 2023
Positive metallurgical testwork results achieved on
concentrate material from the Kanyika Project, with
extraction of both Niobium and Tantalum above 99%
Globe Metals & Mining Limited (ASX: GBE) (Globe or Company) is pleased to announce that it has
received positive metallurgical testwork results on the concentrate material from the Kanyika Niobium
Project (Project), with extraction of both Niobium and Tantalum above 99%.
Test work results
TCM Research Ltd (TCM) is currently conducting a metallurgical testwork program for the application of
its proprietary vapour metallurgical processes on a concentrate sample sourced from the Project.
The initial base-line test (OR1) showed 98% Niobium and 90% Tantalum extraction. Based on this
encouraging result, a series of kinetics and optimization tests were conducted. This culminated in tests
(OR12 & OR13) showing above 99% extraction for both Niobium and Tantalum.
Extraction %
Test
OR1
OR12
OR13
Nb2O5
98,1%
99,9%
99,9%
Ta2O5
89,7%
99,8%
99,8%
TiO2
99,4%
99,9%
99,9%
ZrO2
53,2%
92,7%
95,9%
The tests further demonstrate high extraction yields for other potentially marketable products, namely
Titanium and Zirconium, with extraction yields of above 99% and 96% respectively.
With an extraction of 99.9% achieved on OR13, the expectation of the engineering team is that the
overall recovery across the refinery will be 99% comparing favourably to Globe’s August 2021 feasibility
study of 95% based on the HF process.
The test results validate the decision to move from using a hydrofluoric acid and sulphuric acid-based
process with fluoride and sulphate rich wastes that need to be neutralised and disposed of to a
chlorination-based process with no such toxic waste and where chlorine is regenerated and recycled.
Globe expects that partners, off-takers and future buyers will demand a sustainable Niobium oxide
supply and the chlorination process meets that requirement. The metallurgical testwork program has
now advanced to the next stage with separation and refining tests well underway.
Process overview
The process employs a selective reductive chlorination technique, where the target metals are
volatilized and thereby removed from the host matrix. These metals can be further separated and
purified to produce individual metals or compounds. The basis of the process is the formation metal
chlorides, with differing melting and boiling point temperatures, allowing for downstream processing.
The second stage of the process involves the refining and production of saleable products. Metal
Chlorides can be separated and refined via vapour metallurgical (dry) techniques, fractional
condensation, de-sublimation, fractional distillation, chemical vapour transport and halide substitution.
The final stage of the process is where product differentiation options can be explored, with the ability
to produce a range of saleable forms: mixtures or individual; chlorides, fluorides, oxides, carbonates,
hydroxides, metals, or metal alloys and powders.
Specifically for Niobium/Tantalum concentrates where Niobium and Tantalum are usually the only
metals extracted, TCM presents the opportunity to produce commercial co-products from other
constituents in the concentrate like Titanium, Zircon, and Iron, and potentially the recovery of any rare
earth elements present.
The process has numerous intrinsic benefits, including:
•
Dry process – offering a substantial (CAPEX, OPEX, environmental) advantage over the
previously considered (HF/H2SO4) process in eliminating the infrastructure requirements and
complexity of wastewater and effluent monitoring and treatment.
•
Producing a diverse range of value-added products.
•
Revenue generating co-products limit the effects of downturns in commodity price cycles.
•
Energy – Exothermic upfront extraction process providing a substantial amount of energy for
re-utilization in other process areas (eg. concentrate drying) or for on-site power generation.
•
Smaller, more efficient, self-sustaining process plants. On-site reagent generation and recycling
substantially reduces input logistics, costs, and overall carbon footprint. Thus, offering a higher
level of internal control over Scope 1, 2 and 3 emissions.
•
Low Waste and Tailings potential – improving overall project value and acceptance, reducing
the burden of environmental bonds, remediation, and closure liabilities.
•
The technology offers superior overall ESG potential; facilitating stakeholder buy-in and
attracting appropriate investment and like-minded suppliers, service providers, clients, and end
users.
The JORC Table 1 (refer Appendix A) is reproduced from the ASX announcement dated 19 August 2021:
“Kanyika Niobium Project – Project Feasibility and Economics”. Additional information has been
included where it pertains to the extraction of a 40 tonne bulk sample taken in 2013, including locations
and assays. This sample was sent to the Guangzhou Research Institute of Non-Ferrous Metals (GZRINM)
2
in China for process optimisation. After laboratory optimisation, the remaining sample was processed
through a pilot plant to produce Kanyika concentrate. The results of this optimisation were outlined in
the ASX announcement dated 21 October 2014: “Kanyika Demonstration Plant Completed with
Outstanding Results”. Concentrate extracted from the 40 tonne bulk sample in 2013 has been used for
the additional testing reported on in this announcement.
About TCM Research
TCM is headquartered in Ireland, with representation in Canada, South Africa and USA, and has been
established to develop, apply, and commercialize a suite of Vapour Metallurgy, Processing and
Manufacturing Technologies that are innovative, environmentally responsible, highly competitive while
adding value exponentially beyond their cost.
TCM has developed a suite of Vapour Metallurgy processing technologies for the treatment of a vast
range of materials for the recovery of metals, including Niobium, Tantalum, Iron, Titanium, Vanadium,
Tin, Tungsten, and Rare Earth Elements. The process offers the ability to produce a range of high value
products for a diverse and growing range of industries, capturing increased benefit along the supply
and value chain. The aim is to bridge the gap between the mining and manufacturing industries,
thereby reducing overall environmental impact.
Commen�ng on the test results, Globe’s CEO Grant Hudson said:
“An extrac�on of >99% is a marvellous result as we con�nue to maximise the efficiencies of our various
processes, and will have a direct, posi�ve and project-long effect on our profitability. Combined with its
superior ESG profile these outcomes con�nue to validate our decision to switch to chlorina�on
technology in our refinery and I look forward to posi�ve results from the next stage of test-work”.
Authorisation for Release
This announcement has been authorised for release by the Company’s Chief Executive Officer, Grant
Hudson.
For further information, please contact:
Grant Hudson
Chief Executive Officer
+61 8 6118 7240
gh@globemm.com
Gareth Quinn
Media and Investor Relations
+61 417 711 108
gareth@republicpr.com.au
Competent Person Statement
Kanyika Niobium Project – Process Metallurgy
The technical information in this report that relates to process metallurgy is based on work completed
by TCM Research Ltd and information reviewed by Mr Rex Zietsman, who is the Chief Technology Officer
and an employee of Globe Metals & Mining Ltd. Mr Zietsman is a registered professional engineer (Pr
Eng) with the Engineering Council of South Africa, registration number 20140376, and has sufficient
experience that is relevant to the type of processing under consideration and to the activity being
3
undertaken to qualify as a Competent Person as defined by the JORC Code 2012. Mr Zietsman consents
to the inclusion in the report of the matters based on his information in the form and context in which it
appears.
About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the regional centre of
Kasangu and is secured by Large-Scale Mining Licence No. LML0216/21 which grants the Company security of
tenure and the right to mine niobium, tantalum, and deleterious uranium.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have defined the extent of
mineralisa�on. Structured and progressive engineering studies have resulted in the current (JORC 2012) Mineral
Resource Es�mate (refer below) and given rise to significant improvements and simplifica�ons in the process
flowsheet.
In addi�on, Globe has undertaken substan�al metallurgical op�misa�on work and commissioned the pilot plant
design work to demonstrate and further op�mise metallurgical processes. Metallurgical op�misa�ons studies
have improved recoveries from 62% in 2012 to 75% today, through novel patented metallurgical processes.
The Kanyika opera�ons will produce a pyrochlore mineral concentrate that contains both niobium and tantalum in
commercially valuable volumes to be shipped to a refinery for advanced processing into high purity materials.
A Mineral Resource Es�mate for the Kanyika Niobium Project under the 2012 JORC guidelines was reported to
ASX on 11 July 2018 as follows:
4
Table 1: MRE for KNP using a 1,500 ppm Nb2 O5 lower cut
Category
Resource
(Mt)
Measured
5.3
Indicated
47
Nb2 O5 (ppm)
Table 2: MRE for KNP using a 3,000 ppm Nb2 O5 lower cut
Resource
(Mt)
Nb2 O5 (ppm)
Ta2 O5 (ppm)
Ta2 O5 (ppm)
Category
3,790
180
Measured
3.4
4,790
220
2,860
135
Indicated
16.6
4,120
160
Inferred
16
2,430
120
Inferred
2.8
4,110
190
TOTAL
68.3
2,830
135
TOTAL
22.8
4,220
190
Mineral Resource Es�mates
The informa�on in this report that relates to Mineral Resources is extracted from the report �tled “Kanyika Niobium Project –
Updated JORC Resource Es�mate” released to the Australian Securi�es Exchange (ASX) on 11 July 2018 and available to view
at www.globemm.com and for which Competent Persons’ consents were obtained. Each Competent Person’s consent remains
in place for subsequent releases by the Company of the same informa�on in the same form and context, un�l the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new informa�on or data that materially affects the informa�on included in the
original ASX announcement released on 11 July 2018 and, in the case of es�mates of Mineral Resources, that all material
assump�ons and technical parameters underpinning the es�mates in the original ASX announcement con�nue to apply and
have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are
presented have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 �tled “Kanyika Niobium Project – Updated JORC
Resource Es�mate” available to view at www.globemm.com.
5
ANNEXURE A
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
Logging
JORC Code explanation
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such
as down hole gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as limiting the
broad meaning of sampling.
Commentary
In 2013, a 40t bulk sample was collected in four locations using a TLB (tractor, loader, backactor). The sample was
agglomerated and packed into drums. Assay samples of were taken from each drum.
This sample was sent to Guangzhou Research Institute for on-Ferrous Metals (GZRINM) for metallurgical process
optimization. After optimization, the remaining sample was processed through a pilot plant to produce concentrate. The
results of this optimization were declared in the ASX release “Kanyika Demonstration Plant Completed with Outstanding
Results” dated 21 October 2014.
Include reference to measures taken to ensure sample
representation and the appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of mineralisation that are
Material to the Public Report.
In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for fire assay’). In other
cases, more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g.
submarine nodules) may warrant disclosure of detailed
information.
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Method of recording and assessing core and chip sample
recoveries and results assessed.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies
and metallurgical studies.
The four locations selected were at outcroppings of the orebody that had already been determined by drilling.
The four locations selected were at outcroppings of the orebody that had already been determined by drilling.
A TLB dug trenches at each location.
Not applicable – trench sample taken.
Not applicable – trench sample taken.
Not applicable – trench sample taken.
No logging was carried out as this was a trench sample.
1
Criteria
Sub-sampling
techniques and
sample
preparation
JORC Code explanation
Whether logging is qualitative or quantitative in nature.
Core (or costean, channel, etc.) photography.
The total length and percentage of the relevant
intersections logged
Commentary
See above.
If core, whether cut or sawn and whether quarter, half or all core
taken.
Not core.
If non-core, whether riffled, tube sampled, rotary split, etc. and
whether sampled wet or dry.
Sample was loaded into drums until a total of 40t of sample had been collected. This sample was then sent to Guangzhou
Research Institute for Non-Ferrous Metals (GZRINM) where it was processed to produce a concentrate.
The bulk sample optimization and concentrate production was covered in an ASX press release “Kanyika Demonstration
Plant Completed with Outstanding Improvements” dated 21 October 2014.
One sample per drum was taken. Surface and depth samples were taken from each of the locations and composited.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted for all sub-sampling stages to
maximise representation of samples.
Not applicable.
One sample per drum was taken.
Assays from samples taken at surface and at depth:
Assays in %
Nb2O5
Ta2O5
ZrO2
SiO2
Fe2O3
Al2O3
P2O5
U3O8
Composite
0.42
0.027
0.39
52.42
1.19
21.3
0.081
0.007
3
Surface
0.9
0.042
0.73
53.86
3.36
19.27
0.21
_
Deep
0.25
0.021
0.273
53.4
0.86
21.19
0.023
_
Bulk sample assay information
Pit
Name of sample
Type/Interv
al
Analysis result in %
Nb2O5
ZrO2
KPTN001
KPTN001-N1-02
Bulk Pit
0.3297
0.287
KPTN001
KPTN001-N1-08
Bulk Pit
0.3415
0.297
KPTN001
KPTN001-N1-14
Bulk Pit
1.2355
0.86
KPTN001
KPTN001-N1-21
Bulk Pit
1.0343
1.449
KPTN001
KPTN001-N1-29
Bulk Pit
1.366
0.685
KPTN002
KPTN002-N2-03
Bulk Pit
0.6909
0.822
KPTN002
KPTN002-N2-10
Bulk Pit
0.702
0.64
KPTN002
KPTN002-N2-13
Bulk Pit
0.6073
0.534
KPTC001
KPTC001-C-01
Bulk Pit
0.215
0.179
2
Criteria
Quality of assay
data and
laboratory tests
JORC Code explanation
Commentary
KPTC001
KPTC001-C-06
Bulk Pit
0.2411
0.2
KPTC001
KPTC001-C-14
Bulk Pit
0.2276
0.196
KPTC001
KPTC001-C-22
Bulk Pit
0.2294
0.117
KPTC001
KPTC001-C-28
Bulk Pit
0.2377
0.134
KPTC001
KPTC001-C-36
Bulk Pit
0.2261
0.127
KPTC001
KPTC001-C-46
Bulk Pit
0.2184
0.098
KPTS001
KPTS001-S1-04
Bulk Pit
0.274
0.365
KPTS001
KPTS001-S1-13
Bulk Pit
0.2433
0.239
KPTS001
KPTS001-S1-26
Bulk Pit
0.2788
0.284
KPTS001
KPTS001-S1-34
Bulk Pit
0.2534
0.27
KPTS001
KPTS001-S1-44
Bulk Pit
0.25
0.368
Measures taken to ensure that the sampling is representative of the
in-situ material collected, including for instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The location of the four outcroppings were overlaid on the orebody model to confirm that they were outcroppings of
the orebody. Subsequent assays showed this to be the case.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
Samples were prepared at Genalysis (Johannesburg) and analysed at the Genalysis Perth Laboratory. The analytical
method used was ICP mass spectrometry following a sodium peroxide fusion. The pertinent elements analysed were Nb,
Ta, U and Zr with each reported in elemental ppm.
No applicable as a 40t bulk sample was taken.
Difficulty in analysing Nb and Ta was noted and is probably due to the concentration of hydrofluoric acid in the final
digestion solution and the stability of metal complexes with time. Variable concentrations will affect the ability of the
aliquot to retain Nb and Ta for an extended period for some sample matrices, which will result in variable degrees of Nb
and Ta precipitation in different samples.
For geophysical tools, spectrometers, handheld XRF instruments,
etc., the parameters used in determining the analysis including
instrument make and model, reading times, calibrations factors
applied and their derivation, etc.
Total count Scintillometer readings of the large RC bags were routinely taken and used as a field check for geological
domains.
Samples were prepared and analysed at SANAS ISO/IEC 17025 accredited UIS Analytical (Pretoria, South Africa). The
analytical method used was XRF spectroscopy following a lithium metaborate fusion. The pertinent elements analysed
were Nb, Ta, Fe, Ti, U and Zr with each reported in oxide %. Loss on ignition (LOI) is determined gravimetrically at 1000˚C
degrees.
3
Criteria
JORC Code explanation
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision have
been established.
Commentary
Standards, blanks and field duplicates have been routinely submitted on a ratio of one standard, one blank and one
duplicate for every 20 drilled samples.
Reference material CAN-1 and CAN-2 were prepared by Ore Research & Exploration Pty Ltd of Melbourne from two 125
kg bulk samples of representative mineralised alkali granitoid from Kanyika. Both standards were certified in a program
with ten laboratories, for Nb, Ta, U, and Zr. CAN-1 is certified at 2,237 ppm Nb and CAN2 as 7,144 ppm Nb.
Checks (repeat analysis and duplicates samples) were completed as part of the determination of the chemical composition
of the samples.
Verification of
sampling and
assaying
The verification of significant intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Location of data
points
Data spacing and
distribution
Orientation of
data in relation
to geological
structure
Sample security
Accuracy and quality of surveys used to locate drill holes (collar and
down-hole surveys), trenches, mine workings and other locations
used in Mineral Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic control.
Data spacing for reporting of Exploration Results.
Analysis of standards is included for every batch of samples.
The onsite geologist, Mr Chris Ngwena, verified that the locations of the four outcroppings were indeed part of the
orebody.
Four different trenches were used to collect bulk sample.
All sampling, geological logging and assay data has been captured digitally using standard file structure protocols and is
stored in the Globe Access database, managed by BMGS in Perth. Copies of the database are held by Globe and various
approved consultants.
No adjustments to assay data.
All the trenches were accurately positioned using the prevailing industry standards.
Grid projection is WGS 84 (Zone 36S) as at 30 June 2018.
The surveying of trenches by Differential GPS formed part of the topographic control. Supporting this dataset were
elevation spot heights determined from satellite remote sensing.
Not applicable as trenches were dug where the outcroppings occurred.
Whether the data spacing and distribution is sufficient to establish
the degree of geological and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation procedure(s) and
classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased sampling of
possible structures and the extent to which this is known,
considering the deposit type.
Not applicable as trenches were dug where the outcroppings occurred.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and reported if
material.
The measures taken to ensure sample security.
The bulk sample trenches were aligned with the outcroppings and in the direction of the orebody.
No compositing has been undertaken.
Four mineralised zones have been identified. These strike 020° and dip to the WNW at ~40°-80°. Most of the drill holes
defining the mineralisation are inclined -55° to the east. 18 scissor holes were drilled to the west to test downhole
continuity. Consequently, the orientation of the sampling relative to the deposit geometry limits bias.
Individual plastic bags containing samples were packed in large rice bags and sealed with cable ties. They were transported
by four-wheel drive or 3-tonne hired trucks. Samples were delivered to Globe’s Lilongwe office and then to the
Department of Mines for inspection and export permits. After inspection the truck travelled to the airport where the
samples were offloaded and weighed again at the secure premises of Manica Freight. The samples were then loaded onto
the aircraft for transport to Johannesburg and collection by Genalysis. A Company representative was always on hand to
4
Criteria
Audits or reviews
JORC Code explanation
The results of any audits or reviews of sampling techniques and
data.
Commentary
oversee the packing, transportation and delivery to Manica Freight. Genalysis (Johannesburg) handled the arrangements
for pulps to be delivered to Genalysis Perth.
Individual samples were packaged into plastic containers, suitably marked and delivered to UIS Analytical by a
representative from TCM Research.
None carried out.
Section 2 Reporting of Exploration Results
Criteria
Mineral
tenement and
land tenure
status
JORC Code explanation
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint
ventures, partnerships, overriding royalties, native title interests,
historical sites, wilderness or national park and environmental
settings.
Commentary
All of the Kanyika drilling is situated within EPL0421/15. The Company’s Mining Licence Application was lodged with the
Malawi Ministry of Natural Resources, Energy and Mining on 5 December 2014 and covers part of the areas by EPL0188
(expired).
The coordinates of EPL 0421/15 (that are likely to change based on the Mines and Minerals Act 2018 for exploration
tenement titles) are:
Point
A
B
C
D
E
F
G
H
Easting
Northing
507300
8603300
590500
8603300
590500
8595100
588500
8590000
588500
8581000
576900
8581000
576900
8599000
570300
8599000
The coordinates of the mining licence LML0216/21 are in ARC1950 grid reference:
Point
A
B
C
D
Easting
Northing
570269
8599321
576784
8599281
577172
8594317
570269
8594321
5
Criteria
JORC Code explanation
Exploration done
by other parties
Acknowledgment and appraisal of exploration by other parties.
The security of the tenure held at the time of reporting along with
any known impediments to obtaining a licence to operate in the
area.
Commentary
The exploration license is in good standing with the Department of Mines Lilongwe as at the date of this publication. The
Mining Licence has a mining lease term of 25 from 13 August 2021 under the Mines and Minerals Act (2018) gazetted on
1 September 2019 (and known or referred to as the Mines and Minerals Act (No8 of 2019).
From 1966 to 1967, the area was mapped at a scale of 1:250,000 by the Geological Survey of Malawi. Following mapping
no work was completed in the area until the UNDP conducted a major airborne radiometric and magnetic survey over
most of Malawi, at 1km line spacing, between 1984 and 1985. This survey led to the identification of a uranium and
uranium-thorium anomaly, measuring approximately 3km by 1km at Kanyika.
A field program to investigate the Kanyika airborne radiometric anomaly was conducted by the Malawi Geological Survey
in 1986. A total-count ground radiometric survey was completed over an area of 2 by 0.7km. Areas of high radiometric
response correlated to foliated nepheline syenite.
A total of 91 soil samples and 21 rock chip samples were taken and analysed for Nb, Zn and Pb. Chemical analyses returned
Zn and Pb results that were at or near background. Nb assays up to 1.20% in soils and 0.13% in rocks was detected,
although there was a poor correlation with anomalous radiometric zones.
The analytical suite did not include U, Zr, Ta or REEs due to limitations on available analytical equipment. Following
acquisition of the project by Globe Metals and Mining (Africa) Limited, reconnaissance field programs were initiated in
2006. A total-count ground radiometric survey defined two distinct, 020° striking parallel zones, over 2.5km strike length.
Soil and rock-chip sampling showed an associated +100ppm U3O8 soil anomaly (peak 482ppm U3O8) and coincident strong
Ta and Nb. Rock-chip samples up to 0.29% U3O8, 7.33% Nb2O5 and 0.63% Ta2O5 were returned.
Geology
Deposit type, geological setting and style of mineralisation.
Kanyika is an intrusion-hosted Pyrochlore-Zircon mineralized deposit. It lies within the Malawi Province of the
Mozambique Orogenic Belt. It is almost entirely underlain by Precambrian and Lower Palaeozoic Basement Complex,
predominantly gneiss metamorphic rocks.
Most of the rocks in the region are para-gneiss originating from variable protoliths including pelites, sandstones and
limestones. Several granitoid bodies of variable size have intruded the gneiss basement and may have originated wholly
or in part by anatexis. A few small concordant bodies of alkaline syenite rocks containing nepheline are also present,
including the strike-extensive body which hosts the Kanyika Pyrochlore-Zircon mineralization.
Airborne radiometric anomalies and follow-up geochemical sampling programs led to the discovery of the Kanyika
deposit. With good surface exposure and abundant drill data, the local geology at Kanyika is well known. The deposit is
hosted within a NNE striking, westerly dipping alkaline granitoid, which has broadly concordant contacts with enclosing
biotite gneiss. The host unit outcrops over 3.5 km strike length, and averages 200m wide at surface in the south and 50m
in the north.
Niobium and tantalum mineralization occur as the mineral pyrochlore. The pyrochlore mineralization occurs only within
the alkali granitoid, in disseminated form as well as in clustered aggregates forming centi