ASX Announcement
29 November 2023
AGM Presentation
The 2023 Annual General Meeting (AGM) of Globe Metals & Mining Limited (ASX: GBE) (“Globe” or
“Company”) will be held today at 2:00pm (WST).
In accordance with ASX Listing Rule 3.13.3, a copy of the CEO’s presentation that will be delivered at the
AGM is attached.
This announcement was authorised for release by the CEO of Globe.
-endsFor further information, please contact:
Grant Hudson
Chief Executive Officer
gh@globemm.com
Paul Hardie
Company Secretary
phardie@globemm.com
Annual General
Meeting
From Exploration to Production: Unveiling a
new, vertically-integrated Niobium producer.
29 November 2023
Grant Hudson
Chief Executive Officer
ASX: GBE | globemm.com
Charles Altshuler
Chief Financial Officer
Disclaimer
This Presentation has been prepared by Globe Metals & Mining Limited ABN 33 114 400 609
(Globe or the Company).
The information in this Presentation is an overview and does not contain all information necessary for
making investment decisions. In making investment decisions, investors should rely on their own
examination of the Company and the Kanyika Niobium Project and consult their own legal, technical,
business and/or financial advisers. The information contained in this Presentation has been prepared in
good faith by Globe, however no representation or warranty expressed or implied is made as to the
accuracy, correctness, completeness or adequacy of any statements, estimates, options, or other
information contained in this presentation. To the maximum extent permitted by law, Globe, its
Directors, officers, employees and agents disclaim liability for any loss or damage which may be
suffered by any person relying on anything contained in or omitted from this Presentation.
This Presentation contains certain forward-looking statements and comments about future matters.
Forward-looking statements can generally be identified using forward-looking words such as, “expect”,
“anticipate”, “likely”, “intend”, “should”, “could”, “may”, “predict”, “plan”, “propose”, “will”, “believe”,
“forecast”, “estimate”, “target” “outlook”, “continue”, “guidance” and other similar expressions. The
forward-looking statements including statements regarding our intent, belief or current expectations with
respect to Kanyika Niobium Project’s performance, market, political, social and environmental
conditions, additional feasibility work, improvements and updates, project configuration, construction
and commissioning costs and timelines, and general risks and uncertainties. Readers are cautioned not
to place reliance on these forward-looking statements. While due care has been used in the preparation
of forecast information, actual results may vary in a materially positive or negative manner.
Certain information in this Presentation may refer to the intentions of Globe with respect to the Kanyika
Niobium Project, but these are not intended to be forecasts, forward looking statements or statements
about the future matters for the purposes of the Corporations Act or any other applicable law. The
occurrence of the events in the future are subject to risk, uncertainties and other actions that may cause
Kanyika Niobium Project’s actual results, performance or achievements to be materially different from
the results, performance or achievements implied by the forward-looking statements.
Any such statements, targets, opinions and estimates in this Presentation speak only as of the date
hereof and are based on assumptions and contingencies subject to significant uncertainties or change
without notice. Forecasts and hypothetical examples are subject to uncertainty and contingencies often
outside Globe’s control. The information in this presentation is current as at the date of the publication of
this presentation.
Such factors include, but are not limited to, general economic, market and business conditions, market
prices for niobium and tantalum, demand for niobium and tantalum, niobium and tantalum supply,
obtaining additional debt and equity funding (as required), concluding of off-take agreements, obtaining
of all necessary permits for development and production as and when required, estimation of resources
and reserves, development and production costs, processing recoveries transportation delays and
costs, risks and uncertainties related to construction and commissioning, delays in construction of the
mining and processing operations, accidents, equipment breakdowns, title matters, labour disputes,
environmental issues and local community issues involving relocation of project affected people or other
unanticipated difficulties with, or interruptions in, development or production, exchange rate fluctuations,
and risks and uncertainties associated with doing business in Africa. In addition, there may be
information herein that is information about prospective results of operations, financial position or cash
flows and which is provided only to assist in an evaluation of the Kanyika Niobium Project outlined herein
but are not to be relied upon as accurate representations of future results and may not be appropriate
for any other purpose.
Unveiling a new, vertically-integrated Niobium producer.
There can be no assurance that actual outcomes will not differ materially from these forward-looking
statements. Except as required by law or regulation (including the ASX Listing Rules), Globe undertakes
no obligation to supplement, revise or update forward-looking statements in the future, regardless of
whether new information, future events or results or other factors affect the information contained in this
Presentation.
ASX GBE |
2
Strategic Positioning and Investment Highlights
Goal is to be only the 2nd vertically integrated Niobium oxide producer
Oxide market growing as purchasers look to diversify supply-side risk
Low-cost mining and refining operations are in conflict-free zones
Globe has worldwide exclusivity (5 years) on ESG-friendly refining process
Niobium is number 3 on the US critical mineral list
De-risked small scale start up with expansion to follow
Attractive valuation with 50% IRR and $1bn US NPV per 2021 DFS
Shovel-ready, fully permitted, advanced staged project
Unveiling a new, vertically-integrated Niobium producer.
ASX GBE |
3
Kanyika – a solution for supply-side risk
Excessive dependence on single supplier countries makes Europe vulnerable
Action Plan on Critical Raw Materials: European Commission Report 03.09.2020
Unveiling a new, vertically-integrated Niobium producer.
ASX GBE |
4
Phase One
Low-cost start-up operations
Malawi Kanyika mine site: Phase One Pilot
>
>
>
>
>
>
Open pit mining
Crushing
Milling
Flotation
Drying
Concentrate
Sale and trucking
“Free dig” mining
Primary jaw and
secondary cone
EDS mill
Single stage:
Rougher, scavenger and
cleaners
Locally produced
biomass as fuel
Contains radioactive nuclides
Bulk bags loaded
onto flat bed trucks
Load and haul
Ball mill
Namibia refinery: Phase One Pilot
>
Salt (NaCl):
Electrolysis of salt to
produce chlorine
+
Concentrate and
chlorine gas:
Chlorine is recycled from oxidation and
reduction
>
>
>
Chlorination reactor:
Distillation and purification:
Metals converted to gaseous chlorides at
high temperature
Very high purity >99% achievable
in batch distillation
Selective cooling gives primary separation
of metal chlorides
Unveiling a new, vertically-integrated Niobium producer.
High grade niobium (and other)
metal oxides and powders:
Regenerated chlorine is
recycled back to the chlorinator
ASX GBE |
5
Strategic Highlights (Namibia)
• Application for land at HIZ Walvis Bay underway
• Successful attendance at Namibia Mining Expo. in Windhoek
• Key consultancy engagements
• Mutschler Associates (Namibia) - land, EIA etc.
• Dr. Detlof van Oertzen - Nuclear physicist (Namibia)
• Mr. Rogerio Pastore - Marketing
Unveiling a new, vertically-integrated Niobium producer.
ASX GBE |
6
Strategic Highlights (Malawi)
• Mining Development Agreement signed March 2023
• Agreement on relocation process with Malawi Govt. Ministries (Mines & Land)
• Agreement on CDA/Trust from Kanyika Traditional Authorities
• Project Manager (Mr. Louis Schoeman) for mine site construction appointed November 2023
• Start of Shared Services programme (Onyx)
Unveiling a new, vertically-integrated Niobium producer.
ASX GBE |
7
Strategic Highlights (Rio)
• Successful participation in T.I.C. Annual Conference in Rio de Janeiro
• Focus was to engage with potential off-take partners and strategic partners/investors
• 19 meetings over 2 days with industry players
• Keen interest in niobium oxide supply from Chinese and other users
• Samples from current laboratory pilot plant program requested by 13 industry players (Q4 2023/Q1 2024)
Unveiling a new, vertically-integrated Niobium producer.
ASX GBE |
8
Oxide Pricing
• Pricing for oxides confirmed to be rising due to limited availability
Nb 99.99 over 1 year $per kg
Nb 99.5 over 1 year $per kg
50
60
48
46
55
44
42
50
40
38
45
36
34
40
32
30
35
Nb 99.99
Unveiling a new, vertically-integrated Niobium producer.
Nb 99.5
ASX GBE |
9
Refinery
• Global IP exclusivity (Niobium) signed with TCM (5 years)
• Initial positive results from 20kg. test work – excellent Nb/Ta recoveries @ >99%
• Gas-phase chlorination identified as best processing solution for an African producer:
• Based on well-known process technology for the
production of titanium and magnesium metals
• Eminently suitable for ore that contains a suite of
potential metal products
• Lower operating costs
Unveiling a new, vertically-integrated Niobium producer.
• Significantly improved ‘green’ credentials
• Plant can be built within the region
• Infrastructure, construction & operational skills
readily available in South Africa and Namibia
• Scalable
ASX GBE | 10
Potential Product Suite
Unveiling a new, vertically-integrated Niobium producer.
ASX GBE | 11
Timeline
Milestones
Mining licence granted
DFS complete
MDA granted
Extraction test complete
TCM exclusivity signed
Small scale sample complete
Impurities identified
Strategic & Offtake discussions
Preliminary Plant & Site Layout
Gap review on updated feasibility
Updated feasibility complete
Offtake samples
Offtake agreements
Funding finalised
Decision to mine
EIA for refinery
Plant Engineering & Procurement
First ore
Refinery Engineering and Procurement
Plant Installation & Commissioning
First concentrate
Refinery Installation & Commissioning
First refined product
Phase 2 ramp up
Q3 2021 Q1 2023 Q4 2023 Q1 2024 Q2 2024 Q3 2024 Q4 2024 Q1 2025 Q2 2025 Q3 2025 Q4 2028
Unveiling a new, vertically-integrated Niobium producer.
Complete
Forecast
ASX GBE | 12
info@globemm.com
+61 8 6118 7240
Globe Metals & Mining Ltd
ABN 33 114 400 609
ASX:GBE
ASX GBE| globemm.com
45 Ventnor Avenue
West Perth WA 6005
Australia
eNews
Join the conversation
https://twitter.com/GlobeMet
alsASX
Follow us
https://www.linkedin.com/
company/globe-metalsmining-ltd
Subscribe to our e-news:
globemm.com
Competent person’s
statement
Mineral resource estimates:
Ore reserves:
The information in this report that relates to Mineral Resources is extracted from the report titled
“Kanyika Niobium Project – Updated JORC Resource Estimate” released to the Australian Securities
Exchange (ASX) on 11 July 2018 and available to view at www.globemm.com and for which Competent
Persons’ consents were obtained. Each Competent Person’s consent remains in place for subsequent
releases by the Company of the same information in the same form and context, until the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The information in the report that relates to Ore Reserves is extracted from the report titled “Kanyika
Niobium Project – Project Feasibility and Economics” released to the Australian Securities Exchange
(ASX) on 19 August 2021 and available to view at www.globemm.com and for which a Competent
Person’s consent was obtained. The Competent Person’s consent remains in place for subsequent
releases by the Company of the same information in the same form and context, until the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the
information included in the original ASX announcement released on 11 July 2018 and, in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters underpinning
the estimates in the original ASX announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Persons’ findings are presented
have not been materially modified from the original ASX announcement.
The Company confirms that is not aware of any new information or data that materially affects the
information included in the original ASX announcement released on 19 August 2021 and, in the case of
estimates of Ore Reserves, that all material assumptions and technical parameters underpinning the
estimates in the original ASX announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings are presented
have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 titled “Kanyika Niobium
Project – Updated JORC Resource Estimate” and is available to view at www.globemm.com
Full details are contained in the ASX announcement released on 19 August 2021 titled “Kanyika
Niobium Project – Project Feasibility and Economics” and is available to view at www.globemm.com
Production target and forecast financial information:
The production target and forecast financial information derived from the production target included in this presentation were first announced to the ASX in the announcement released to the
ASX on 19 August 2021 titled “Kanyika Niobium Project – Project Feasibility and Economics”. Globe confirms that all the material assumptions underpinning the production target and the
forecast financial information derived from the production target as reported to the ASX on 19 August 2021 continue to apply and have not materially changed.
Full details are contained in the ASX announcement released on 19 August 2021 titled “Kanyika Niobium Project – Project Feasibility and Economics” and is available to view at
www.globemm.com
Unveiling a new, vertically-integrated Niobium producer.