Investor Presentation
Released
Released
Announcement PDF
Niobium.
Critical for safe, ultra
fast battery charging.
August 2023
Grant Hudson
Chief Executive Officer
Charles Altshuler
Chief Financial Officer
ASX: GBE | globemm.com
Disclaimer
This Presentation has been prepared by Globe Metals & Mining Limited ABN 33 114 400 609
(Globe or the Company).
The information in this Presentation is an overview and does not contain all information necessary for
making investment decisions. In making investment decisions, investors should rely on their own
examination of the Company and the Kanyika Niobium Project and consult their own legal, technical,
business and/or financial advisers. The information contained in this Presentation has been prepared in
good faith by Globe, however no representation or warranty expressed or implied is made as to the
accuracy, correctness, completeness or adequacy of any statements, estimates, options, or other
information contained in this presentation. To the maximum extent permitted by law, Globe, its
Directors, officers, employees and agents disclaim liability for any loss or damage which may be
suffered by any person relying on anything contained in or omitted from this Presentation.
This Presentation contains certain forward-looking statements and comments about future matters.
Forward-looking statements can generally be identified using forward-looking words such as, “expect”,
“anticipate”, “likely”, “intend”, “should”, “could”, “may”, “predict”, “plan”, “propose”, “will”, “believe”,
“forecast”, “estimate”, “target” “outlook”, “continue”, “guidance” and other similar expressions. The
forward-looking statements including statements regarding our intent, belief or current expectations with
respect to Kanyika Niobium Project’s performance, market, political, social and environmental
conditions, additional feasibility work, improvements and updates, project configuration, construction
and commissioning costs and timelines, and general risks and uncertainties. Readers are cautioned not
to place reliance on these forward-looking statements. While due care has been used in the preparation
of forecast information, actual results may vary in a materially positive or negative manner.
Certain information in this Presentation may refer to the intentions of Globe with respect to the Kanyika
Niobium Project, but these are not intended to be forecasts, forward looking statements or statements
about the future matters for the purposes of the Corporations Act or any other applicable law. The
occurrence of the events in the future are subject to risk, uncertainties and other actions that may cause
Kanyika Niobium Project’s actual results, performance or achievements to be materially different from
the results, performance or achievements implied by the forward-looking statements.
Any such statements, targets, opinions and estimates in this Presentation speak only as of the date
hereof and are based on assumptions and contingencies subject to significant uncertainties or change
without notice. Forecasts and hypothetical examples are subject to uncertainty and contingencies often
outside Globe’s control. The information in this presentation is current as at the date of the publication of
this presentation.
Such factors include, but are not limited to, general economic, market and business conditions, market
prices for niobium and tantalum, demand for niobium and tantalum, niobium and tantalum supply,
obtaining additional debt and equity funding (as required), concluding of off-take agreements, obtaining
of all necessary permits for development and production as and when required, estimation of resources
and reserves, development and production costs, processing recoveries transportation delays and
costs, risks and uncertainties related to construction and commissioning, delays in construction of the
mining and processing operations, accidents, equipment breakdowns, title matters, labour disputes,
environmental issues and local community issues involving relocation of project affected people or other
unanticipated difficulties with, or interruptions in, development or production, exchange rate fluctuations,
and risks and uncertainties associated with doing business in Africa. In addition, there may be
information herein that is information about prospective results of operations, financial position or cash
flows and which is provided only to assist in an evaluation of the Kanyika Niobium Project outlined herein
but are not to be relied upon as accurate representations of future results and may not be appropriate
for any other purpose.
Niobium for safe, ultra-fast battery charging.
There can be no assurance that actual outcomes will not differ materially from these forward-looking
statements. Except as required by law or regulation (including the ASX Listing Rules), Globe undertakes
no obligation to supplement, revise or update forward-looking statements in the future, regardless of
whether new information, future events or results or other factors affect the information contained in this
Presentation.
ASX GBE |
2
What is niobium and
how is it used?
Ferroniobium (at 65% niobium) is the
primary saleable form of the metal
and sells for over US$40,000/tonne.
Construction
Ferroniobium is primarily used in the production of High
Strength Low Alloy (HSLA) steel which is used extensively
in the construction and automotive industries and in the
manufacture of high-pressure gas and oil pipelines,
providing extra strength, and greater resistance to heat
and corrosion.
Fast fact
Automotive and Transport
Aerospace and Defence
Oil & Gas
Other
Construction of the Eiffel Tower used
7,300t of wrought iron. Today, it could
be built using 2,000t of HSLA steel.
Global ferroniobium sales by sector1
~100,000t/year
~US$3 billion per year2
Niobium for safe, ultra-fast battery charging.
1 Source: CBMM
2 Niobium Outlook to 2030 Roskill , 2020
ASX GBE |
3
A game-changing
market opportunity
1 Source: https://www.autofutures.tv/topics/how-niobium-makes-batteries-greener--cheaper-and-cleaner---with-insights-from-a-nobel-
prize-winner--/s/7457515b-c647-434f-8877-31321e968592
2Source: World’s Leading Niobium Anode Battery Materials Supplier (echiontech.com) 2023
3 Source: https://www.global.toshiba/ww/products-solutions/battery/scib/next/nto.html
Niobium makes batteries
greener, cheaper and cleaner.1
Ultra-fast
charging
Niobium batteries can be fully charged in less than
10 minutes
at lower operating temperatures2
Increased
range
Niobium increases the energy density of batteries by
200%
at a lower material cost2
Better
performance
Niobium batteries are more stable and can withstand
10,000
charging cycles2
Niobium for safe, ultra-fast battery charging.
Toshiba’s Niobium Titanium Oxide (NTO)-SCIB battery can provide a
mileage of up to 320km, reaching 90% capacity after six minutes and
can fast charge to 80% capacity after 25,000 cycles.3
ASX GBE |
4
Niobium demand will grow
but supply is limited
1 Source: https://www.mining.com/web/niobium-mining-the-first-step-in-building-a-fighter-jet/
2 Source: https://www.mining-technology.com/projects/niobec-niobium-mine-quebec/
3 Source:
https://www.researchgate.net/publication/272424460_Niobium_oxide_mineral_flotation_A_review_of_relevant_literature_and_the_current_stat
e_of_industrial_operations
4 Source: https://cbmm.com/en
Three mines account for over
95% of the global mined
niobium supply and no new
mines have been brought into
production for over 50 years. 3
• Excessive dependence on single supplier countries makes
global consumers vulnerable.
• Niobec and Boa Vista only produce ferroniobium. Only CBMM
produces Niobium Oxide used in lithium-ion batteries.
• All three companies use the leach process together with
electric arc furnace which is a carbon intensive process with
significant slag. 3
Niobium for safe, ultra-fast battery charging.
Global production of niobium (FeNb +Nb2O5)
~112,000 tonnes per annum
Niobec Mine, Canada 2
Magris Resources
5,000tpa | 5%
Boa Vista Mine, Brazil 1
China Molybdenum
9,000tpa | 8%
CBMM Mine, Brazil 4
CBMM
92,000t | 82%
ASX GBE |
5
That’s why its at the top of
critical mineral lists
Niobium is considered
critical not just in
Australia but also in
the EU, US, Japan,
and India.
Niobium for safe, ultra-fast battery charging.
ASX GBE |
6
CBMM is dramatically increasing
niobium oxide production.
1 Source: Derived and extrapolated from reports on https://niobium.tech/, https://www.echiontech.com/, https://cbmm.com/en/
CBMM will invest U$80m on
increasing their niobium oxide
capacity from 10,000 tonnes
per annum to 45,000tpa by
2030 to serve the growing
battery market.
1
• CBMM invest in Eichion, Battery Streak, VW Brazil and
Lighting Motorcycles plus 40 other projects.
• 25% of CBMM’s sales will be for the battery market by
2023.
Niobium for safe, ultra-fast battery charging.
ASX GBE |
7
Niobium is five times
the price of copper
Currently, average niobium
oxide(Nb205) prices are1:
Niobium Oxide
25,000
•
$US41,500t for 99.5% (FOB China)
20,000
•
$US51,500t for 99.99% (FOB China)
15,000
This equates to 200% increase compared to 2001.
2
10,000
5,000
0
2023
1
Source: Daily Niobium / Tantalum price, Lme Comex Shfe Price of Niobium / Tantalum live | SMM - Metal Market
https://www.metal.com/Niobium-Tantalum
2 Source: Derived and extrapolated from reports on https://niobium.tech/, https://www.echiontech.com,
https://cbmm.com/en/ and Mordor Intelligence Industry Reports for Niobium Market
Niobium for safe, ultra-fast battery charging.
2025
Demand
2027
2030
Supply
ASX GBE |
8
Kanyika Niobium Project
Malawi, Africa
The first globally significant
niobium mine in 50 years.
Shovel-ready, fully permitted, advanced staged project covered by a
Mining Development Agreement, Mining Licence, and all
environmental and land approvals required to immediately start
construction.
By the numbers
JORC (2012) Compliant
Mineral Resource Estimate
(Measured, Indicated and Inferred)
68Mt
2,830ppm Nb2O5
Figure 1. Signing ceremony for the Mining Development Agreement
between the Globe and Malawi Government : 29 March 2023
Project Life
Phase 1 (3 years) – 340,000t/year
Phase 2 (20 years) – 1.5Mt/year
23
years
Figure 2. Sample collection at Kanyika mine site: 28 April 2023
Niobium for safe, ultra-fast battery charging.
ASX GBE |
9
Kanyika Niobium Project
Malawi, Africa
Production in Malawi.
Processing in Namibia.
• Malawi is a conflict free, democratic country underpinned by
its 2022-2027 mining strategic plan where mining will be the
main contributor to the sustainable socio-economic growth
and development of the country.
• Namibia: EIA and scoping project underway for processing
plant to convert niobium concentrate produced in Malawi to
Niobium Oxide (Nb2O5) /Metal Powders or Ferroniobium
(FeNb).
Location of the mine and process plant and route of the concentrate chosen
by GBE in consultation with C. Steinweg Group.
Niobium for safe, ultra-fast battery charging.
ASX GBE | 10
Large resource base and long mine life
The first globally significant niobium mine in 50 years.
Mineral Resources
Measured
Indicated
Inferred
Total
5.3Mt
47Mt
16Mt
68.3Mt
180ppm Ta2O5
954t Contained Ta2O5
135ppm Ta2O5
6,345t Contained Ta2O5
120ppm Ta2O5
1,920t Contained Ta2O5
135ppm Ta2O5
9,219t Contained Ta2O5
Proved
Probable
Total
• Contains pyrochlore and zircon
mineralisation in disseminated zones
5.3Mt
28.5Mt
33.8Mt
• Niobium and tantalum mineralisation occurs
within the mineral pyrochlore
171ppm Ta2O5
906t Contained Ta2O5
136ppm Ta2O5
3,876t Contained Ta2O5
141ppm Ta2O5
4,782t Contained Ta2O5
3,770ppm Nb2O5
19,981t Contained Nb2O5
2,860ppm Nb2O5
134,420t Contained Nb2O5
2,430ppm Nb2O5
38,880t Contained Nb2O5
2,830ppm Nb2O5
193,281t Contained Nb2O5
Ore Reserves
3,680ppm Nb2O5
19,504t Contained Nb2O5
2,930ppm Nb2O5
83,505t Contained Nb2O5
3,048ppm Nb2O5
103,009t Contained Nb2O5
Niobium for safe, ultra-fast battery charging.
• High-grade mineralisation features
pyrochlore bands associated with zircon
ASX GBE | 11
Development plan
Decision to mine
First ore
Full-scale
Capital Raise 1
Capital Raise 2
Capital Raise 3
Approx. A$8m
March 2023 >
Feasibility Study
H1 2024
Decision to mine
US$70m
Based on internal 2021
feasibility study estimates
US$250m
H1 2024 >
Phase 1 Mine and
Processing Plant
Q4 2024
First ore
November 2027
Phase 2 full-scale plant
Mine concentrate
Phase Two costing an estimated
US$250m (without considering the
contribution from phase one) comprises
2021 Definitive
Mine concentrate
of 11.900 tpa of Kanyika concentrate as
mine output producing Feasibility
3,250 tpa ofStudy to
niobium oxide through be
the updated
Namibia and
refinery.
re-costed for
Based on internal 2021
feasibility study estimates
•
Finalise the Phase One design and to establish confident cost
estimates for capital and operating expenses
Production of product samples from ore bulk sample from 10t ore
sample collected for offtake evaluation.
Globe expects the feasibility study for Phase One in Q1 2024 at
which time Globe will evaluate the Final Decision To Mine (or
not).
Demonstrate its ability to
mine, concentrate, refine
and sell niobium products.
Additional funding might
be required in the first half
of 2024 (including entering
into potential offtake
agreements) to proceed
with Phase One
Niobium for safe, ultra-fast battery charging.
3,600tpa
11,900tpa
Phase 2 plant.
Niobium oxide
720tpa
Niobium oxide
3,250tpa
The above dates are indicative goals only and are subject to change, depending on the
outcome of additional feasibility work.
ASX GBE | 12
Phase One
Scaleable start-up operations
Kanyika mine site: Phase One- 340,000 tons of ore (190,000) and waste mined per annum at 25tph
>
>
>
>
>
>
Open pit mining
Crushing
Milling
Flotation
Drying
Concentrate
Sale and trucking
“Free dig” mining
Primary jaw and
secondary cone
EDS mill
Single stage:
Rougher, scavenger and
cleaners
Locally produced
biomass as fuel
Contains radioactive nuclides
Bulk bags loaded
onto flat bed trucks
Load and haul
Ball mill
Namibia refinery: Phase One- 740 tons of Niobium Oxide per annum
>
Salt (NaCl):
Electrolysis of salt to
produce chlorine
+
Concentrate and
chlorine gas:
Chlorine is recycled from oxidation and
reduction
>
>
>
Chlorination reactor:
Distillation and purification:
Metals converted to gaseous chlorides at
high temperature
Very high purity >99% achievable
in batch distillation
Selective cooling gives primary separation
of metal chlorides
Niobium for safe, ultra-fast battery charging.
High grade niobium (and other)
metal oxides and powders:
Regenerated chlorine is
recycled back to the chlorinator
Disclaimer: The above processes are subject to the completion of additional feasibility work,
which is expected to be completed in or around the first quarter of 2024.
ASX GBE | 13
Phase One Metrics
Small scale ramping up to large scale
All quoted in USD
Production (Nb2O5)
Production (Ta2O5)
Kanyika concentrate IRR
3 years
3 years
3 years
720tpa
32tpa
3.6ktpa
>97% recovery | >99% product
>96% recovery | >99.9% product
90% concentrator availability
Operating costs
NPV
3 years
3 years
3 years
45%
$11m
$90m
Average per year
LOM| 8% discount rate
Total Revenue
Total Opex
Total EBITDA
Capital costs
Capital costs
Capital costs
3 years
3 years
3 years
Phase 1 Mine Capital Cost
Phase 1 Refinery Capital Cost
Phase 1 Sustaining Capital
$108m
$32m
$65m
$35m
$25m
$10m
Total over 3 years
Total over 3 years
Total over 3 years
3 years
Disclaimer and clarifier: The information, reports, financial models, forecasts and strategies are based on the feasibility study “Kanyika Project Feasibility” announced on 19 August 2021
(https://announcements.asx.com.au/asxpdf/20210819/pdf/44zgwl83w5s55b.pdf) This feasibility study not been updated since 19 August 2021 and hence has not considered potential changes in commodity prices, competition, foreign exchange,
labour costs and shortages, logistics, capital costs and other economic conditions. Production targets are dependent on obtaining offtake agreements to the full value of the production target. For changes to the feasibility study refer to slide 16.
Whilst the feasibility study has not been updated for the aforementioned macro-economic changes and, subject to additional feasibility work, the changes detailed on slide 16, as at the date of this Presentation, Globe confirms that all the material
assumptions underpinning the feasibility Study (and the production target included in the feasibility study and forecast financial information derived from the production target included the feasibility study) as reported to the ASX on 19 August
2021 continue to apply and have not materially changed.
Niobium for safe, ultra-fast battery charging.
ASX GBE | 14
Life Of Mine Metrics
1.5 years payback post first production
All quoted in USD
Production (Nb2O5)
Production (Ta2O5)
Kanyika concentrate IRR
23 years
23 years
23 years
3,250tpa
140tpa
11.9ktpa
>95% recovery | >99.9% product
>95% recovery | >99.9% product
90% concentrator availability
Operating costs
NPV
23 years
23 years
23 years
50%
$88m
$1bn
Average per year
LOM| 8% discount rate
Total Revenue
Total Opex
Total EBITDA
Capital costs
Capital costs
Capital costs
23 years
23 years
23 years
Mine Capital Cost
Refinery Capital Cost
Sustaining Capital
$5.6bn
$1.6bn
$3.7bn
$200m
$50m
$100m
LOM
LOM
LOM
LOM
Disclaimer and clarifier: The information, reports, financial models, forecasts and strategies are based on the feasibility study “Kanyika Project Feasibility” announced on 19 August 2021
(https://announcements.asx.com.au/asxpdf/20210819/pdf/44zgwl83w5s55b.pdf) This feasibility study not been updated since 19 August 2021 and hence has not considered potential changes in commodity prices, competition, foreign exchange,
labour costs and shortages, logistics, capital costs and other economic conditions. Production targets are dependent on obtaining offtake agreements to the full value of the production target. For changes to the feasibility study refer to slide 16.
Whilst the feasibility study has not been updated for the above noted macro-economic changes and, subject to additional feasibility work, the changes detailed on slide 16, as at the date of this Presentation, Globe confirms that all the material
assumptions underpinning the feasibility Study (and the production target included in the feasibility study and forecast financial information derived from the production target included the feasibility study) as reported to the ASX on 19 August
2021 continue to apply and have not materially changed.
Niobium for safe, ultra-fast battery charging.
ASX GBE | 15
Processing improvements
to the original feasibility completed in August 2021
All quoted in USD
Concentrator
Refinery
Original
Original
Original
Original
2-stage
flotation
12 flotation
reagents
Dual water
circuit
Jaw crusher
SAG mill
Ball mill combination
Hydrofluoric
Sulphuric Acid Leach with
Ammonia precipitation
New
New
New
New
1-stage
flotation
4 flotation
reagents
Single common
water circuit
Jaw crusher
Cone crusher
EDS multishaft mill
Ball mill combination
Chlorination with
chlorine recycle
Savings
Savings
Savings
Savings
$2 million less
CAPEX
$3 million less
OPEX/year
$1.3m less OPEX/year
due to less electricity usage
$2.1m less OPEX/year
due to 20% reduction in ore
arriving at concentrator.
$1m less CAPEX
$7million less
OPEX/year
minimum
1
1
2
Disclaimer and clarifier: The above improvement updates have not been verified and are
subject to the completion of additional feasibility work, which is expected to be completed in or
around the first quarter of 2024.
Niobium for safe, ultra-fast battery charging.
ASX GBE | 16
Near-term value drivers
March 2023
September 2023
November 2023
Signing of MDA
Complete advanced sample test-work
Namibia EIA
• Signing of Mining Development Agreement
on Kanyika Project
• Milling through EDS mill
• Plant emission and residues data collected
• Gravity volume reduction
• Location data collected
Produce concentrate
• Detailed EIA studies initiated.
• Flotation
Product samples
• Chlorination
• Provided to potential offtake partners for analysis
• Oxide sample production
• Update engineering design parameters
August 2023
October 2023
Capital raising
Q1 2024
Commissioning of lab scale refinery pilot
plant
Update preliminary feasibility study
• Allow to confirm design parameters on full scale
plant
• Current Feasibility Study to be revised and
financial model updated
• Enable production of offtakes samples
• Establish confident cost estimates for capital
expenditure and operating expenses for Phase
One Process Plant.
• For a pro-rata non-renounceable entitlement issue
• Issue price of $0.037 per new Share (New
Shares) on the basis of three (3) New Shares for
every seven (7)
• To raise up to approximately $8,000,000 before
expenses.
• Irrevocable commitments from the major
shareholders on full Entitlements totally $4.3m.
• Detail Design for selected long lead items.
• Irrevocable commitment from Triple Talent to
apply for $1.3 million in Additional New Shares (if
available) under the Top Up Facility
Niobium for safe, ultra-fast battery charging.
The above dates are indicative goals only and are subject to change, depending on the
outcome of additional feasibility work..
ASX GBE | 17
Corporate snapshot
ASX GBE
Shares on issue
Cash
Various options
A$35.0m A$1.2m
506.7m
A$0.2m
22m
1 August 2023
1 August 2023
30 June 2023
1 August 2023
Share price
Market capitalisation
$A0.069
1 August 2023
Debt
30 June 2023
52 week high $0.11, low $0.047
ASX Share price performance ($A)
Share register
12 months to 1 August 2023
Figures shown are approximate as at 1 August 2023
Triple Talent Enterprise
4.8%
AO Zhong
International
Minerals
23.3%
Niobium for safe, ultra-fast battery charging.
Retail Others
23.4%
Apollo Metals
Investment
48.5%
ASX GBE | 18
Appendices
Niobium for safe, ultra-fast battery charging.
ASX GBE | 19
Competent person’s
statement
Mineral resource estimates:
Ore reserves:
The information in this report that relates to Mineral Resources is extracted from the report titled
“Kanyika Niobium Project – Updated JORC Resource Estimate” released to the Australian Securities
Exchange (ASX) on 11 July 2018 and available to view at www.globemm.com and for which Competent
Persons’ consents were obtained. Each Competent Person’s consent remains in place for subsequent
releases by the Company of the same information in the same form and context, until the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The information in the report that relates to Ore Reserves is extracted from the report titled “Kanyika
Niobium Project – Project Feasibility and Economics” released to the Australian Securities Exchange
(ASX) on 19 August 2021 and available to view at www.globemm.com and for which a Competent
Person’s consent was obtained. The Competent Person’s consent remains in place for subsequent
releases by the Company of the same information in the same form and context, until the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the
information included in the original ASX announcement released on 11 July 2018 and, in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters underpinning
the estimates in the original ASX announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Persons’ findings are presented
have not been materially modified from the original ASX announcement.
The Company confirms that is not aware of any new information or data that materially affects the
information included in the original ASX announcement released on 19 August 2021 and, in the case of
estimates of Ore Reserves, that all material assumptions and technical parameters underpinning the
estimates in the original ASX announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings are presented
have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 titled “Kanyika Niobium
Project – Updated JORC Resource Estimate” and is available to view at www.globemm.com
Full details are contained in the ASX announcement released on 19 August 2021 titled “Kanyika
Niobium Project – Project Feasibility and Economics” and is available to view at www.globemm.com
Production target and forecast financial information:
The production target and forecast financial information derived from the production target included in this presentation were first announced to the ASX in the announcement released to the
ASX on 19 August 2021 titled “Kanyika Niobium Project – Project Feasibility and Economics”. Globe confirms that all the material assumptions underpinning the production target and the
forecast financial information derived from the production target as reported to the ASX on 19 August 2021 continue to apply and have not materially changed.
Full details are contained in the ASX announcement released on 19 August 2021 titled “Kanyika Niobium Project – Project Feasibility and Economics” and is available to view at
www.globemm.com
Niobium for safe, ultra-fast battery charging.
ASX GBE | 20
Strong internal ESG Drivers (in addition to Niobium
making batteries greener, cheaper and cleaner and hence supporting climate change)
Environment
Social
Social and
Labour Plan
• A percentage of
turnover will be
spent on
projects with
qualified
communities
within a 20km
radius from the
mine
• Training of
artisans and
other disciplines
will draw
trainees from
the Kanyika
environment
Irrigation water
• Globe will build
a dam to divert
the river around
the orebody and
for freshwater
storage
• Raising the dam
wall will retain
additional water
that will be
made available
as irrigation
water to local
communities
Growing biomass
for purchase by
Globe 1
• Globe will
contract to buy
suitable
biomass as a
fossil fuel
replacement in
the mining and
plant operations
• This will provide
a cash crop to
the local
community
• Being able to
grow two crops
per year is a
significant
income
improvement
Biogas from
biomass 1
• The biomass
purchased from
the community
will be
anaerobically
digested to
produce biogas
• Biogas will be
used to dry
concentrate
• Biogas will be
upgraded to
biomethane
• Biomethane will
replace 60% of
the diesel in the
mining fleet
Solar PV with
battery storage
plus Hydro
power 2
• Solar power will
provide power
to the plant and
charge the
battery during
daylight
• The battery will
be recharged at
night from grid
hydropower
(98% of Malawi
grid is hydro) 3
• Globe will install
a run-of-river
hydro generator
that will operate
during the rainy
season
Production
optimisation
• Move from two
stage flotation
to single stage
•
Reduction
from 12
reagents to 4
•
Single water
circuit
• Move from
SAG/ball mills to
EDS /spiral/ball
mill
•
Early gangue
rejection
•
Reduced
power
consumption
•
Lower
flotation
throughput
Regenerative
chlorination
process
•
The
chlorination
process
regenerates
and recycles
chlorine
•
Very low
residue
volumes
remain
•
Dry process
means no
effluent water
produced
1 Source: Feasibility of Biogas Production from Napier Grass, The 6th International Conference on Applied Energy – ICAE2014, Vanatpornratt Sawasdeea and Nipon Pisutpaisal, www.sciencedirect.com
2 Source: https://www.angloamerican.com/media/press-releases/2022/18-03-2022
3 Source: Taulo, John L, Gondwe, Kenneth Joseph, & Sebitosi, Adoniya Ben. (2015). Energy supply in Malawi: Options and issues. Journal of Energy in Southern Africa, 26(2), 19-32. Retrieved August 01, 2023,
from http://www.scielo.org.za/scielo.php
ASX: GBE 21
Our partners
Significant experience civils, technology, refining and logistics. Minimizing logistics,
mineral processing and production technology risk.
Mine Civils
Milling Technology
Mine Plant
Logistics
Refining Technology
S.R. Nicholas Ltd
provide the preliminary
design and civil
engineering of the plant
for Phase 1 of the
project.
EDS has been
developing a
horizontal, multi-shaft
mill that has a
significantly lowered
power consumption
than the equivalent
SAG ball mill since
2016.
Solo has a wealth of
experience in the
design, build and
commissioning of
mineral plants in
South Africa, and
have supplied such
installations all over
the Continent.
Selected to design
and construct the
mineral processing
plant.
C. Steinweg Group is a
globally operating
independent, worldwide
logistics service provider.
They operate in the fields
of storage, handling,
forwarding, chartering
and other commodity
related logistics services.
C. Steinweg Group has
over 5000 employees
located across 100
locations in 52 countries.
They are well-known in
the region and are the
largest logistics company
in Malawi with 5 sites
and an additional office
in Namibia.
TCM has been selected to Geolabs Global is the
design the refinery
laboratory that will
process for the Kanyika
process the Kanyika
concentrate and to
bulk sample ore to
determine the design
concentrate. Geolabs
parameters of the refinery.
Global is a leading
TCM has worked with
more than ten different ore provider of mineral
concentrates that contain processing solutions for
niobium and tantalum. In the mining and minerals
industry based in South
addition, they have
processed concentrates
Africa.
containing PGMs, Rare
Earths, gold, tin, vanadium
a
Share your feedback
Discover