28 June 2023
Globe secures further funding with additional $200,000 loan
from Director Bo Tan
Globe Metals & Mining Limited (ASX: GBE) (“Globe” or “Company”) is pleased to advise that Director
Bo Tan has agreed to provide an additional loan advance of A$200,000 on an unsecured basis to assist
the Company with its short-term working capital requirements.
As announced on 27 September 2022, Mr Tan provided an unsecured short-term loan facility in the
amount of A$500,000, repayable in cash or by the issue of fully paid ordinary shares in the Company at
a price of 6.35 cents per share (September Loan).
On 19 April 2023, the Company announced that it had reached an agreement with Mr Tan to reduce the
facility limit under the September Loan to A$400,000 (previously A$500,000) and extend the repayment
date to 18 October 2023. The September Loan is fully drawn at A$400,000.
As announced on 26 April 2023, Mr Tan provided an additional unsecured short-term loan facility of up
to $600,000, repayable in cash or by the issue of fully paid ordinary shares in the Company at a price
equal to the lesser of a 15% discount to the 5-day VWAP immediately prior to the issue date or the
issue price per share of the next debt or equity financing undertaken by the Company after the first
drawdown date (April Loan). The April Loan is fully drawn at A$600,000 and due for repayment on 4
November 2023.
Funds from the new loan advance from Mr Tan will be used for general working capital. The key terms of
the new loan are as follows:
Loan Amount:
Interest Rate:
Default Interest Rate:
Maturity Date:
Repayment Terms:
A$200,000
8.3% per annum
20% per annum
4 November 2023
At the lender’s election – repayable in cash or, subject to shareholder approval,
by the issue of fully paid ordinary shares at the lesser of:
• a 15% discount to the 5-day VWAP immediately prior to the issue date; or
• the issue price per share of the next debt or equity financing undertaken by
the Company after the drawdown date.
The new loan brings the total amount of all outstanding loan facilities provided to the Company by Mr
Tan to A$1.2 million. The Board wishes to acknowledge the continued strong support shown by Mr Tan
and is appreciative of his ongoing commitment to the Company.
Authorisation for Release
This ASX Announcement has been authorised for release by the Company’s Chief Executive Officer,
Grant Hudson.
For further information, please contact:
Grant Hudson
Chief Executive Officer
+61 8 6118 7240
gh@globemm.com
Fiona Bryce
Media and Investor Relations
+61 400 029 258
fiona@republicpr.com.au
About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the regional centre of
Kasangu and is secured by Large-Scale Mining Licence No. LML0216/21 which grants the Company security of
tenure and the right to mine niobium, tantalum, and deleterious uranium.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have defined the extent of
mineralisa�on. Structured and progressive engineering studies have resulted in the current (JORC 2012) Mineral
Resource Es�mate (refer below) and given rise to significant improvements and simplifica�ons in the process
flowsheet, from that first imagined.
In addi�on, Globe has undertaken substan�al metallurgical op�misa�on work and commissioned a pilot plant to
demonstrate and further op�mise metallurgical processes. Metallurgical op�misa�ons studies have improved
recoveries from 62% in 2012 to 75% today, through simple novel patented metallurgical processes.
The Kanyika opera�ons will produce a pyrochlore mineral concentrate that contains both niobium and tantalum in
commercially valuable volumes to be shipped to a refinery for advanced processing into high purity materials.
2
A Mineral Resource Es�mate for the Kanyika Niobium Project under the 2012 JORC guidelines was reported to
ASX on 11 July 2018 as follows:
Table 1: MRE for KNP using a 1,500 ppm Nb2 O5 lower cut
Category
Resource
(Mt)
Measured
5.3
Indicated
47
Inferred
16
TOTAL
68.3
Nb2 O5 (ppm)
Table 2: MRE for KNP using a 3,000 ppm Nb2 O5 lower cut
Resource
(Mt)
Nb2 O5 (ppm)
Ta2 O5 (ppm)
Category
3,790
180
Measured
3.4
4,790
220
2,860
135
Indicated
16.6
4,120
160
2,430
120
Inferred
2.8
4,110
190
2,830
135
TOTAL
22.8
4,220
190
Ta2 O5 (ppm)
Mineral Resource Es�mates
The informa�on in this report that relates to Mineral Resources is extracted from the report �tled “Kanyika Niobium Project –
Updated JORC Resource Es�mate” released to the Australian Securi�es Exchange (ASX) on 11 July 2018 and available to view
at www.globemm.com and for which Competent Persons’ consents were obtained. Each Competent Person’s consent remains
in place for subsequent releases by the Company of the same informa�on in the same form and context, un�l the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new informa�on or data that materially affects the informa�on included in the
original ASX announcement released on 11 July 2018 and, in the case of es�mates of Mineral Resources, that all material
assump�ons and technical parameters underpinning the es�mates in the original ASX announcement con�nue to apply and
have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are
presented have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 �tled “Kanyika Niobium Project – Updated JORC
Resource Es�mate” available to view at www.globemm.com.
3
Share your feedback
Discover