Variation of loan facilities with Director Bo Tan
Released
Released
Announcement PDF
Globe Metals & Mining Limited
ABN 33 114 400 609
45 Ventnor Avenue
West Perth WA 6005
ASX: GBE
+61 8 6118 7240
info@globemm.com
globemm.com
ASX Announcement
30 April 2025
Variation of loan facilities with Director Bo Tan
Globe Metals & Mining Limited (ASX: GBE) (“Globe” or “Company”) refers to the
announcement made on 30 January 2025 and is pleased to advise that it has reached an
agreement with Director Bo Tan to increase the facility limit of his US$1.2 million loan facility,
by a further US$200,000, to US$1.4 million. The additional US$200,000 is available for
drawdown on 1 June 2025. All other terms of the loan facility remain unchanged.
Globe also refers to the announcement made on 26 September 2024 and wishes to advise
that it has reached an agreement with Director Bo Tan to extend the due date for repayment
of his A$2.3 million loan facility by 3 months to 25 August 2025. All other terms of the loan
facility remain unchanged.
The Board of Directors of the Company wish to again acknowledge the continued strong
support shown by Mr Tan and is appreciative of his ongoing commitment to the Company.
Authorisation for release
This announcement has been authorised for release by the Company’s Chief Executive
Officer, Paul Smith.
For further information, please contact:
Globe Metals & Mining Limited
Paul Smith
Chief Executive Officer
P: +61 8 6118 7240
E: paul.smith@globemm.com
About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the regional
centre of Kasangu and is secured by Large-Scale Mining Licence No. LML0216/21 which grants the
Company security of tenure and the right to mine niobium, tantalum, zirconium and other minor metals.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have de�ined the extent of
mineralisation. Structured and progressive engineering studies have resulted in the current (JORC 2012)
Mineral Resource Estimate (refer below) and given rise to signi�icant improvements and simpli�ications
in the process �lowsheet.
1
The Kanyika Project will be developed in two phases, substantially de-risking the project. The project will
be fully integrated on the mine site – Mining, Concentration and Re�ining, to produce high-purity, highvalue Niobium and Tantalum oxides for direct export to western markets.
A Mineral Resource Estimate for the Kanyika Niobium Project under the 2012 JORC guidelines was
reported to ASX on 11 July 2018 as follows:
Table 1: MRE for KNP using a 1,500 ppm Nb2 O5 lower cut
Table 2: MRE for KNP using a 3,000 ppm Nb2 O5 lower cut
Category
Resource
(Mt)
Nb2 O5 (ppm)
Ta2 O5 (ppm)
Category
Resource
(Mt)
Nb2 O5 (ppm)
Ta2 O5 (ppm)
Measured
5.3
3,790
180
Measured
3.4
4,790
220
160
Indicated
47
2,860
135
Indicated
16.6
4,120
Inferred
16
2,430
120
Inferred
2.8
4,110
190
TOTAL
68.3
2,830
135
TOTAL
22.8
4,220
190
Mineral Resource Estimates
The information in this report that relates to Mineral Resources is extracted from the report titled “Kanyika Niobium
Project – Updated JORC Resource Estimate” released to the Australian Securities Exchange (ASX) on 11 July 2018 and
available to view at www.globemm.com and for which Competent Persons’ consents were obtained. Each Competent
Person’s consent remains in place for subsequent releases by the Company of the same information in the same form
and context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.
The Company con�irms that is not aware of any new information or data that materially affects the information
included in the original ASX announcement released on 11 July 2018 and, in the case of estimates of Mineral
Resources, that all material assumptions and technical parameters underpinning the estimates in the original ASX
announcement continue to apply and have not materially changed. The Company con�irms that the form and context
in which the Competent Persons’ �indings are presented have not been materially modi�ied from the original ASX
announcement.
Full details are contained in the ASX announcement released on 11 July 2028 titled “Kanyika Niobium Project –
Updated JORC Resource Estimate” avaialble to view at www.globemm.com.
2
Share your feedback
Discover