Globe Metals & Mining Limited (ASX:GBE, G4U:FWB) Investor presentation April 2026
DISCLAIMER
An emerging vertically - integrated niobium producer
ASX: GBE |
For details on the assumptions used, Competent Persons’ statements, JORC Table 1 disclosures,
and the risks associated with the Bankable Feasibility Study, please refer to the ASX
announcement dated 1 April 2026 entitled “Kanyika BFS Confirms Strong Project Economics.”
Forward looking statements
Some of the statements contained in this announcement are forward-looking statements.
Forward looking statements include, but are not limited to, statements concerning estimates of
tonnages, grades, expected costs, capital requirements, production targets, development
timelines and statements relating to the continued advancement of Globe Metals & Mining
Limited’s projects, including the Kanyika Niobium Project, and other statements that are not
historical facts. When used in this report, and on other published information of Globe Metals &
Mining Limited, words such as “aim”, “anticipate”, “believe”, “could”, “estimate”, “expect”,
“intend”, “may”, “plan”, “potential”, “should” and similar expressions are forward-looking
statements.
Although Globe Metals & Mining Limited believes that the expectations reflected in these
forward-looking statements are reasonable, such statements involve known and unknown risks,
uncertainties and other factors, and no assurance can be given that actual results will be
consistent with these forward-looking statements. Various factors could cause actual results to
differ materially from these forward-looking statements, including but not limited to technical,
geological, metallurgical or mechanical issues, variations in niobium or tantalum prices, changes
in market conditions, funding availability, regulatory approvals, operating conditions, and other
risks that may affect the development of the Company’s projects.
The forward-looking statements are based on information available to the Company as at the
date of this announcement. Except as required by law or regulation (including the ASX Listing
Rules), none of the Company, its representatives or advisers undertakes any obligation to
provide any additional or updated information whether as a result of a change in expectations or
assumptions, new information, future events or results or otherwise.
Globe is pleased to report this summary of the BFS in a fair and balanced manner and believes
that it has reasonable grounds for making the forward-looking statements in this
announcement, including with respect to any mining of mineralised material, modifying factors,
production targets and operating cost estimates. This announcement has been compiled by
Globe Metals & Mining Limited from information provided by the various contributors to the
study and supporting materials.
ASX Chapter 5 Compliance and Cautionary Statement
The overall production targets and forecast financial information, derived from the production target
referred to in this announcement, is based on the BFS. The BFS referred to in this announcement is
based upon the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves, 2012 Edition (“JORC Code, 2012”).
Compliant Mineral Resource estimate, dated 11th July 2018, independently prepared by BMGS Pty
Ltd. The Mineral Resource estimate is described in detail in the latest Resource estimate (refer to
ASX announcement of 11th July 2018: Kanyika Niobium Project – Updated JORC Resource Estimate).
The Ore Reserve comprised of 15% Proved and 85% Probable Ore Reserves categories, has been
used to produce the LOM plan constrained within the optimised mine design and has been
independently prepared by the Competent Person at Orelogy. The production targets are based on
33.8mt derived from the proved and probable ore reserves as explained above.
The Company has concluded that it has a reasonable basis for providing the forward-looking
statements and forecast financial information included in this announcement. All material
assumptions, including modifying factors, processing recoveries, pricing, capital and operating cost
estimates, and development timelines are disclosed within the BFS. Not all these assumptions are
within the Company’s control and are subject to change from time to time. Changes in such
assumptions may have a material impact on economic outcomes.
ASX Listing Rule 5.16 and 5.17 requirements. The material assumptions on which the production
target for the Project and the forecast financial information derived therefrom are based are detailed
in the appendix. The production target is based on Probable and Proven Ore Reserves that have
been prepared by Competent Persons in accordance with the requirements of the JORC Code
(2012). Mineral Resources and Ore Reserves reported within and in-line with requirements of ASX
Listing Rule 5.9.1.
The Company confirms that all material assumptions underpinning the BFS continue to apply and
have not materially changed.
This presentation was authorised for release by the Interim CEO of Globe Metals & Mining Limited.
2
THE ASSET: KANYIKA NIOBIUM PROJECT
A LARGE-SCALE, LONG-LIFE CRITICAL MINERALS
DEVELOPMENT
An emerging vertically - integrated niobium producer
ASX: GBE |
Fully permitted niobium + tantalum project in Malawi
Mining Licence + MDA + Community Development
Agreement (CDA) in place
Integrated mine →concentrator →refinery (on-site
high-purity products)
~24–25 year mine life with scalable production profile
Conventional open pit mining
Proven processing flowsheet (~80% recoveries)
Hybrid power solution (solar + battery + diesel backup)
Established infrastructure: water, logistics, site access
BFS-level engineering completed
Defined execution pathway
Target first production: Q1 2028
3
THE OPPORTUNITY:
STRATEGIC EXPOSURE TO A CONSTRAINED, HIGH-
VALUE MARKET
An emerging vertically - integrated niobium producer
ASX: GBE |
~90% of supply from Brazil →high concentration risk
US/EU fully import dependent →security of supply
critical
Demand driven by AI, aerospace, defence &
advanced manufacturing
Conflict-free, traceable and diversified supply source
Full value-chain integration →margin advantage
Phased development →lower capital risk + earlier cash
flow
Clear path to execution with Active funding, EPCM and
offtake discussions
Strong underlying economics (BFS)
Post-tax NPV: ~US$1.0bn | IRR: ~48%
Low-cost operation: ~US$14/kg Nb₂O₅ (bottom
quartile)
Target FID: 2026 →Production: Q1 2028
4
BFS, RESOURCES, RESERVES &
KEY METRICS
An emerging vertically - integrated niobium producer
ASX: GBE |
The Bankable Feasibility Study
confirms Kanyika as a high-
margin, low-cost, long-life
critical minerals project with
strong financial returns and a
clear development pathway.
Resources & Reserves
Mineral Resource: 68.3 Mt
@ ~0.28% Nb₂O₅
Ore Reserve: 33.8 Mt @
~0.30% Nb₂O₅ (~142 ppm
Ta₂O₅)
Mine life: ~24 years
Production Profile
LOM Nb₂O₅ production:
~79,500 tonnes
LOM Ta₂O₅ production:
~3,500 tonnes
Full scale production:
~3,000–3,300 tpa Nb₂O₅
and Ta₂O₅ output
Revenue & Margin Profile
LOM revenue: ~US$7.5
billion
Net revenue: ~US$6.98
billion
Gross margin: ~72%
(~US$5.06 billion)
Nb 0 : ~US$78.20/kg (CIF
China)
2 5
Ta 0 : ~US$264.58/kg (CIF
China)
2 5
EBITDA & Cash Flow
EBITDA: ~US$205 million
per annum
LOM EBITDA: ~US$4.9
billion
Free cash flow: ~US$2.9
billion
Cost Structure
Gross cost: ~US$25.67/kg
By-product credit (Ta₂O₅):
~US$11.41/kg
Net cost: ~US$14.26/kg
Positioned in lowest global
cost quartile
Capital Costs
Initial capex: ~US$139
million
Expansion capex: ~US$253
million
Total capex: ~US$392
million
Economics
NPV₈: ~US$1.0 billion
IRR: ~48%
Payback: ~3 years
(refer to ASX announcement dated 1 April 2026)
5
Niobium and tantalum are critical minerals
underpinning:
o Aerospace & defence systems
o Electric vehicles & energy storage
o Semiconductors & electronics
o Optical systems & imaging technologies
o Chemical processing & industrial infrastructure
o AI and datacentres
Unique properties:
o High strength-to-weight ratio
o Extreme heat and corrosion resistance
o Superior electrical performance and
stability
o Fast-charging and long-life battery
capabilities
Applications span:
o Jet engines,
rockets, satellites
o EV batteries and
grid storage
o Capacitors and
semiconductors
o Optical lenses,
sensors and AI
systems
o High-performance
industrial equipment
MRI Optical Glass Aerospace Super
Conductor
Nuclear SMR Thermo Power Batteries Capacitors
NIOBIUM & TANTALUM: CRITICAL MATERIALS
FOR ADVANCED TECHNOLOGIES
An emerging vertically - integrated niobium producer
ASX: GBE |
Use Cases for Niobium
6
Stable, transparent jurisdiction
Economist’s “Country of the Year” (2020)
Independent Mining Regulatory Authority
Strong gov’t support: MDA, EPZ tax incentives,
Presidential Delivery Unit
Existing infrastructure: grid power, paved roads,
water, skilled workforce
Youthful, educated population →operational talent
Strategic location: access to regional trade routes &
ports
New production sources outside traditionally
dominant regions →diversified global supply chains
Over AUD 300 million has been invested in three
other Malawian projects in rare earths, uranium,
and rutile over the past two months
KANYIKA NIOBIUM PROJECT
MALAWI, AFRICA
An emerging vertically - integrated niobium producer
ASX: GBE |
Kanyika Niobium
Project, comprising
both the Mine Site
and HF/SX Refinery
Election outcome:
Democratic Progressive Party (DPP) wins 2025
election with Peter Mutharika declared new
President
National context:
Leadership change at a pivotal time for mining
& industry and mining positioned as central to
Malawi’s development goals
Key Policy Directions (DPP Manifesto):
Mining designated as strategic sector. Policy to
ring-fence critical minerals under state
ownership and ban raw exports of graphite and
rare earth elements to ensure local
beneficiation. Major infrastructure investments
planned in transport and energy as part of
broader industrialization agenda.
Expansion of Special Economic Zones (SEZs) &
Export Processing Zones (EPZs)
Incentives, infrastructure, and stability for
integrated mine-to-refinery projects
1,500 MW new power capacity by 2030 →
supporting industries, communities,
andmines- all Hydro
7
Hydro and solar power
⟶ reduced emissions
Independent ESG
audits →global
standards
GLOBE’S COMMITMENT TO
ESG PRACTICES & POLICIES
An emerging vertically - integrated niobium producer
ASX: GBE |
A prerequisite for project funding
“Green niobium” vision
from day one
Dry stack tailings & land
management →minimal,
relatively environmentally
stable impact as opposed
to the traditional method of
impounding wet slurry
Community Development
Agreement →Kanyika
Development Trust
Funds: education,
healthcare, infrastructure
Local empowerment:
Malawians in leadership &
governance
Traceability →EU & U.S.
conflict-free compliance
Globe’s niobium
oxide product
meets specialty
metal sector
demands, caters to
the emerging
energy transition
market, and is non-
radioactive.
8
Globe’s niobium
oxide product
meets specialty
metal sector
demands, caters to
the emerging
energy transition
market, and is non-
radioactive.
Shareholder Number held % of total shares issued
APOLLO METALS INVESTMENT COMPANY LIMITED 351,405,158 37.47
AVOCADO TRADING LIMITED 136,500,000 14.55
TRIPLE TALENT ENTERPRISES LTD 125,621,035 13.39
AO-ZHOGN INTERNATIONAL MINERAL RESOURCES PTY LTD 118,143,062 12.6
SUITABLE PIONEER LIMITED 33,500,000 3.57
CORPORATE OVERVIEW
An emerging vertically - integrated niobium producer
ASX: GBE |
Top 5 Holders at 31 March 2026
9
MARKET
10
STRONG MARKET FUNDAMENTALS:
SUPPLY CONSTRAINTS & PRICING POWER
CONSTRAINED SUPPLY MEETS STRUCTURAL
DEMAND GROWTH
An emerging vertically - integrated niobium producer
ASX: GBE |
Supply concentration:
>90% of niobium supply from Brazil & Canada
Limited new projects globally →structural supply tightness
Tantalum market:
Supply constrained by:
geopolitical instability (Central Africa)
regulatory and ESG pressures
Pricing outlook:
Niobium pentoxide:
US$43/kg (2019) →~US$102/kg (2035)
Tantalum pentoxide:
Expected to rise to ~US$340/kg by 2035
Cost pressures:
Energy, reagents (e.g. HF), logistics and inflation
Environmental and regulatory constraints
11
DEMAND GROWTH: MULTI-SECTOR
EXPANSION DRIVING LONG-TERM UPSIDE
An emerging vertically - integrated niobium producer
ASX: GBE |
Diversified Demand Across
High-Growth Global
Industries
Niobium pentoxide demand:
o Forecast to quadruple to
~30,000t by 2035
o Critically ranked
Number 2 of 35 on the
US Critical metal list
Key demand segments:
Metallurgy / Superalloys (~52%)
Aerospace, turbines, industrial
infrastructure
Optical & Advanced Materials (~17%)
Cameras, sensors, AR/VR,
autonomous systems
Electronics & Capacitors (~16%)
Semiconductors,
telecommunications, AI hardware
Emerging applications (~14%)
Batteries, catalysts, hydrogen and
green energy
Geographic growth
drivers:
China, U.S., Japan, South
Korea, India:
o Leading demand across:
electronics
aerospace
defence
clean energy
12
PRODUCT
SPECIFICATIONS
An emerging vertically - integrated niobium producer
ASX: GBE |
Nb₂O₅:
99.986%
Impurities:
Ta <10 ppm, Fe <10 ppm, Ca <15 ppm, Si <10 ppm, Al
<10 ppm,
Na <15 ppm, Mg <10 ppm, P <10 ppm, W <10 ppm, Ti
<10 ppm,
Co <3 ppm, S <15 ppm, Sb <3 ppm, B <1 ppm
Average particle size: ~25 µm
Ta₂O₅:
99.995%
Impurities:
Nb <10 ppm, Fe <1 ppm, Ca <10 ppm, Si <10 ppm, Al <1
ppm,
Na <15 ppm, Mg <7 ppm, P <10 ppm, W <10 ppm, Ti <2
ppm,
Co <3 ppm, S <15 ppm, Sb <5 ppm, B <1 ppm
Average particle size: ~45 µm
13
An emerging vertically - integrated niobium producer
ASX: GBE |
NIOBIUM OXIDE MARKET (VOLUME IN TONS & PRICES
IN USD)
2019-2035
Price Scenarios for Nb2O5 99,9 % (%) – 2019 - 2035
Source: Mordor Intelligence Source: Mordor Intelligence
14
PROJECT DEVELOPMENT
STRATEGY
An emerging vertically - integrated niobium producer
ASX: GBE |
Phased development to reduce upfront capital and execution risk:
Expansion to full scale:
Targeted production ~3,477 tpa
Nb₂O₅ (plus ~ 156 tpa Ta₂O₅),
subject to market conditions
Equivalent to ~1,500kt of ore
mined and processed per
annum ~100% of full run of
mine (ROM) capacity
Objectives are to minimise
upfront capital, accelerate first
production, de-risk technically,
operationally and commercially,
and generate early cash flow
Initial phase:
Targeted production ~1,502 tpa of
Nb₂O₅ (plus ~65 tpa Ta₂O₅)
Equivalent to ~500kt of ore
mined and processed per
annum ~33% of full run of
mine (ROM) capacity
15
DEVELOPMENT
TIMELINE
An emerging vertically - integrated niobium producer
ASX: GBE |
Q1 2027 TO Q3 2027
Major construction
activities (civil works,
structural steel erection,
plant installation, tailings
storage facility, power
infrastructure); pre-strip
and initial ore exposure.
Q4 2026
Mobilise contractors and
site teams and commence
initial phase site works
(site establishment, access
roads, camp construction,
water supply and
temporary power).
Q3 2026
Target Final Investment
Decision (FID); execute
initial funding and EPCM
contracts; commence
long-lead procurement,
commence relocation of
affected households in
the initial phase.
CALENDAR Q2 2026
Continue project evaluation and
advance funding, offtake and
EPCM negotiations. Complete the
remaining BFS finalisation tasks
and progress early development
works. Complete technical and
commercial framework required
for development.
16
DEVELOPMENT
TIMELINE
An emerging vertically - integrated niobium producer
ASX: GBE |
Q2 2028 – 2030
Expansion phase construction to
reach full capacity; full-scale
operations expected in early
2030 (depending on market
conditions).
Q1 2028
First production and initial
revenues; target positive
operating cash flow as the
initial phase reaches steady
state.
Q4 2027
Mechanical completion
of major circuits;
commissioning
preparations.
17
BOARD OF DIRECTORS &
MANAGEMENT
An emerging vertically - integrated niobium producer
ASX: GBE |
Alice Wong
Non-Executive Chair
Extensive investment banking
experience (Morgan Stanley, ABN
AMRO Rothschild, BNP Paribas), with a
strong track record in capital raising,
structuring, and accessing Asian
institutional investors.
Bo Tan
Non-Executive Director
Deep cross-border investment and
capital structuring experience (Bohai,
Lehman Brothers, Macquarie), with
direct financial support and strategic
backing provided to the Company over
the past four years.
Ricky Lau
Non-Executive Director
Managing Partner of Crane Capital,
with significant private equity and fund
management experience, including
capital deployment and investor
network access across Asia.
Michael Barrett
Non-Executive Director
Former Rio Tinto CFO (US energy), with
experience overseeing large-scale
project funding, capital allocation, and
financial governance in global mining
operations.
Michael Choi
Non-Executive Director
Former Assistant Minister for Mines
and Energy in Queensland, with
experience in project development,
government engagement, and
facilitating resource sector investment
and approvals.
18
EXECUTIVE MANAGEMENT &
TECHNICAL LEADERSHIP
An emerging vertically - integrated niobium producer
ASX: GBE |
Charles Altshuler
Interim Chief Executive Officer
& Chief Financial Officer
Extensive experience in mining finance, project
development, and capital markets, with a
strong track record in funding and advancing
resource projects. Background includes Anglo
American plc, Glencore plc, and Globe Metals
& Mining Limited, with expertise in financial
modelling, feasibility studies, capital allocation,
and funding structuring across multiple
commodities and jurisdictions, including
Africa.
Rex Zietsman
Chief Technical Officer
Highly experienced mining and chemical
engineer with over 35 years of experience
across niobium, rare earths, tantalum, and
uranium projects. Deep expertise in project
development, feasibility studies, metallurgical
processing, and execution across African
mining operations.
David Young
Chief Consultant Geologist
Over 50 years of experience in mining,
exploration, and resource evaluation,
providing senior geological oversight,
resource validation, and technical
assurance across multiple commodities
and jurisdictions.
Rogerio Pastore
Senior Marketing
Consultant
Over 25 years of experience in mining
industry commercial strategy, market
development, and global sales across
more than 50 countries, with a deep
understanding of commodity markets
and customer requirements.
Mark Gallagher
Senior Mine Manager
Over 40 years of experience in
underground and open pit mining
across multiple commodities, with
strong expertise in mine planning,
optimisation, operational execution,
and large-scale mining project
delivery.
Lisungu Chirwa
Managing Director Globe
Metals & Mining Africa
Malawi-based executive with over 15
years of experience at Globe, providing
critical in-country leadership,
government relations, permitting,
stakeholder engagement, and execution
capability, including leadership of the
Community Development Agreement.
19
Globe Metals & Mining Limited (ASX:GBE, G4U:FWB)
Investor presentation - April 2026
ABN 33 114 400 609
Join the Globe Metals & Mining Investor Hub:
https://investorhub.globemm.com/auth/signup
Follow the prompts to sign up for an Investor Hub account
Complete your account profile
Link your shareholdings if you are a current shareholder
The QR code on this page can be used to access Investor Hub
Charles Altshuler
Interim Chief Executive Officer
+61 8 6118 7240
ca@globemm.com
20
APPENDIX
21
An emerging vertically - integrated niobium producer
ASX: GBE |
BATTERY REVOLUTION
WITH NIOBIUM
Niobium oxide makes batteries greener,
cheaper and cleaner and cobalt free.
Ultra Fast
Charging
Niobium oxide batteries can be fully
charged in less than
10 minutes
at lower operating temperatures
Increased
Range
Niobium oxide increases the energy
density of batteries by
200%
at lower material cost
Better
Performance
Niobium oxide batteries are more
stable and can withstand
10,000
charging cycles
Conventional anodes (graphite) face
limits during rapid charging, leading to:
Lithium buildup on the surface
Increased risk of short circuits,
thermal runaway, and capacity fade
Niobium pentoxide starts as an
amorphous material but transforms
into a stable crystalline structure after
cycling
This structure offers multiple “parking
spaces” for lithium ions, easing their
movement into the anode
22
FREE CASH FLOW OVER LOM
An emerging vertically - integrated niobium producer
ASX: GBE |
Forecast Free Cash Flow
(1 Jan 2026 US$’m)
23
CUMULATIVE FREE CASH FLOW OVER LOM
An emerging vertically - integrated niobium producer
ASX: GBE |
Cumulative Forecast Free Cash Flow
(1 Jan 2026 US$’m)
24
EBITDA OVER LOM
An emerging vertically - integrated niobium producer
ASX: GBE |
Annual EBITDA(1)
(1 Jan 2026 US$’m)
25
ISOMETRIC VIEW SHOWING THE EIGHT PIT STAGES
An emerging vertically - integrated niobium producer
ASX: GBE |
26
TABLE OF MATERIAL MINED IN EACH STAGE
An emerging vertically - integrated niobium producer
ASX: GBE |
27
FINAL PIT OUTLINE
An emerging vertically - integrated niobium producer
ASX: GBE |
28
OVERALL MINE LAYOUT
An emerging vertically - integrated niobium producer
ASX: GBE |
29
FULLY EXPANDED CONCENTRATOR LAYOUT
An emerging vertically - integrated niobium producer
ASX: GBE |
30
CRUSHING & MILLING CIRCUIT FOR KANYIKA
An emerging vertically - integrated niobium producer
ASX: GBE |
31
PROPOSED FLOWSHEET FOR REFINERY OPERATIONS
An emerging vertically - integrated niobium producer
ASX: GBE |
32
PROPOSED PYROCHLORE FLOTATION FLOWSHEET
An emerging vertically - integrated niobium producer
ASX: GBE |
33
PROPOSED ZIRCON FLOTATION FLOWSHEET
An emerging vertically - integrated niobium producer
ASX: GBE |
34
1, 165km
An emerging vertically - integrated niobium producer
ASX: GBE |
PRODUCTS DELIVERED VIA FOB AT NACALA PORT
35
An emerging vertically - integrated niobium producer
ASX: GBE |
36
Share your feedback