Further metallurgical results on chlorination test work
Highlights
•
Niobium/Tantalum successfully extracted and separated using environmentally sustainable
chlorina�on refining.
•
Confirma�on that Niobium/Tantalum products contain no radia�on as the radioac�ve materials
are removed in the refining process.
•
Successful extrac�on and separa�on of >94% of the key Rare Earth Elements (REE), as byproducts of the niobium and tantalum refining process.
•
Construc�on of Refinery Pilot Plant commenced for the produc�on of marke�ng samples for
the finalisa�on of key off-take agreements.
Globe Metals & Mining Limited (ASX: GBE) (“Globe” or “Company”) is pleased to announce the second
part of the metallurgical results on the chlorina�on test work.
As part of Globe’s metallurgical test work on the use of chlorina�on as a refining process for the
recovery of Niobium, Tantalum, and other key metals from the Kanyika concentrate, Globe is
con�nuing to conduct test work on concentrate produced in 2014. The first part of the metallurgical
results on the extrac�on results of >99% for Niobium and Tantalum was announced on 27 October
2023. 1
The metallurgical test work is focused on two key steps – firstly, the extrac�on of metals from the
Kanyika concentrate; and secondly, the separa�on of the metals (as chlorides) and subsequent
purifica�on and oxida�on of the metals to high-purity saleable products.
Extrac�on Test Work
As announced on 27 October 2023 (results repeated below), Globe has conducted a baseline test
followed by a series of kine�cs and op�misa�on tests. This culminated in tests (OR12 & OR13) showing
above 99% extrac�on for both Niobium and Tantalum. The tests further demonstrate high extrac�on
yields for other poten�ally marketable products, namely Titanium and Zirconium, with extrac�on yields
of above 99% and 96% respec�vely.
1 Refer to ASX Announcement titled ‘Positive metallurgical test work results – correction’ made on 27 October
2023
Test
OR1
OR12
OR13
Nb2O5
98,1%
99,9%
99,9%
Extrac�on %
Ta2O5
89,7%
99,8%
99,8%
TiO2
99,4%
99,9%
99,9%
ZrO2
53,2%
92,7%
95,9%
Frac�onal Cooling Separa�on
A�er the extrac�on of metals in the chlorina�on process, the metal chlorides leave the reactor as
gases. The gases are systema�cally cooled down through controlled cooling causing elements to
condense when they reach their respec�ve boiling points. Ini�ally uranium and thorium chlorides are
condensed removing them from the gas stream. Subsequently iron and zirconium chlorides are
condensed to a major extent. At a target condensa�on temperature of 250oC, a mixture of niobium,
tantalum containing zircon and iron is condensed. Control over the target temperature is key to
obtaining a high niobium chloride concentra�on in the condensate.
In the table below, the predicted analysis of condensate at three temperatures is given. The two actual
results show that the actual condensa�on temperature achieved was between 265oC and 270oC rather
than the target 250oC. Given the very small laboratory apparatus, accurate temperature control is
difficult. The resul�ng separa�on of niobium chloride was demonstrated to be very good with a chloride
purity over 84%. If the 250oC had been achieved, this would have been >90%.
KR01
Analyzed #1
Analyzed #2
Calculated 250oC
Calculated 266oC
Calculated 270oC
NbCl5
86,0%
84,2%
90,2%
84,9%
83,1%
TaCl5
3,5%
4,7%
3,4%
3,2%
3,1%
FeCl3
2,4%
5,3%
1,6%
3,8%
4,6%
ZrCl4
8,1%
9,1%
3,7%
8,1%
8,2%
Purifica�on and Oxida�on
The next step is to take the crude mixture of niobium and tantalum and purify it with dis�lla�on. The
purified niobium chloride is expected to reach >99.9% during dis�lla�on. The very pure niobium
chloride is then oxidised to produce a final niobium pentoxide product of >99.9% Nb2O5. Globe and
TCM Research are currently working on this next phase of test work.
No Radioac�vity in Intermediate Niobium/Tantalum Mixtures
The test work confirmed that “no radioac�ve contamina�on was found in the niobium pentachloride
desublima�on frac�on”. While this was expected, it has now been confirmed that the final niobium and
tantalum products will not contain any radia�on. All uranium and thorium were precipitated before the
condensa�on of the niobium/tantalum mixture.
Rare Earth Extrac�on
While Rare Earths make up a minor frac�on of the concentrate, they are s�ll present and an important
economic by-product for Globe.
2
During the chlorina�on process, the Rare Earths form chlorides in the form RECl3. These chlorides
remain in the reactor residue. Rare Earth chlorides are water soluble. They will be washed out of the
residue and concentrated by frac�onal precipita�on of impuri�es before being precipitated as a Rare
Earth carbonate and sold as an important by-product.
The results below are for a par�cular sample of residue that was washed and analysed for extrac�on.
Under the opera�ng condi�ons, all the Rare Earths had a >94% extrac�on.
GMM-32
Feed Material
Feed Material
Washed Residue
Washed Residue
Extraction Solution
Extraction Solution
Extraction Yield
Units
mg/kg
mg
mg/kg
mg
mg/l
mg
%
Ce
3608,0
288,6
322,2
3,8
504,3
28,8
94,8
La
1266,7
101,3
104,9
1,8
167,3
9,6
95,2
Nd
1310,3
104,8
96,9
1,3
153,0
8,7
95,7
Pr
322,5
25,8
27,2
0,4
42,0
2,4
95,1
Upcoming Test Work
Marketing Samples
Based on these very encouraging results, Globe has already embarked on the produc�on of small-scale
(gram scale) marke�ng samples during March 2024. The mixed niobium/tantalum chloride mixtures will
be generated using the equipment used for the TCM laboratory tests described above. These mixtures
will then be purified with a target of producing Standard Grade (>99.9% Nb2O5) samples to be
distributed for marke�ng purposes.
Pilot Plant Refinery
The larger pilot plant refinery which is currently under construc�on at Resonant Group (Johannesburg,
South Africa) is expected to be commissioned and opera�onal in April 2024. The pilot plant will be
processing concentrate at a scale exceeding 10x that of the laboratory apparatus men�oned in this
announcement. The aim of the pilot plant will be to produce very high purity 99.98% (op�cal grade)
(kilogram scale) Niobium Pentoxide, which will be provided to Globe’s key off-takers to assess. Once the
oxide product is produced, Globe will be very well posi�oned to finalise its discussions with key industry
off-takers, a major step forward in the development of Globe’s Kanyika Project. The oxide market
includes all oxide grades from Standard Grade up to op�cal grades of 99.98% niobium pentoxide, thus
facilita�ng prices over US$50/kg.
3
Image: Distillation column for Globe’s Pilot Plant under construction at Resonant Group’s facility in
Johannesburg, South Africa.
4
Grant Hudson, Globe’s CEO commented:
“We are very pleased with the progress made in the metallurgical test work conducted so far. The
successful floatation concentration of Kanyika ore, as announced recently, and the refinement of the
concentrate through the environmentally conscious chlorination process, hold immense promise for
Globe. Both the extraction and separation of all key metals have now been demonstrated as technically
feasible, further bolstering our confidence in the process. We are very excited about the upcoming
commissioning of the refinery pilot plant, and the production of high-purity marketing samples of
niobium pentoxide, tantalum pentoxide, and rare earth element by-product for key industry off-take
partners. This marks a major step forward in the development of our Kanyika project.”
Project, ESG and Market Overview
Kanyika has the poten�al to become the first new globally significant niobium mine in 50 years, with an
average nameplate produc�on of 3,267 tonnes per annum (tpa) of niobium pentoxide, (Nb2O 5) and
136 tpa of tantalum pentoxide (Ta 2O 5) over the 27-year life of opera�ons. The Nb2O 5 and Ta2O 5
products will be high-specifica�on high-purity products with grades exceeding 99.5% and 99%
respec�vely.
Standard Niobium oxide is being used in the anodes of fast charging bateries (charging to 100% in less
than 10 minutes). These bateries have applica�on in large vehicles that cannot afford excessive
charging �me. These include haul trucks, trains, front-end loaders, underground mining machinery, etc.
They are also being used in bateries for handheld tools where fast charging is an advantage.
High purity Niobium is an integral component of daily-use, energy-related, and specialty technologies
such as superalloys (for example, for aircra� engines, rocket assemblies, etc), and superconduc�ng
magnets (for example, for medical imaging devices, and nuclear power genera�on).
The Kanyika Project aims to be a pioneering and environmentally sustainable niobium venture,
priori�sing both innova�on and adherence to ESG principals. It has been shown to be a botom quar�le
cost project and is designed to ensure the produc�on of “green niobium” in that its Scope 1 and Scope
2 carbon emissions will be of the lowest in the world, with hydroelectric and solar power domina�ng its
power sources for both the mine site and the refinery. The very low carbon footprint is also supported
by a unique closed-cycle chlorina�on refining process, which is transforma�ve for the industry.
Authorisation for Release
This announcement has been authorised for release by the Company’s Chief Executive Officer, Grant
Hudson.
For further information, please contact:
Grant Hudson
Chief Executive Officer
+61 8 6118 7240
gh@globemm.com
Paul Smith
Chief Executive Officer Designate
+61 8 6118 7240
paul.smith@globemm.com
5
About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the regional centre of
Kasangu and is secured by Large-Scale Mining Licence No. LML0216/21 which grants the Company security of
tenure and the right to mine niobium, tantalum, and deleterious uranium.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have defined the extent of
mineralisa�on. Structured and progressive engineering studies have resulted in the current (JORC 2012) Mineral
Resource Es�mate (refer below) and given rise to significant improvements and simplifica�ons in the process
flowsheet.
In addi�on, Globe has undertaken substan�al metallurgical op�misa�on work and commissioned the pilot plant
design to demonstrate and further op�mise metallurgical processes. Metallurgical op�misa�ons studies have
improved recoveries from 62% in 2012 to 75% presently, through novel patented metallurgical processes.
The Kanyika opera�ons will produce a pyrochlore mineral concentrate that contains both niobium and tantalum in
commercially valuable volumes to be shipped to a refinery for advanced processing into high purity materials.
A Mineral Resource Es�mate for the Kanyika Niobium Project under the 2012 JORC guidelines was reported to
ASX on 11 July 2018 as follows:
Table 1: MRE for KNP using a 1,500 ppm Nb2 O5 lower cut
Category
Resource
(Mt)
Measured
5.3
Indicated
47
Nb2 O5 (ppm)
Table 2: MRE for KNP using a 3,000 ppm Nb2 O5 lower cut
Resource
(Mt)
Ta2 O5 (ppm)
Category
Nb2 O5 (ppm)
Ta2 O5 (ppm)
3,790
180
Measured
3.4
4,790
220
2,860
135
Indicated
16.6
4,120
160
Inferred
16
2,430
120
Inferred
2.8
4,110
190
TOTAL
68.3
2,830
135
TOTAL
22.8
4,220
190
6
Mineral Resource Es�mates
The informa�on in this report that relates to Mineral Resources is extracted from the report �tled “Kanyika Niobium Project –
Updated JORC Resource Es�mate” released to the Australian Securi�es Exchange (ASX) on 11 July 2018 and available to view
at www.globemm.com and for which Competent Persons’ consents were obtained. Each Competent Person’s consent remains
in place for subsequent releases by the Company of the same informa�on in the same form and context, un�l the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms it is not aware of any new informa�on or data that materially affects the informa�on included in the
original ASX announcement released on 11 July 2018 and, in the case of es�mates of Mineral Resources, that all material
assump�ons and technical parameters underpinning the es�mates in the original ASX announcement con�nue to apply and
have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are
presented have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 �tled ‘Kanyika Niobium Project – Updated JORC
Resource Es�mate’ available to view at www.globemm.com.