2
Kanyika Niobium Project
Ownership 100% | Malawi
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the
regional centre of Kasungu and secured by Mining Licence LML0216/21. Niobium is a listed
Critical Metal at the forefront of many new-age technologies including fast-charging batteries,
superconductors, nuclear SMRs, medical imaging, and particle accelerators. Niobium is also used
in the manufacture of everyday items such as optical glass applications, capacitors, and paint.
Globe Metals and Mining Limited (“Globe” or “Company”) aims to develop the world’s next niobium
oxide plant using feedstock from the Kanyika Malawi site. The World’s current supply of Niobium is highly
concentrated with only two major companies in South America and Canada. Globe’s addition of a new
source of supply, a third company and new geography, will greatly assist in alleviating the current
concentration and supply chain risks for the whole industry.
Globe made significant headway in progressing the Project during the quarter with the signing of nonbinding term sheets with TCM Research Limited (TCM) and good progress on the feasibility work,
inclusive of the positive metallurgical test work results with the extraction of both Niobium and Tantalum
above 99%, using the chlorination refining process.
Signing of Non-binding Term Sheets with TCM
As announced on 23 October 2023, the Company signed non-binding term sheets with TCM during the
quarter which detail the key commercial terms of an agreement for TCM to carry out metallurgical test
work at their South African laboratory, together with worldwide exclusivity and licencing arrangements
for the use of TCM’s proprietary technologies in connection with the processing of primarily niobiumbearing materials (where niobium is the primary concentrate constituent) (Technology).
The non-binding term sheets with TCM followed 12 months of negotiation and mutual due diligence
regarding:
•
TCM’s suite of Vapour Metallurgy (Chlorination) processing technologies for the treatment of a vast
range of materials for the recovery of metals, including Iron, Titanium, Vanadium, Tin, Tungsten,
Tantalum, Niobium and Rare Earth Elements; and
•
the Company’s substantial resource of niobium concentrate from the Project.
The Technology will enable the Company to produce high-grade oxides for use in a range of high value
products for a diverse and growing range of applications in industries such as aerospace, EVs, medicine,
superconductors and so forth.
A summary of the material terms of the non-binding term sheets are set out below.
Technology Licence Agreement
•
The licence agreement for the use of the Technology will continue for up to 20 years or until the
expiry of TCM’s licensed patents.
For the quarter ended 31 December 2023
3
•
During the term, the Company must pay TCM a 1% royalty on a quarterly basis in respect of all sales
that result from the use of the Technology (Royalty).
•
The Company shall pay an exclusivity fee of USD$15,000 per quarter (Exclusivity Fee) commencing
from 1 July 2024 and for every quarter thereafter until the Company commences paying the Royalty,
whereupon the obligation to pay the Exclusivity Fee shall cease and thereafter the Company will
continue to enjoy the worldwide exclusivity licence for a period of 5 years.
•
The Company may terminate the licence agreement by giving 12 months’ prior written notice. TCM
may only terminate the licence agreement if the Company fails to pay the Royalty.
Metallurgical test work agreement
The metallurgical test work to be carried out by TCM envisages the following stages:
•
Stage 1 – Lab-scale Pilot Plant. TCM to design, build and operate a laboratory-scale pilot plant to
demonstrate that the technology can extract economic metal and/or oxide powder from the
concentrate, and secondly to provide the product to potential off-takers;
•
Stage 2 – TCM (either alone or via a joint venture with the Resonant Group Pty Ltd) to undertake
feasibility study level process plant design and engineering utilising the test results;
•
Stage 3 – TCM (or the joint venture) to undertake engineering, procurement and construction of the
process plant, to be determined as an outcome of Stage 2;
•
Stage 4 – TCM (or the joint venture) to be involved in the commissioning and operation of the
Company’s refinery and undertake supporting analytical laboratory services, to be determined as an
outcome of stages 2 and 3; and
•
Stage 5 – TCM (or the joint venture) to provide ongoing technical and engineering support.
The change in refining technology from HF acid leach/solvent extraction process (as proposed in the
initial Feasibility Study) to the chlorination process has indicated important financial and environmental
positives. Globe initiated an Optimisation Study in late 2023 to evaluate the expected financial and ESGrelated advantages. The Optimisation Study will review the following key aspects of the project:
•
The phased development of the project (lowering the development risk of the project).
•
Optimisation of the concentrator design (crushing and milling as well as the floatation circuit).
•
Change in refining technology, from HF acid leach to the chlorination process – the subject of the
TCM test work set out above; and
•
Evaluating refinery location options including Namibia or Malawi.
The Optimisation Study, as well as the metallurgical test work and pilot scale test-work has delayed the
feasibility study update but anticipates the important positive effects of the study. Globe anticipates the
finalisation and announcement of the Optimisation Study findings in Q1 2024. The update of the
feasibility study will be undertaken post the conclusion of the Optimisation Study and metallurgical test
work.
For the quarter ended 31 December 2023
4
The TCM pilot plant will also be utilised to develop high-quality Niobium and Tantalum Oxide product,
which will be shipped to potential off-takers to facilitate the discussions and finalisation of key product
offtake agreements, which are important to the raising of capital for the project. To date Globe has had
positive discussions with potential off-takers globally.
TCM’s deliverables under the test work agreement will include metallurgical test work to confirm process
parameters and extraction efficiencies of the selected process, including generating enough of the
various feeds to determine purity and contaminants, and creation of intermediates and products for
quantification via independent (third party) chemical analysis, and generating the required process and
engineering data in support of the pilot plant design.
TCM will be paid a fee of A$430,000 for its services under the test work agreement.
Metallurgical Testwork Results
During the quarter, and as part of the TCM test-work, the Company received positive metallurgical
results on the concentrate material from the Project with the successful extraction rate of both Niobium
and Tantalum metal being above 99%.
As announced on 24 October 2023, the initial base-line test (OR1) showed 98% Niobium and 90%
Tantalum extraction. A series of kinetics and optimisation tests were then conducted which culminated in
tests (OR12 & OR13) showing above 99% extraction for both Niobium and Tantalum.
Table 1: Extraction results for Niobium, Tantalum, Titanium and Zirconium.
The tests further demonstrated high extraction yields for other potentially marketable products, namely
Titanium and Zirconium, with extraction yields of above 99% and 96% respectively.
With an extraction of 99.9% achieved on OR13, the expectation of the engineering team is that the
overall recovery across the refinery will be 99% comparing favourably to the Company’s August 2021
feasibility study of 95% based on the HF process.
The test results validate the decision to move from using a hydrofluoric acid and sulphuric acid-based
process with fluoride and sulphate rich wastes that need to be neutralised and disposed of to a
chlorination-based process with no such toxic waste and where chlorine is regenerated and recycled.
The Company expects that partners, off-takers, and future buyers will demand a sustainable Niobium
oxide supply and the chlorination process meets that requirement. The metallurgical testwork program
has now advanced to the next stage with separation and refining tests well underway.
For the quarter ended 31 December 2023
5
Niobium Market update
Niobium's unique combination of properties, including superconductivity, alloying capabilities,
and resistance to corrosion, makes it a vital element in a wide range of technological applications
across industries. Its contributions to fields such as electronics, energy, healthcare, and
transportation highlight its importance in advancing modern technology. Diversifying the supply
chain is essential to ensure a reliable and sustainable supply of niobium for current and future
technological advancements.
Key facts about the current Niobium market:
•
In 2020 Brazil accounted for ~91% of global primary niobium production.
•
Niobium ranked 2nd out of 50 critical minerals by the U.S. Department of the Interior in 2022.
•
Niobium was the only commodity for which both the United States and China are 100% net
import reliant.
•
Its increasing incorporation into modern and energy-efficient, low emission technologies has
raised concerns over the possibility of supply restrictions related to its restricted geographic
resource distribution.
Throughout the quarter, niobium continued to be highlighted in the news as the world begins to realise
the importance of this metal. Here are some articles on the way niobium is shaping technology:
Superconducting niobium waveguide achieves high-precision communications for B5G/6G networks – 2
October 2023
https://www.eurekalert.org/news-releases/1003643
Unlocking the Potential of Niobium C103 for the Space Industry – 30 November 2023
https://payloadspace.com/unlocking-the-potential-of-niobium-c103-a-game-changing-material-for-thespace-industry/
2023 International Conference on Niobium Based Batteries – 6 December 2023
https://niobium.tech/en/2023-international-niobium-battery-conference
Niobium producer CBMM says exports of niobium oxide up more than 500% since 2019 due to battery
demand – 10 December 2023
https://www.greencarcongress.com/2023/12/20231210-cbmm.html
US-Constructed Focusing Magnet for LHC Upgrade Lands at CERN – 20 December 2023
https://www.miragenews.com/us-constructed-focusing-magnet-for-lhc-upgrade-1147155/
Successful test paves the way for magnet production at CERN – 27 December 2023
https://phys.org/news/2023-12-successful-paves-magnet-production-cern.html
For the quarter ended 31 December 2023
6
Corporate
Annual General Meeting
During the quarter, the Company held its Annual General Meeting. At the meeting, the Company
received a ‘second strike’ with more than 25% of all votes cast against the adoption of the Company’s
2023 Remuneration Report. Notwithstanding the ‘second strike’, the related spill resolution was not
carried. All other resolutions were carried at the meeting. For further information, refer to ASX
announcement dated 29 November 2023: Results of Meeting.
Cash Position
At the end of the quarter, the Company was debt-free and held cash of $3.369 million (30 September
2023: $4.356 million).
Related Party Transactions
During the quarter Globe shareholders approved the issue of 34,455,972 shares at an issue price of
A$0.037 per share to Triple Talent Enterprises Ltd (Triple Talent), an entity associated with Director Bo
Tan. The issue of shares to Triple Talent formed part of the Company’s agreement to set-off its
outstanding loan facilities ($1,274,871) against Triple Talent’s commitment to subscribe for additional
shares under the Company’s pro rata non-renounceable entitlement offer announced on 4 August 2023.
Appointment of Chief Operating Officer
After quarter end, the Company announced the appointment of Mr Paul Smith as its Chief Operating
Officer.
Mr Smith has over 30 years’ experience as a senior mining industry executive across exploration,
feasibility, project development, and operations management on a global platform. He has extensive
experience with start-up and turnaround strategies, leveraging significant expertise in stockbroking,
corporate finance, and project funding in delivering key business objectives.
Appointment of Project Manager
On 20 November 2023, the Company announced the appointment of Mr Louis Schoeman as Project
Manager to assist with the development of the Kanyika Niobium Project in Malawi.
Prior to his appointment, Mr Schoeman spent over 6 years at Kumba Iron Ore, a division of Anglo
American, where he rose to the position of Senior Project Manager. In this role, he was part of the team
that completed the successful Kolomela Iron Ore Mine in the Northern Cape province of South Africa.
Launch of Investor Hub
During the quarter, the Company formally launched the Globe Metals & Mining Investor Hub, a dedicated
platform for investors to learn more about the Company and to keep up to date with the Company’s
activities.
For the quarter ended 31 December 2023
7
ASX Additional Information
ASX Listing Rule 5.3.1: There were no substantive mining exploration activities during the quarter. Work
was confined to evaluation. The Company expended approximately $32,000 on evaluation activities
(refer section 2.1(d) of Appendix 5B).
ASX Listing Rule 5.3.2: There were no substantive mining production and development activities during
the quarter.
ASX Listing Rule 5.3.5: A total of $81,000 was paid to related parties during the quarter comprising NonExecutive Directors’ fees (including superannuation).
Shareholding Information
At 31 December 2023, shares on issue totalled: 675,867,588. The number and distribution of holders at
31 December 2023 was:
Holding Ranges
above 0 up to and including 1,000
above 1,000 up to and including 5,000
above 5,000 up to and including 10,000
above 10,000 up to and including 100,000
above 100,000
Totals
Holders
64
40
64
320
162
650
Holding
% IC
1,826
131,377
514,061
13,878,279
661,342,045
675,867,588
0.00%
0.02%
0.08%
2.05%
97.85%
100.00%
Top 20 Holders at 31 December 2023
Position
Holder Name
1
2
APOLLO METALS INVESTMENT COMPANY LIMITED
AO-ZHONG INTERNATIONAL MINERALRE SOURCES
PTY LTD
TRIPLE TALENT ENTERPRISES LTD
BNP PARIBAS NOMINEES PTY LTD ACF
CLEARSTREAM
MR COLIN ROBERT SEARL &
MRS CYNDA SEARL
CITICORP NOMINEES PTY LIMITED
M & K KORKIDAS PTY LTD
<M & K KORKIDAS PTY LTD A/C>
BNP PARIBAS NOMS PTY LTD
MR RICHARD ULRICK &
MRS WENDY ULRICK
<ULRICK SUPER FUND A/C>
GOENG INVESTMENTS PTY LTD
<GOENG PENSION FUND A/C>
C & CR SUPERCO PTY LTD
<C & CR SEARL SUPERFUND A/C>
HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED A/C 2
BENRET PTY LTD
<COLIN SEARL FAMILY A/C>
GOTHA STREET CAPITAL PTY LTD
<BLUE SKY NO 2 A/C>
3
4
5
6
7
8
9
10
11
12
13
14
Holding
% IC
351,405,158
118,143,062
51.99%
17.48%
69,428,662
14,278,089
10.27%
2.11%
12,114,888
1.79%
8,271,635
6,161,371
1.22%
0.91%
5,002,248
3,934,439
0.74%
0.58%
3,858,697
0.57%
3,753,888
0.56%
3,459,844
0.51%
3,088,888
0.46%
2,871,810
0.42%
For the quarter ended 31 December 2023
15
16
17
18
19
20
8
MR NOEL MALCOLM SCAMMELL
MR KELLY PETER BODMAN
MR DRITAN MEHMETI
MR MARK LEONARD SWANSON
MR ALI SUSANTO &
MRS SIMPATIHATY TANDADJAJA
MR BAHRAM REZAEI
Total
Total issued capital - selected security class(es)
2,806,000
2,520,562
2,000,000
1,725,000
1,700,807
0.42%
0.37%
0.30%
0.26%
0.25%
1,600,000
618,125,048
675,867,588
0.24%
91.46%
100.00%
Schedule of Mineral Tenements at 31 December 2023
Country
Project Type
Status
Tenement
Malawi
Kanyika
Granted
LML0216/21*
Mining Licence
Interest held by Globe
31 Dec 2023
30 Sep 2023
100%
100%
There were no tenements acquired or disposed during the quarter.
* Pursuant to the Mines and Minerals Act, the Malawi Government is entitled to a 10% free equity interest
in LML0216/21 subject to formally notifying GMMA of its desire to take up its entitlement. As at the date
of this report, neither the Company nor GMMA has received any such notice.
Authorisation for Release
This report was authorised for release by the Board of Directors.
For further information, please contact:
Grant Hudson
Chief Executive Officer
+61 8 6118 7240
gh@globemm.com
For the quarter ended 31 December 2023
9
Qualifying Statements
Mineral Resources Estimates
The information in this report that relates to Mineral Resources is extracted from the report titled “Kanyika Niobium Project –
Updated JORC Resource Estimate” released to the Australian Securities Exchange (ASX) on 11 July 2018 and available to view
at www.globemm.com and for which Competent Persons’ consents were obtained. Each Competent Person’s consent remains
in place for subsequent releases by the Company of the same information in the same form and context, until the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the information included in the
original ASX announcement released on 11 July 2018 and, in the case of estimates of Mineral Resources, that all material
assumptions and technical parameters underpinning the estimates in the original ASX announcement continue to apply and
have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are
presented have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 titled “Kanyika Niobium Project – Updated JORC
Resource Estimate” available to view at www.globemm.com.
The information in this report that relates to Ore Reserves is extracted from the report titled “Kanyika Niobium Project – Project
Feasibility and Economics” released to ASX on 19 August 2021 and available to view at www.globemm.com and for which
Competent Persons’ consents were obtained. Each Competent Person’s consent remains in place for subsequent releases by
the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent
report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the information included in the
original ASX announcement released on 19 August 2021 and, in the case of estimates of Ore Reserves, that all material
assumptions and technical parameters underpinning the estimates in the original ASX announcement continue to apply and
have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are
presented have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 19 August 2021 titled “Kanyika Niobium Project – Project
Feasibility and Economics” available to view at www.globemm.com.
Disclaimer
This report has been prepared by Globe Metals & Mining Limited (Company). The material contained in this report is for
information purposes only. This release is not an offer or invitation for subscription or purchase of, or a recommendation in
relation to, securities in the Company and neither this release nor anything contained in it shall form the basis of any contract or
commitment.
This report may contain forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning the Company’s business plans, intentions, opportunities, expectations, capabilities, and other statements that are not
historical facts. Forward-looking statements include those containing such words as could-plan-target-estimate-forecastanticipate-indicate-expect-intend-may-potential-should or similar expressions. Such forward-looking statements are not
guarantees of future performance and involve known and unknown risks, uncertainties, assumptions, and other important
factors, many of which are beyond the control of the Company, and which could cause actual results to differ from those
expressed in this report. Because actual results might differ materially to the information in this report, the Company does not
make, and this report should not be relied upon as, any representation or warranty as to the accuracy, or reasonableness, of the
underlying assumptions and uncertainties. Investors are cautioned to view all forward-looking statements with caution and to not
place undue reliance on such statements.
The report has been prepared by the Company based on information available to it, including information from third parties, and
has not been independently verified. No representation or warranty, express or implied, is made to the fairness, accuracy or
completeness of the information or opinions contained in this report.
The Company estimates its reserves and resources in accordance with the Australasian Code for Reporting of Identified Mineral
resources and Ore Reserves 2012 Edition (JORC Code), which governs such disclosures by companies listed on ASX.
For the quarter ended 31 December 2023
10
Appendix A: About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the regional centre of
Kasungu and is secured by Large-Scale Mining Licence No. LML0216/21 which grants the Company security of
tenure and the right to mine niobium, tantalum, and deleterious uranium.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have defined the extent of mineralisation.
Structured and progressive engineering studies have resulted in the current (JORC 2012) Mineral Resource
Estimate (refer below) and given rise to significant improvements and simplifications in the process flowsheet, from
that first imagined.
In addition, Globe has undertaken substantial metallurgical optimisation work and commissioned a pilot plant to
demonstrate and further optimise metallurgical processes. Metallurgical optimisations studies have improved
recoveries from 62% in 2012 to 75% today, through simple novel patented metallurgical processes
The Kanyika operations will produce a pyrochlore mineral concentrate that contains both niobium and tantalum in
commercially valuable volumes to be shipped to a refinery for advanced processing into high purity materials.
A Mineral Resource Estimate for the Kanyika Niobium Project under the 2012 JORC guidelines was reported to
ASX on 11 July 2018 as follows:
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Globe Metals & Mining Limited
ABN
Quarter ended (“current quarter”)
33 114 400 609
31 December 2023
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(6 months)
$A’000
(501)
(925)
(543)
(912)
-
-
-
-
(1,044)
(1,837)
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(32)
(32)
(e) investments
-
-
(f)
-
-
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (provide details if material)
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(d) exploration & evaluation
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Current quarter
$A’000
Year to date
(6 months)
$A’000
(a) entities
-
-
(b) tenements
-
-
(c) property, plant and equipment
-
-
(d) investments
-
-
(e) other non-current assets
-
-
2.3
Cash flows from loans to other entities
-
-
2.4
Dividends received (see note 3)
-
-
2.5
Other (provide details if material)
-
-
2.6
Net cash from / (used in) investing
activities
(32)
(32)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
125
4,973
3.2
Proceeds from issue of convertible debt
securities
-
-
3.3
Proceeds from exercise of options
-
-
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
(36)
(380)
3.5
Proceeds from borrowings
-
400
3.6
Repayment of borrowings
-
-
3.7
Transaction costs related to loans and
borrowings
-
-
3.8
Dividends paid
-
-
3.9
Other (provide details if material)
-
-
3.10
Net cash from / (used in) financing
activities
89
4,993
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4,356
245
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(1,044)
(1,837)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(32)
(32)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
89
4,993
Consolidated statement of cash flows
2.2
Proceeds from the disposal of:
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(6 months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
-
-
4.6
Cash and cash equivalents at end of
period
3,369
3,369
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
3,369
4,356
3,369
4,356
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
6.
Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
81
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
The payments made to directors of the entity and their associates reported at 6.1 were comprised as
follows:
A$’000
Non-executive directors’ fees
81
TOTAL
81
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
-
-
-
-
7.1
Loan facilities
7.2
Credit standby arrangements
7.3
Other (please specify)
7.4
Total financing facilities
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
-
8.
Estimated cash available for future operating activities
$A’000
8.1
Net cash from / (used in) operating activities (item 1.9)
(1,044)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(32)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(1,076)
8.4
Cash and cash equivalents at quarter end (item 4.6)
3,369
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
3,369
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
3.1
-
-
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A.
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Compliance statement
1
This statement has been prepared in acc
Share your feedback
Discover