Highlights
•
Positive outcomes from the Optimisation Study for the Kanyika Niobium Project in Malawi,
showcasing robust financial metrics such as a pre-tax NPV of US$1 billion and an IRR of 47%.
•
Two-phase development strategy, reducing initial capital requirements from US$70 million to
US$30 million and mitigating risk while extending the mine life to 27 years.
•
The adoption of a sustainable and cost-effective chlorination process for refining niobium will
allow for the production of high-purity products and lower environmental impact.
•
Initiated production for its chlorination refinery pilot plant, aiming to produce high purity niobium
and tantalum oxide, progress with offtake agreements, and update feasibility studies.
•
The global niobium oxide market is thriving due to increased demand from sectors like
superconductors and defence, presenting opportunities for Globe’s high-purity products,
especially with rising prices and shifting trade dynamics.
Optimisation study
As announced on 5 February 2024, Globe detailed the positive results of the Optimisation Study for the
Kanyika Niobium Project in Malawi. The study supports robust financial and technical outcomes,
including a pre-tax Net Present Value (NPV) of US$1billion and an Internal Rate of Return (IRR) of 47%.
Other highlights include a 15% reduction in the total unit cost of Niobium Pentoxide to US$18.90/kg, and
a gross profit margin increase of 5% to 71%, alongside a projected 27-year mine life.
The project will use a two-phase development approach, reducing initial capital requirements from
US$70 million to US$30 million, which also significantly lowers risk. A key development is the adoption of
the more sustainable and cost-effective chlorination process for refining, which also allows for the
production of high-purity products that can fetch premium prices.
Globe emphasized the strategic placement of the refinery in Malawi due to favorable regulatory and
financial conditions, a stable environment, and cost-effective resource availability. The project aims to
produce high-purity niobium and tantalum oxides, targeting specialty markets rather than the mainstream
ferro-niobium market.
The environmental strategy for the project includes a focus on minimal carbon emissions, supported by
hydroelectric and solar power, ensuring the production of Niobium without the need for fossil fuels. The
ongoing metallurgical test work and the development of a refinery pilot plant underline Globe's
commitment to advancing the Kanyika Project towards financing and development, leveraging its
potential to become a globally significant niobium oxide source.
For the quarter ended 31 March 2024
3
Test work
On 12 March 2024, Globe announced the successful initiation of production for concentrate feedstock
destined for its chlorination refinery pilot plant, following the completion of flotation economic
optimisation test work. This process identified the most efficient and cost-effective reagents.
The company is now processing a 10-tonne bulk sample from the Kanyika mine to produce niobium and
tantalum concentrate. This production aligns with previous locked cycle tests and reflects a strategic
focus on achieving high recovery rates.
The next steps include using this concentrate in the chlorination refining process, which is noted for its
lower environmental impact versus the conventional acids leech process. This process will enable Globe
to progress with offtake agreements, advance and update further feasibility studies, and produce
Niobium oxide samples for potential off-takers. The pilot plant's construction marks a critical phase
towards refining and eventually marketing the high-purity products expected from this environmentally
sustainable technology. Globe collaborates with various technical service providers to ensure the
efficient execution of this project.
Figure 1: Distillation column for Globe’s Pilot Plant under construction at Resonant Group’s facility in
Johannesburg, South Africa.
On 19 March 2024, Globe reported successful advancements in its chlorination refining test work, crucial
for the production of Niobium Oxide and Tantalum. The recent tests confirmed the effective extraction
and separation of these metals, achieving extraction rates of over 99% for Niobium and Tantalum, as well
For the quarter ended 31 March 2024
4
as Zirconium. This method also successfully removes radioactive materials from the product, ensuring
that the final Niobium/Tantalum products contain no radioactive materials.
Additionally, the tests facilitated the successful extraction and separation of over 94% of key Rare Earth
Elements (REEs), which are valuable by-products of the refining process. The process involves the
formation of water-soluble Rare Earth chlorides, which are then concentrated and sold.
With these promising results, Globe has commenced the construction of a refinery pilot plant to produce
marketing samples. These developments are aimed at refining and marketing high-purity niobium oxide
products, with the pilot plant expected to be operational by May 2024. This plant will further support the
production and distribution of these high-grade materials to key off-takers, advancing the commercial
potential of the Kanyika Project.
Niobium market update
China is ramping up its production in the superconductors industry, and expanding its defence sector
Both sectors use niobium oxide. Market analyses show that the nanocrystalline sector, predominantly
utilized in the energy and electronics fields, is thriving. This development is advantageous for Globe as
the current shortage of oxides in the market has driven prices up to approximately USD 60/kg (Refer
Figure 2 below). European companies are increasingly avoiding columbite imports from Central and
North Africa, aligning with their commitments to shun minerals from conflict zones and thereby
increasing support for Southern Africa projects. Meanwhile, in Brazil, the government is actively shutting
down illegal mines and striving to curb these unlawful operations. Globally, the niobium pentoxide
(Nb2O5) market is robust, fueled by strong demand from the aerospace, defense, and MRI industries.
During the quarter, significant advancements in battery technology and materials science have marked a
transformative year for industries ranging from automotive to aerospace, with notable developments in
niobium-based technologies and ultra-fast charging capabilities.
Echion Technologies has enhanced the lithium-ion battery market with its niobium-based XNO® anode
materials, supported by a significant investment from Volta Energy Technologies. This financial boost is
set to scale up production to meet rising global demands, particularly in North America and Asia. In
partnership with CBMM, Echion is constructing a facility capable of producing 2,000 tons of anode-grade
niobium oxides annually, aiming to diversify CBMM’s portfolio into battery materials amidst increasing
electrification trends.
Nyobolt has introduced groundbreaking developments in EV battery technology, notably through its Boltee Mobile Supercharger, which offers a 100-mile range recharge in under ten minutes. The firm has
engineered batteries capable of fully charging in six minutes, significantly exceeding traditional charging
speeds, and ensuring over 10,000 charge cycles. These innovations are supported by strategic
collaborations, including with Callum to develop a high-performance electric sports car, demonstrating
practical applications of its rapid charging technology.
Battery Streak has made strides in reducing battery charging times drastically, aiming to revolutionize
power management across various sectors. Their collaboration with the US Navy to develop fastcharging, reliable technologies underscore their commitment to advancing battery performance.
The use of Niobium C103 alloy in high-technology applications, particularly in aerospace and defense,
highlights its capacity to endure extreme conditions, essential for hypersonic vehicles and aerospace
For the quarter ended 31 March 2024
5
components. The advancement in additive manufacturing (AM) technologies has opened new avenues
for producing complex parts efficiently, signaling broad industrial applications beyond traditional
aerospace roles.
These collective advancements in the quarter underscore a pivotal shift in battery and materials
technologies, driven by innovations in niobium usage and enhanced charging capabilities, setting new
standards and opening new markets in the global tech landscape. These factors together with demand
and market dynamics in consumer electronics production and sale as well as supply constraints due to
export and manufacturing regulations, mining policies and geopolitical tensions, had the impact of
increasing market prices.
Figure 2. Niobium Pentoxide prices Q1 2024.
Looking forward
From May 2024 Globe will commission and operate its chlorination pilot plant to produce high purity
niobium and tantalum oxides. Marketing samples will be provided to key off-takers in the North America
and Europe, as part of the process to finalise key product offtake agreements. The update of the
Definitive Feasibility Study (DFS) is slated for completion in the fourth quarter of 2024. Board approval to
execute the project is anticipated in the first quarter of 2025. The construction of the mine, concentrator,
and refinery in Malawi, constituting Phase 1 of the project, will involve 18 months of construction time.
Commissioning and production are expected to commence circa 2026.
Regional growth opportunities
Globe has embarked on a review of several highly promising regional exploration projects, which align
with the company’s strategic goals for development in the region. They have pinpointed 5 to 6 projects
where drilling has confirmed both the grade and the size of the mineral deposits.
For the quarter ended 31 March 2024
6
The focal commodities of these explorations are particularly strategic and include both light and heavy
Rare Earth Elements (REEs), Niobium, pegmatitic Lithium, as well as a variety of Base Metals and
Platinum Group Metals (PGMs).
From a strategic standpoint, Globe is considering the application of its proprietary Chlorination refining
technology. This innovative method could enable the local refining of REE and Base Metal concentrates,
presenting an opportunity for in-country processing and adding value within the region.
To fund these ventures, Globe is exploring a range of innovative and non-dilutive financing options.
These could encompass debt financing, equity swaps, partnerships or joint ventures, asset-based
financing, convertible instruments, and royalty financing, among others. These financial strategies are
designed to fund the projects in a way that is creative and preserves shareholder value.
Macro-economic market update
The capital raising market for strategic metals in the USA and Europe has seen significant activity,
reflecting the importance of securing a domestic supply chain for materials critical to the green energy
economy. In the USA, investment advisor Appian Capital Advisory committed a $230 million financing
package to U.S. Strategic Metals (USSM) for the development of a cobalt/nickel mine and a
hydrometallurgical battery metals recycling facility in Missouri. The funding includes a $120 million
secured term loan facility and a $70 million secured royalty financing arrangement, with commissioning
scheduled for late 2024. This positions USSM to become a fully integrated recycler and producer of
battery metals for the electric vehicle supply chain in the US.
LCR Capital Partners has launched a new $100M rural EB-5 fund to raise capital for USSM's project,
expected to create over 3,000 jobs. This project will address national security vulnerabilities by securing
a domestic supply chain for cobalt, nickel, copper, and lithium minerals critical to the green energy
economy.
In Europe, while the EU has a strategy that includes additional extraction and processing of critical
minerals, as well as recycling and minimum domestic requirements, it has been more reluctant to
engage in strategic stockpiling compared to the approaches taken in the US and China. The EU will
instead monitor nations' inventories and make non-binding opinions about strategic purchases if needed.
Some European firms have expressed concerns that centralized stockpiling might put additional
pressure on already scarce supplies and affect market prices.
Alternative financing options in the mining industry, such as net profits interest and asset monetization
through tolling or joint ventures, are also becoming more prevalent. These options provide funding
without significantly affecting companies' debt ratios or market capitalisation.
Globally, there is recognition of the need to secure critical mineral supply chains, as evidenced by the
American and Australian governments’ recent initiatives to bolster domestic production of these minerals
through loans and grant programs.
This focus on securing and financing the supply of strategic metals reflects the increasing demand for
these materials in various industries, especially in the context of the transition to green energy and the
rising geopolitical stakes associated with these commodities.
For the quarter ended 31 March 2024
7
Corporate
Cash position
At the end of the quarter, the Company was debt-free and held cash of $2.277 million (31 December
2023: $3.365 million).
Appointment of Chief Operating Officer
During the quarter (10 January 2024), Globe announced the appointment of Mr Paul Smith as Chief
Operating Officer, bringing over 30 years of global mining industry expertise. Mr Smith’s extensive
background includes senior roles at major mining firms and a strong track record in exploration, project
development, and capital markets. His previous positions at Aquarius Platinum Limited, Wesizwe
Platinum Limited, and Impala Platinum Holdings Limited highlight his significant contributions to the
industry and align well with Globe's strategic objectives. As Globe transitions into a phase of operational
growth, Mr Smith's appointment signifies a pivotal moment for the company, positioning it for further
success and expansion in the global mining landscape.
Retirement of Chief Executive Officer and CEO Designate appointment
At the same time, Grant Hudson, CEO of Globe, announced (6 March 2024) his retirement effective 31
May 2024, with Paul Smith succeeding him as CEO from 1 June 2024. Smith, previously COO, brings
over 30 years of mining industry experience and is praised for his role in recent project advancements.
Hudson's tenure has been marked by significant milestones, including Globe's transition from a junior
explorer company to an operating mining company, setting a strong foundation for Smith to lead the
company into its next phase of growth. This transition in leadership reflects Globe's commitment to
continuity and stability, ensuring a smooth trajectory for its ongoing operations and strategic initiatives.
As Smith assumes the role of CEO, Globe looks forward to utilising his extensive experience and
leadership to drive further innovation, sustainability, and value creation across its projects and
operations.
Globe appoints strategic investor relations partner in Europe
Post quarter end (4 April 2024), Euroswiss Capital Partners Inc (Euroswiss) was appointed as Globe’s
strategic partner to enhance recognition and liquidity in central European markets, emphasising tailored
investor relations and cross-listing strategies to expand visibility and access to European investors. The
partnership with Euroswiss aligns with Globe’s broader strategy of expanding its investor base and
increasing market presence, particularly in regions with high demand for strategic metals. By leveraging
Euroswiss's expertise and network in Europe, Globe aims to strengthen its relationships with investors
and stakeholders, fostering sustainable growth and value creation in the years ahead. The strategic
partnership with Euroswiss represents a significant step forward in Globe’s investor relations efforts,
providing access to new markets and opportunities for collaboration that will support the Company’s
long-term growth objectives.
Cross-listings in Germany
Post quarter end, the Company initiated cross-listings on German exchanges, including the Frankfurt
Stock Exchange (FSE), regional German stock exchanges, and the Tradegate Exchange, under the
ticker symbol “G4U”. This strategic move aims to enhance brand visibility and market liquidity in central
European capital markets. The Company’s ordinary shares will still trade on the ASX as “GBE”. These
cross-listings enable overseas investors to engage in Globe's developments, particularly the Kanyika
For the quarter ended 31 March 2024
8
Niobium Project. The reactivation of Globe’s Legal Entity Identifier (LEI) expands its investor base,
enhances liquidity, and broadens its European audience. Trading information is available on the Börse
Frankfurt website. Additionally, cross-listings on the Berlin Stock Exchange (BER), Hamburg Stock
Exchange (HAM), and Stuttgart Stock Exchange (SWB) further facilitate international investment
opportunities.
Post quarter end (26 April 2024), the Company issued the following unquoted securitoies:
•
Number of options:
2,000,000
•
Exercise price:
$0.06
•
Term:
4 years from the date of issue (expiry date 26 April 2028)
•
Name of recipient:
Euroswiss Capital Partners Inc.
•
Recipient address:
Sempacher Str. 15, 6003, Lucerne, Switzerland
•
Class:
New unlisted option class GBEPOT3
ASX additional information
ASX Listing Rule 5.3.1: There were no substantive mining exploration activities during the quarter. Work
was confined to evaluation. The Company expended approximately $514,000 on evaluation activities
(refer section 2.1(d) of Appendix 5B).
ASX Listing Rule 5.3.2: There were no substantive mining production and development activities during
the quarter.
ASX Listing Rule 5.3.5: A total of $74,000 was paid to related parties during the quarter comprising NonExecutive Directors’ fees (including superannuation).
Shareholding information
At 31 March 2024, shares on issue totalled: 675,867,588. The number and distribution of holders at 31
March 2024 was:
Holding Ranges
above 0 up to and including 1,000
above 1,000 up to and including 5,000
above 5,000 up to and including 10,000
above 10,000 up to and including 100,000
above 100,000
Totals
Holders
65
40
63
314
159
641
Holding
% IC
1,746
130,710
500,173
13,947,624
661,287,335
675,867,588
0.00%
0.02%
0.07%
2.06%
97.84%
100.00%
Holding
% IC
351,405,158
118,143,062
51.99%
17.48%
69,428,662
10.27%
Top 20 holders at 31 March 2024
Position
Holder Name
1
2
APOLLO METALS INVESTMENT COMPANY LIMITED
AO-ZHONG INTERNATIONAL MINERALRE SOURCES
PTY LTD
TRIPLE TALENT ENTERPRISES LTD
3
For the quarter ended 31 March 2024
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
9
BNP PARIBAS NOMINEES PTY LTD ACF
CLEARSTREAM
MR COLIN ROBERT SEARL &
MRS CYNDA SEARL
CITICORP NOMINEES PTY LIMITED
M & K KORKIDAS PTY LTD
<M & K KORKIDAS PTY LTD A/C>
BNP PARIBAS NOMS PTY LTD
MR RICHARD ULRICK &
MRS WENDY ULRICK
<ULRICK SUPER FUND A/C>
GOENG INVESTMENTS PTY LTD
<GOENG PENSION FUND A/C>
C & CR SUPERCO PTY LTD
<C & CR SEARL SUPERFUND A/C>
HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED A/C 2
BENRET PTY LTD
<COLIN SEARL FAMILY A/C>
GOTHA STREET CAPITAL PTY LTD
<BLUE SKY NO 2 A/C>
MR NOEL MALCOLM SCAMMELL
MR KELLY PETER BODMAN
MR DRITAN MEHMETI
MR MARK LEONARD SWANSON
MR BAHRAM REZAEI
MR PHILLIP ADRIAN GLENN
Total
Total issued capital – selected security class(es)
14,248,089
2.11%
12,349,888
1.83%
8,253,635
5,759,000
1.22%
0.85%
4,952,391
3,934,439
0.73%
0.58%
3,858,697
0.57%
3,768,888
0.56%
3,459,844
0.51%
3,361,888
0.50%
2,871,810
0.42%
2,806,000
2,520,562
2,000,000
1,725,000
1,600,000
1,501,693
617,948,706
675,867,588
0.42%
0.37%
0.30%
0.26%
0.24%
0.22%
91.43%
100.00%
Schedule of mineral tenements at 31 March 2024
Country
Project Type
Status
Tenement
Malawi
Kanyika
Granted
LML0216/21*
Mining Licence
Interest held by Globe
31 Mar 2024
31 Dec 2023
100%
100%
There were no tenements acquired or disposed during the quarter.
* Pursuant to the Mines and Minerals Act, the Malawi Government is entitled to a 10% free equity interest
in LML0216/21 subject to formally notifying GMMA of its desire to take up its entitlement. As at the date
of this report, neither the Company nor GMMA has received any such notice.
Authorisation for release
This report was authorised for release by the Board of Directors.
For further information, please contact:
Paul Smith
Chief Operating Officer
+61 8 6118 7240
paul.smith@globemm.com
For the quarter ended 31 March 2024
10
Qualifying Statements
Mineral Resources Estimates
The information in this report that relates to Mineral Resources is extracted from the report titled “Kanyika Niobium Project –
Updated JORC Resource Estimate” released to the Australian Securities Exchange (ASX) on 11 July 2018 and available to view
at www.globemm.com and for which Competent Persons’ consents were obtained. Each Competent Person’s consent remains
in place for subsequent releases by the Company of the same information in the same form and context, until the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the information included in the
original ASX announcement released on 11 July 2018 and, in the case of estimates of Mineral Resources, that all material
assumptions and technical parameters underpinning the estimates in the original ASX announcement continue to apply and
have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are
presented have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 titled “Kanyika Niobium Project – Updated JORC
Resource Estimate” available to view at www.globemm.com.
The information in this report that relates to Ore Reserves is extracted from the report titled “Kanyika Niobium Project – Project
Feasibility and Economics” released to ASX on 19 August 2021 and available to view at www.globemm.com and for which
Competent Persons’ consents were obtained. Each Competent Person’s consent remains in place for subsequent releases by
the Company of the same information in the same form and context, until the consent is withdrawn or replaced by a subsequent
report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the information included in the
original ASX announcement released on 19 August 2021 and, in the case of estimates of Ore Reserves, that all material
assumptions and technical parameters underpinning the estimates in the original ASX announcement continue to apply and
have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are
presented have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 19 August 2021 titled “Kanyika Niobium Project – Project
Feasibility and Economics” available to view at www.globemm.com.
Disclaimer
This report has been prepared by Globe Metals & Mining Limited (Company). The material contained in this report is for
information purposes only. This release is not an offer or invitation for subscription or purchase of, or a recommendation in
relation to, securities in the Company and neither this release nor anything contained in it shall form the basis of any contract or
commitment.
This report may contain forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning the Company’s business plans, intentions, opportunities, expectations, capabilities, and other statements that are not
historical facts. Forward-looking statements include those containing such words as could-plan-target-estimate-forecastanticipate-indicate-expect-intend-may-potential-should or similar expressions. Such forward-looking statements are not
guarantees of future performance and involve known and unknown risks, uncertainties, assumptions, and other important
factors, many of which are beyond the control of the Company, and which could cause actual results to differ from those
expressed in this report. Because actual results might differ materially to the information in this report, the Company does not
make, and this report should not be relied upon as, any representation or warranty as to the accuracy, or reasonableness, of the
underlying assumptions and uncertainties. Investors are cautioned to view all forward-looking statements with caution and to not
place undue reliance on such statements.
The report has been prepared by the Company based on information available to it, including information from third parties, and
has not been independently verified. No representation or warranty, express or implied, is made to the fairness, accuracy or
completeness of the information or opinions contained in this report.
The Company estimates its reserves and resources in accordance with the Australasian Code for Reporting of Identified Mineral
resources and Ore Reserves 2012 Edition (JORC Code), which governs such disclosures by companies listed on ASX.
For the quarter ended 31 March 2024
11
Appendix A: About the Kanyika Niobium Project
Ownership 100% | Malawi
The Kanyika Project marks a milestone as the first major niobium endeavor in half a century. Considered
highly developed, the project underwent a Definitive Feasibility Study finalised in August 2021. Currently,
it is in the final stages of refining metallurgical test-work following the optimisation study conducted in
February 2023. This process aims to generate an updated feasibility study and establish a Pilot Plant
before project commencement. The project is fully integrated offering compelling economics - mining,
concentration, and refining within Malawi, and has shown notable success in niobium recovery through
chlorination refining. This method, preferred over traditional acid treatments for its environmental
benefits and lower energy consumption, also supports the extraction of rare earth elements as valuable
by-products, enhancing the project's economic appeal. The construction of a lab-scale pilot plant,
expected to be operational by May 2024, marks a significant milestone, enabling the production of
marketing samples for potential off-takers in Europe, Japan, and North America. This development is
crucial for securing offtake agreements and advancing towards the commercialization of niobium and
tantalum concentrates. The project's phased development strategy aims to minimize initial costs and
dilution for shareholders while seeking structured financing options to support its progression.
Figure 3. Location of the mine and refinery.
For the quarter ended 31 March 2024
12
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the regional
centre of Kasangu and is secured by Large-Scale Mining Licence No. LML0216/21 which grants the
Company security of tenure and the right to mine niobium, tantalum, and deleterious uranium.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have defined the extent of
mineralisation. Structured and progressive engineering studies have resulted in the current (JORC 2012)
Mineral Resource Estimate (refer below) and given rise to significant improvements and simplifications in
the process flowsheet.
The Kanyika operations will produce a pyrochlore mineral concentrate that contains both niobium and
tantalum in commercially valuable volumes to be shipped to a refinery for advanced processing into high
purity materials.
A Mineral Resource Estimate for the Kanyika Niobium Project under the 2012 JORC guidelines was
reported to ASX on 11 July 2018 as follows:
Table 1: MRE for KNP using a 1,500 ppm Nb2 O5 lower cut
Table 2: MRE for KNP using a 3,000 ppm Nb2 O5 lower cut
Category
Resource
(Mt)
Nb2 O5 (ppm)
Ta2 O5 (ppm)
Category
Resource
(Mt)
Nb2 O5 (ppm)
Ta2 O5 (ppm)
Measured
5.3
3,790
180
Measured
3.4
4,790
220
160
Indicated
47
2,860
135
Indicated
16.6
4,120
Inferred
16
2,430
120
Inferred
2.8
4,110
190
TOTAL
68.3
2,830
135
TOTAL
22.8
4,220
190
Kanyika has the potential to become the first new globally significant niobium mine in 50 years, with an
average nameplate production of 3,267 tonnes per annum (tpa) of niobium pentoxide, (Nb2O 5) and 136
tpa of tantalum pentoxide (Ta 2O 5) over the 27-year life of operations. The Nb2O 5 and Ta2O 5
products will be high-specification high-purity products with grades exceeding 99.5% and 99%
respectively.
Standard Niobium oxide is being used in the anodes of fast charging batteries (charging to 100% in less
than 10 minutes). These batteries have application in large vehicles that cannot afford excessive
charging time. These include haul trucks, trains, front-end loaders, underground mining machinery, etc.
They are also being used in batteries for handheld tools where fast charging is an advantage.
High purity Niobium is an integral component of daily-use, energy-related, and specialty technologies
such as superalloys (e.g., for aircraft engines, rocket assemblies, etc), and superconducting magnets
(e.g., for medical imagin
Share your feedback
Discover