Positive metallurgical testwork results achieved on
concentrate material from the Kanyika Project, with
extraction of both Niobium and Tantalum above 99%
Globe Metals & Mining Limited (ASX: GBE) (Globe or Company) is pleased to announce that it has
received positive metallurgical testwork results on the concentrate material from the Kanyika Niobium
Project (Project), with extraction of both Niobium and Tantalum above 99%.
Test work results
TCM Research Ltd (TCM) is currently conducting a metallurgical testwork program for the application of
its proprietary vapour metallurgical processes on a concentrate sample sourced from the Project.
The initial base-line test (OR1) showed 98% Niobium and 90% Tantalum extraction. Based on this
encouraging result, a series of kinetics and optimization tests were conducted. This culminated in tests
(OR12 & OR13) showing above 99% extraction for both Niobium and Tantalum.
Extraction %
Test
OR1
OR12
OR13
Nb2O5
98,1%
99,9%
99,9%
Ta2O5
89,7%
99,8%
99,8%
TiO2
99,4%
99,9%
99,9%
ZrO2
53,2%
92,7%
95,9%
The tests further demonstrate high extraction yields for other potentially marketable products, namely
Titanium and Zirconium, with extraction yields of above 99% and 96% respectively.
With an extraction of 99.9% achieved on OR13, the expectation of the engineering team is that the
overall recovery across the refinery will be 99% comparing favourably to Globe’s August 2021 feasibility
study of 95% based on the HF process.
The test results validate the decision to move from using a hydrofluoric acid and sulphuric acid-based
process with fluoride and sulphate rich wastes that need to be neutralised and disposed of to a
chlorination-based process with no such toxic waste and where chlorine is regenerated and recycled.
Globe expects that partners, off-takers and future buyers will demand a sustainable Niobium oxide
supply and the chlorination process meets that requirement. The metallurgical testwork program has
now advanced to the next stage with separation and refining tests well underway.
Process overview
The process employs a selective reductive chlorination technique, where the target metals are
volatilized and thereby removed from the host matrix. These metals can be further separated and
purified to produce individual metals or compounds. The basis of the process is the formation metal
chlorides, with differing melting and boiling point temperatures, allowing for downstream processing.
The second stage of the process involves the refining and production of saleable products. Metal
Chlorides can be separated and refined via vapour metallurgical (dry) techniques, fractional
condensation, de-sublimation, fractional distillation, chemical vapour transport and halide substitution.
The final stage of the process is where product differentiation options can be explored, with the ability
to produce a range of saleable forms: mixtures or individual; chlorides, fluorides, oxides, carbonates,
hydroxides, metals, or metal alloys and powders.
Specifically for Niobium/Tantalum concentrates where Niobium and Tantalum are usually the only
metals extracted, TCM presents the opportunity to produce commercial co-products from other
constituents in the concentrate like Titanium, Zircon, and Iron, and potentially the recovery of any rare
earth elements present.
The process has numerous intrinsic benefits, including:
•
Dry process – offering a substantial (CAPEX, OPEX, environmental) advantage over the
previously considered (HF/H2SO4) process in eliminating the infrastructure requirements and
complexity of wastewater and effluent monitoring and treatment.
•
Producing a diverse range of value-added products.
•
Revenue generating co-products limit the effects of downturns in commodity price cycles.
•
Energy – Exothermic upfront extraction process providing a substantial amount of energy for
re-utilization in other process areas (eg. concentrate drying) or for on-site power generation.
•
Smaller, more efficient, self-sustaining process plants. On-site reagent generation and recycling
substantially reduces input logistics, costs, and overall carbon footprint. Thus, offering a higher
level of internal control over Scope 1, 2 and 3 emissions.
•
Low Waste and Tailings potential – improving overall project value and acceptance, reducing
the burden of environmental bonds, remediation, and closure liabilities.
•
The technology offers superior overall ESG potential; facilitating stakeholder buy-in and
attracting appropriate investment and like-minded suppliers, service providers, clients, and end
users.
About TCM Research
TCM is headquartered in Ireland, with representation in Canada, South Africa and USA, and has been
established to develop, apply, and commercialize a suite of Vapour Metallurgy, Processing and
2
Manufacturing Technologies that are innovative, environmentally responsible, highly competitive while
adding value exponentially beyond their cost.
TCM has developed a suite of Vapour Metallurgy processing technologies for the treatment of a vast
range of materials for the recovery of metals, including Niobium, Tantalum, Iron, Titanium, Vanadium,
Tin, Tungsten, and Rare Earth Elements. The process offers the ability to produce a range of high value
products for a diverse and growing range of industries, capturing increased benefit along the supply
and value chain. The aim is to bridge the gap between the mining and manufacturing industries,
thereby reducing overall environmental impact.
Commen�ng on the test results, Globe’s CEO Grant Hudson said:
“An extrac�on of >99% is a marvellous result as we con�nue to maximise the efficiencies of our various
processes, and will have a direct, posi�ve and project-long effect on our profitability. Combined with its
superior ESG profile these outcomes con�nue to validate our decision to switch to chlorina�on
technology in our refinery and I look forward to posi�ve results from the next stage of test-work”.
Authorisation for Release
This announcement has been authorised for release by the Company’s Chief Executive Officer, Grant
Hudson.
For further information, please contact:
Grant Hudson
Chief Executive Officer
+61 8 6118 7240
gh@globemm.com
Gareth Quinn
Media and Investor Relations
+61 417 711 108
gareth@republicpr.com.au
About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the regional centre of
Kasangu and is secured by Large-Scale Mining Licence No. LML0216/21 which grants the Company security of
tenure and the right to mine niobium, tantalum, and deleterious uranium.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have defined the extent of
mineralisa�on. Structured and progressive engineering studies have resulted in the current (JORC 2012) Mineral
Resource Es�mate (refer below) and given rise to significant improvements and simplifica�ons in the process
flowsheet.
In addi�on, Globe has undertaken substan�al metallurgical op�misa�on work and commissioned the pilot plant
design work to demonstrate and further op�mise metallurgical processes. Metallurgical op�misa�ons studies
have improved recoveries from 62% in 2012 to 75% today, through novel patented metallurgical processes.
3
The Kanyika opera�ons will produce a pyrochlore mineral concentrate that contains both niobium and tantalum in
commercially valuable volumes to be shipped to a refinery for advanced processing into high purity materials.
A Mineral Resource Es�mate for the Kanyika Niobium Project under the 2012 JORC guidelines was reported to
ASX on 11 July 2018 as follows:
Table 1: MRE for KNP using a 1,500 ppm Nb2 O5 lower cut
Table 2: MRE for KNP using a 3,000 ppm Nb2 O5 lower cut
Category
Resource
(Mt)
Nb2 O5 (ppm)
Ta2 O5 (ppm)
Category
Resource
(Mt)
Nb2 O5 (ppm)
Ta2 O5 (ppm)
Measured
5.3
3,790
180
Measured
3.4
4,790
220
160
Indicated
47
2,860
135
Indicated
16.6
4,120
Inferred
16
2,430
120
Inferred
2.8
4,110
190
TOTAL
68.3
2,830
135
TOTAL
22.8
4,220
190
Mineral Resource Es�mates
The informa�on in this report that relates to Mineral Resources is extracted from the report �tled “Kanyika Niobium Project –
Updated JORC Resource Es�mate” released to the Australian Securi�es Exchange (ASX) on 11 July 2018 and available to view
at www.globemm.com and for which Competent Persons’ consents were obtained. Each Competent Person’s consent remains
in place for subsequent releases by the Company of the same informa�on in the same form and context, un�l the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new informa�on or data that materially affects the informa�on included in the
original ASX announcement released on 11 July 2018 and, in the case of es�mates of Mineral Resources, that all material
assump�ons and technical parameters underpinning the es�mates in the original ASX announcement con�nue to apply and
have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are
presented have not been materially modified from the original ASX announcement.
4
Full details are contained in the ASX announcement released on 11 July 2018 �tled “Kanyika Niobium Project – Updated JORC
Resource Es�mate” available to view at www.globemm.com.
5
Share your feedback
Discover