Annual Report to shareholders
Released
Released
Announcement PDF
Annual Report
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
For the year ended 30 June 2023
An emerging,
vertically integrated
niobium producer.
Globe Metals & Mining Limited
ABN 33 114 400 609
ASX: GBE
globemm.com
0
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
1
Contents
02
03
05
14
16
19
19
22
25
37
39
42
65
66
70
Corporate
Directory
Cautionary
Statements
Remuneration
Report
Directors
Declaration
Chairman’s Letter
Directors’ Report
Auditor’s
Independence
Declaration
Independent
Auditor’s Report
Review of
Operations
Tenements
Consolidated
statement of
nancial position
Additional ASX
Information
Niobium Market
Update
Resource
Statement
Notes to the
nancial
statements
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
Niobium is shaping the future of
science and technology, driving
innovations across multiple
industries.
Globe Metals & Mining is developing the
world’s next niobium oxide plant.
Corporate Directory
Directors and Company Secretary
Stock Exchange Listing
Ms Alice Wong
Mr Ricky Lau
Mr Bo Tan
Mr Michael Barrett
Mr Michael Choi
Mr Paul Hardie (Company Secretary)
Australian Securities Exchange Ltd
ASX Code: GBE
Senior Management
Mr Grant Hudson, Chief Executive Officer
Mr Rex Zietsman, Chief Technical Officer
Mr Charles Altshuler, Chief Financial Officer
Head Office and Registered Office
45 Ventnor Avenue
West Perth
Western Australia
6005
Australia
Phone: (08) 6118 7240
Fax: (08) 6323 0418
www.globemm.com
Australian Business Number
33 114 400 609
Auditors
Australia:
BDO
Level 9
Mia Yellagonga Tower 2
5 Spring Street
Perth WA 6000
Australia
Malawi:
Deloitte
Deloitte House
Next to National Library
Box 30364 Lilongwe 3
Malawi
Banker
Westpac Banking Corporation Limited
Share Registry
Automic Group
Level 2, 267 St Georges Terrace
Perth WA 6000
Phone: 1300 288 664
2
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
3
Chairman’s Letter
Dear shareholders and interested persons,
Our vision to develop the first globally significant niobium mine in 50 years moved closer over the
2023 financial year as the Company made great strides in advancing its flagship Kanyika Niobium
Project in Malawi.
In March 2023, Globe achieved a historically significant milestone when the Malawi Government
approved the Mining Development Approval (MDA) for Kanyika, the first MDA executed since the
enactment of the Mines and Minerals Act 2018. This was not only a testament to the perseverance and
professionalism of our management, but also to the commitment of the Malawi government to fostering a
conducive investment climate for foreign investors and positioning mining as a strategic economic pillar
for the country.
In June 2023, Globe received a letter from the Malawi government to assure the continued security of
tenure for our mining licence LML0216/21. We also hosted the new Minister of Mining The Honourable
Monica Chang’anamuno and the Minister of Energy The Honourable Ibrahim Matola at the Kanyika mine
site. In addition, we hosted the Minister and other senior officials at the Africa Down Under Conference
held in Perth in September 2023.
In late June, we selected six highly experienced vendors to complete the design and construction of both
the mineral processing plant and refinery. To complement these appointments, we are looking to bolster
our senior management team with seasoned mining project professionals for both the Malawi and
Namibia sites.
Once designs are finalised, all vendors will have their cost estimates verified and finalised for execution of
their respective portions of the overall plant and refinery. We expect this work to be completed by the first
quarter of 2024 after which the revised feasibility study will be published.
With preparation for the mine site to an advanced stage, our focus over the next two quarters will be on
the refinery site in Namibia and the completion of the refinery test-work program. We have applied for
land in the Walvis Bay Heavy Industrial Zone and our senior management attended the Namibia Mine
Expo in Windhoek to meet with our consultants and senior government officials in last September.
Test work on the 12-tonne sample collected in the first quarter of 2023 has begun and we look forward to
sharing positive results over the next few quarters. We are actively engaging with potential offtake
partners to secure offtakes and the commercial samples produced through the pilot plant will be critical to
that process.
Expanding our workforce capability
In addition to the project developments in the 2023 financial year, Globe has considerably strengthened
its executive team. Mr Charles Altshuler was appointed as the Chief Financial Officer in November 2022.
He has a solid track record of financial and strategic business leadership with high-growth ASX-listed
companies. In May 2023, Malawi businessman Mr Macleod G. Nyirongo was appointed as a NonExecutive Director of Globe Metals and Mining (Africa) Limited. Mr Nyirongo has demonstrated
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
4
experience in the global mining sector and his successful track record of supporting the development of
African countries, during his time with the United Nations. In August 2023, Mr Rogerio Magalhães
Pastore was appointed as a consultant to assist the Company with marketing of its niobium oxide and
metals products, negotiating offtakes and generating strategic business opportunities. Mr Pastore’s
appointment comes at a pivotal time for Globe as it strives to capitalise on multiple emerging niche
markets for niobium, including rechargeable battery industry.
Capital raising
Subsequent to the 2023 financial year, Globe announced the undertaking of a 3 for 7 Entitlement offer to
raise up to approximately $8 million (before costs). Funds to be raised will be allocated to technical
feasibility work, metallurgical test work and pilot plant work, and mine refinery preparation and planning
costs for the Kanyika Project. The Entitlement Offer offered an exciting opportunity for new and existing
shareholders to support the continued growth of Globe.
Looking forward - Globe is continuing on its ESG-compliant journey and becoming a vertically
integrated niobium oxide producer
As the demand for niobium grows, Globe is ideally placed to position as a vertically-integrated supplier of
high-grade niobium oxides. With the majority of the world’s supply of such oxides emanating from either
China or a single supplier in Brazil, Globe offers a compelling alternative in a supply-constrained market,
and we move into the 2024 financial year in an excellent position to capitalise on a game-changing
market opportunity.
I thank all shareholders, the Board of Directors, our employees and other service providers for your
support of Globe Metals and Mining over the past year.
Yours faithfully,
Alice Wong
Non-Executive Chairperson
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
Review of Operations
5
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
6
Kanyika Niobium Project
Malawi
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the
regional centre of Kasangu and secured by Mining Licence LML0216/21. Niobium usage is rapidly
increasing and is at the forefront of numerous new-age technologies including gas and wind
turbines, medical imaging, particle accelerators and space travel as well as the manufacture of
high-performance and ultra-safe, ultra-rapid rechargeable batteries for electric vehicles.
The Company is well on the way to opening only the fourth niobium mine in the world (and the first such
mine into production in the last 50 years) and the first ever in Africa. The production of high-grade
niobium oxides from Africa will improve the current geographic concentration of major niobium suppliers
(with only two in South America and one in Canada) and help mitigate existing supply chain risks for the
whole industry.
In March 2023, Globe announced a critical development in that the Malawi Government had approved
the Mining Development Agreement (MDA) for the Project. This was of particular significance since
Globe is the first company to finalise their MDA since the enactment of the Mines and Minerals Act in
2018. We can now move forward with confidence as we transition from an exploration company to a fullyfledged mining and refining operation.
Figure 1. Signing ceremony for the Mining Development Agreement between the Globe and Malawi Government:
29 March 2023
Key contractual terms of the Mining Development Agreement:
The MDA governs the relationship between Globe, the Malawi Government, and the people of Malawi in
relation to the Project, and carries conditions regarding sustainable development and economic, social,
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
7
and environmental investment. Its aim is to ensure that, whilst Globe expects to generate a profit from its
investment and know-how, the Republic of Malawi and its people will benefit as well.
The key contractual terms of the MDA are as follows:
•
Globe has the right to mine niobium, tantalum, and deleterious uranium at the project, and to
establish and operate a grinding, crushing and concentrator facility located in the project area.
•
The MDA is subject to and conditional upon the Company obtaining:
a satisfactory ruling from the Malawi Revenue Authority in relation to the determination of gross
revenue in respect of product produced from the mining and processing of ore at the project;
and
an extension to the time limits prescribed under the Act for the commencement of substantial
mine development, and substantial mineral production, at the project to ensure those time limits
are consistent with the timeline contemplated in the MDA.
•
Globe is required to make a decision to mine at the project within 24 months of being granted the
mining licence for the project and obtaining a credit approved term sheet from a third-party domestic
project lender to secure the funds required to develop the project.
•
Globe is required to comply with all applicable foreign currency laws but is permitted to maintain one
or more foreign currency accounts outside of Malawi to meet its foreign currency obligations to the
initial Project Lender for a period of seven years after the establishment of the relevant account or the
date on which the Company has discharged all its obligations to the initial project lender. These
obligations include (but are not limited to) the payment of interest and principal to the Project Lender,
the payment of mandatory pre-payments to the project lender, and the establishment and
maintenance of reserves as required by the project lender.
•
The Malawi Government is to receive, at no cost, a non-diluting 10% equity interest in the project,
with an option to acquire up to a further 10% equity interest (Equity Option) upon completion of the
construction, commissioning, and start-up of operations at the Project as approved by the Project
Lender. The Equity Option is a fully contributory interest and is capable of being diluted if the
Government does not meet any call by Globe for additional equity funding.
•
The Malawi Government will receive a statutory royalty of 5% of all revenue earned from the mining
and processing of ore at the Project. The Kanyika community will receive a royalty of 0.45% as
prescribed under the Act. Globe is required to maintain a ratio of indebtedness to net worth that is
equal to or lower than 3:1 at all times during the life of the Project.
•
Prior to commencing construction of the Project, Globe must pay a $1 million environmental bond to
secure performance of its obligations to comply with all applicable environmental laws.
•
Globe is responsible for the resettling of affected Malawi citizens in accordance with an approved
resettlement framework.
•
Globe shall commit to the preferential employment and training of Malawi citizens for operations and
unskilled labour positions at the Project, and in the areas of financial, accounting, technical,
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
8
administrative, supervisory, managerial, and executive positions (subject to applicants having the
necessary skill and experience and being suitable for those roles).
•
Globe shall preferentially procure goods and services from local Malawi businesses provided that
those goods and services are at least comparable in terms of quality, delivery, service, quantity, and
price.
•
Globe will be exempt from import duty and import excise, and will be zero-rated for VAT, on the
import of capital goods, consumables, and services throughout the life of the Project.
•
Globe will enjoy the benefits of a stable tax regime for up to 10 years from the date of execution of
the MDA.
12-tonne sample extracted for Phase 1 Plant Feasibility Study
During the reporting period, Globe completed its 12-tonne sampling program at the mine site. The
sample was shipped to various laboratories in Johannesburg and is being used to facilitate important
metallurgical testing, inter alia:
•
Commence desktop test work to finalise the design of the pilot plant to be used for the full test work
program;
•
Determine the operating parameters for the implementation of chlorine gas-vapour technology for
the extraction and refining of Kanyika Concentrate material;
•
Confirm the ability of the process to recover metals at a rate of >95% and to produce oxides with a
grade of >99.5%;
•
Confirm the potential suite of finished products viz. Nb2O5, Ta2O5, ZrO, FeO;
•
Produce the engineering parameters for the design, construction and operation of the Phase 1
plant; and
•
Produce the data needed to update the Globe Feasibility Study
The program will also produce +/- 30 x 1kg commercial-grade samples to provide to interested off-take
partners.
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
9
Figure 2. Sample collection at Kanyika mine site: 28 April 2023
Critical vendors selected
The company also announced the selection of six highly experienced vendors to advance the Project.
Solo has been selected to design and construct the mineral processing plant at our mine site. Based in
Johannesburg, Solo has a wealth of experience in the design, build and commissioning of mineral plants
in South Africa, and has supplied such installations all over the Continent.
TCM Research has been selected to customise their chlorination process for the Globe refinery in
Namibia and to determine the design parameters of that refinery. TCM has worked with more than 10
different ore concentrates that contain niobium and tantalum. In addition, they have processed
concentrates containing platinum group metals, rare earths, gold, tin, vanadium and iron, tungsten, zircon
and hafnium, nickel and copper sulphides as well as low levels of radioactive materials such as uranium,
thorium and other fission daughter products. The advantage of the chlorination process is the ability to
convert the bulk of these into chlorides that can be separated and purified to high grades. The chlorides
are then oxidized to oxides and chlorine which is recycled to the reactor.
The Resonant Group will complete the engineering drawings for the refinery using the design
parameters as determined through the laboratory test work completed by TCM Research. Resonant is a
multi-disciplinary engineering business active in the metals, minerals, chemicals, oil and gas, and
infrastructure sectors. Whilst based in South Africa, Resonant is also active in the Americas, Europe, Asia,
and the Middle East.
Globe has selected Geolabs Global as the laboratory to process the Kanyika ore to concentrate.
Geolabs Global is a leading provider of mineral processing solutions for the mining and minerals industry
based in South Africa.
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
10
For Phase 1 of its Kanyika project, The Company has selected Malawi-based construction company, S.R.
Nicholas Ltd, to provide the preliminary design and civil engineering of the plant.
An innovative milling solution at the Kanyika site will be provided by EDS. Since 2016, EDS has been
developing a horizontal, multi-shaft mill that has a significantly lowered power consumption than the
equivalent SAG ball mill. The EDS mill produces -1mm crushed ore that is ideal for gravity spiral
separation and is expected to allow some gangue to be discarded prior to reaching the ball mill. In the
revised flowsheet, Globe expects both capex and opex to be reduced by about 10%. The final cost
savings will be published in the revised feasibility study.
Refinery Design
The final refinery design is dependent on the current test work results which will determine the bespoke
process design criteria to be used in the final engineering drawing. The target for completion of all design
work is Q4 2023.
Feasibility Study
Once the refinery design is finalised, all vendors will have their cost estimates verified and finalised for
execution of their respective portions of the overall plant and refinery. Globe anticipates this to be
completed by Q1 2024 when the revised feasibility study will be published.
Strong government support
The Malawi Government’s endorsement and support of the Kanyika Project was evident throughout the
2023 financial year, and during the period under review the Company received a letter from the
Department of Mines of the Malawi Government endorsing the ongoing efforts of Globe to acquire and
mobilise resources and assured the continued security of tenure for mining license LML0216/21.
Commenting on Globe’s efforts to progress the Project, the Malawian Commissioner of Mines and
Minerals stated:
“I would like, therefore, to assure your Company, in view of Section 174(6) of the Mines and Minerals Act
(No. 8 of 2019), of the continued security of tenure for the aforementioned Mining Licence since there is
a reasonable expectation that following the signing of the Mining Development Agreement (MDA)
between Government and your Company on 29th March 2023, over the Kanyika Niobium Project:
(i)
Mine development shall commence within eighteen (18) months from date of the signing of
the MDA; and
(ii)
Substantial commercial mineral production at your Project site shall commence within 60
months from the date of the signing of the MDA.”
The sentiment of approval in the Government’s letter was supported when Globe received a site visit
from the Honourable Monica Chang’anamuno (Minister of Mining) and the Honourable Ibrahim Matola
(Minister of Energy) on 8 June 2023 to inspect the progress of the Project.
The Project is located between the areas of Senior Chief Inkosi Mabulabo of Mzimba District and
Traditional Authority Simblemba of Kansungu District and both Government Ministers were pleased with
the Company’s operations to date, and advancements made.
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
11
During the visit, The Honourable Monica Chang’anamuno commented on the cordial working relationship
with the Ministry of Energy, with the Honourable Ibrahim Matola pledging to expedite the connection of
electricity at the Kanyika mine site.
Figure 3. Location of the mine and process plant.
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
Globe was honoured to host Hon. Monica Chang’anamuno (Minister of Mining), Hon. Werani Chilenga
(Chair of Parliamentary Natural Resources Committee), Dr. Joseph Mkandawire (Principal Secretary in
Ministry of Mining), Samuel Sakhuta (Commissioner of Mines and Minerals), and Stanley Nyama
(Director of Geological Survey Department) in Perth in September 2023 as part of the Africa Down
Under Conference.
Figure 4. Malawi Minister of Mining: Hon. Monica Chang’anamuno (Centre) –with Globe Directors Mr Michael
Barrett (Left) and Mr Michael Choi (Right) at the Africa Down Under Conference in Perth, September 2023.
12
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
13
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
14
Niobium Market Update
Niobium, often overshadowed by more well-known elements, is emerging as a silent hero in the
world of science and technology. Beyond its conventional uses, niobium is driving innovations
across various industries.
As niobium continues to reveal its hidden powers, it is shaping the future of memory technology and
influencing numerous other scientific and technological domains. Its remarkable properties make it an
unsung hero in a world craving efficient, sustainable, and high-performance solutions. Whether in data
storage, medical diagnostics, particle physics, or quantum computing, niobium is proving to be an
element of immense potential, poised to transform industries and redefine what's possible in science and
technology.
Niobium has a wide range of uses across various industries due to its unique properties. Some of the
diverse uses of niobium include:
•
Alloys: Niobium is commonly used as an alloying element in steel production. It improves the
strength, toughness, and corrosion resistance of the alloy. Niobium-based alloys are used in the
construction of pipelines, oil and gas exploration equipment, and automotive components.
•
Superconductors: Niobium is an important material in the field of superconductivity. It is used in the
production of superconducting wires and magnets for applications in medical imaging (MRI), particle
accelerators, and energy storage devices.
•
Nuclear industry: Niobium alloys are used in the nuclear industry due to their high-temperature
strength and resistance to corrosion. They are used in reactor components, fuel elements, and
cladding materials.
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
15
•
Electronics: Niobium compounds, such as niobates, are used in electronic devices. For example,
lithium niobate is used in the production of piezoelectric devices, optical modulators, and surface
acoustic wave devices.
•
Aerospace and defence: Niobium superalloys are used in the aerospace and defence industries
due to their high strength, low density, and resistance to high temperatures. They are used in aircraft
engines, rocket nozzles, and other high-performance applications.
•
Medical implants: Niobium is biocompatible and has low toxicity, making it suitable for use in
medical implants such as pacemakers, orthopaedic implants, and dental implants.
•
Chemical processing: Niobium compounds are used as catalysts in various chemical processes,
including petroleum refining, hydrogenation reactions, and oxidation reactions.
•
Jewellery: Niobium's unique properties, such as its hypoallergenic nature and ability to be anodized
in various colours, make it a popular material for jewellery, especially for individuals with metal
allergies.
•
Batteries: Niobium oxide batteries can be fully charged in less than 10 minutes at lower operating
temperatures and can withstand more than 10,000 charge cycles. Niobium oxide can also increase
the energy density of batteries by 200%.
These are just a few examples of the diverse uses of niobium. Its combination of strength, corrosion
resistance, and other desirable properties make it a valuable material in various industries 1.
Niobium's rise: Fueling faster charging, superconductors and quantum dreams, 5 September 2023;
https://www.theweek.in/news/sci-tech/2023/09/05/niobium-rise--fueling-faster-charging--superconductors-and-quant.html
1
Brazil’s CBMM expects niobium for batteries to make 25% of revenues by 2030, 13 September 2023;
https://www.fastmarkets.com/insights/brazils-cbmm-niobium-batteries-2030
Superconducting niobium waveguide achieves high-precision communications for B5G/6G networks, 2 October 2023;
https://www.eurekalert.org/news-releases/1003643
Niobium oxide plays a ‘network former’ role within silicate glass structures, 12 October 2023;
https://www.laserfocusworld.com/optics/article/14299972/niobium-oxide-plays-a-network-former-role-within-silicate-glassstructures
World’s Leading Niobium Anode Battery Materials Supplier (echiontech.com) 2023
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
16
Niobium is considered critical not just in Australia but also in the EU, US, Japan, and India.
Cautionary Statements
Forward-looking statements
This report may include forward-looking statements. Forward-looking statements include, but are not
limited to, statements concerning Globe Metals & Mining Limited’s business plans and other statements
that are not historical facts. When used in this report, words such as could-plan-target-estimate-expectintend-may-potential-should and similar expressions are forward-looking statements. Any forward-looking
statements have been prepared on the basis of a number of assumptions which may prove incorrect and
the current intentions, plans, expectations and beliefs about future events are subject to risks,
uncertainties and other factors, many of which are outside of Globe Metals & Mining Limited’s control.
Important factors that could cause actual results to differ materially from the assumptions or expectations
expressed or implied in this report include known and unknown risks. Because actual results could differ
materially to the assumptions made and the Company’s current intentions, plans, expectations and
beliefs about the future, you are urged to view all forward-looking statements with caution. This content
should not be relied upon as a recommendation or forecast by Globe Metals & Mining Limited. Content
within this report should not be construed as either an offer to sell or a solicitation of an offer to buy or
sell shares in any jurisdiction.
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
17
Competent Person’s Statement
Mineral resource estimates:
The information in this report that relates to Mineral Resources is extracted from the report titled
“Kanyika Niobium Project – Updated JORC Resource Estimate” released to the Australian Securities
Exchange (ASX) on 11 July 2018 and available to view at www.globemm.com and for which Competent
Persons’ consents were obtained. Each Competent Person’s consent remains in place for subsequent
releases by the Company of the same information in the same form and context, until the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the
information included in the original ASX announcement released on 11 July 2018 and, in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the
estimates in the original ASX announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Persons’ findings are presented
have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 titled “Kanyika Niobium
Project – Updated JORC Resource Estimate” and is available to view at www.globemm.com
Ore reserves:
The information in the report that relates to Ore Reserves is extracted from the report titled “Kanyika
Niobium Project – Project Feasibility and Economics” released to the Australian Securities Exchange
(ASX) on 19 August 2021 and available to view at www.globemm.com and for which a Competent
Person’s consent was obtained. The Competent Person’s consent remains in place for subsequent
releases by the Company of the same information in the same form and context, until the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the
information included in the original ASX announcement released on 19 August 2021 and, in the case of
estimates of Ore Reserves, that all material assumptions and technical parameters underpinning the
estimates in the original ASX announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings are presented
have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 19 August 2021 titled “Kanyika Niobium
Project – Project Feasibility and Economics” and is available to view at www.globemm.com
Production target and forecast financial information:
The production target and forecast financial information derived from the production target included in
this presentation were first announced to the ASX in the announcement released to the ASX on 19
August 2021 titled “Kanyika Niobium Project – Project Feasibility and Economics”. Globe confirms that all
the material assumptions underpinning the production target and the forecast financial information
derived from the production target as reported to the ASX on 19 August 2021 continue to apply and have
not materially changed.
Full details are contained in the ASX announcement released on 19 August 2021 titled “Kanyika Niobium
Project – Project Feasibility and Economics” and is available to view at www.globemm.com
Globe Metals & Mining Limited Annual Report for the year ended 30 June 2023
Annual Financial Report
For the year ended
30 June 2023
18
DIRECTORS’ REPORT
FOR THE YEAR ENDED
30 JUNE 2023
The directors of Globe Metals & Mining Limited (‘Globe’ or ‘the Company’) hereby submit their report of the Company and its
controlled entities (‘the Group’) for the financial ye