Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
Globe Metals & Mining Limited
ABN 33 114 400 609
ASX Code: GBE
Quarterly
Report
For the quarter ended
30 June 2023
globemm.com
An ASX-listed resources
company, Globe’s Kanyika
Niobium Project in Malawi
will produce niobium and
tantalum products for fastcharging lithium batteries and
strengthening steel.
Highlights
•
Globe continues to meet timelines and
budget for progress on critical path goals
towards development of the Kanyika
Niobium Project.
•
Both the United States and the European
Union have placed niobium on their list of
critical minerals supporting climate change.
•
Next steps and critical vendor selection for
the Kanyika Niobium Project announced.
•
Appointment of Malawi businessman Mr
Macleod G. Nyirongo as a Non-Executive
Director.
•
10-tonne sample extracted from the Kanyika
Niobium Project for Phase 1 Plant Feasibility
Study.
•
$800 000 in short-term funding received
from Director Bo Tan.
Quarter ended 30 June 2023
2
Kanyika Niobium Project
Ownership 100% | Malawi
The Kanyika Niobium Project is located in central Malawi. It is the first new niobium project globally in
50 years and will help meet the growing new demand for Niobium. Niobium is at the forefront of
numerous new-age technologies including gas and wind turbines, medical imaging, particle
accelerators, space travel, and in the manufacture of high-performance and ultra-safe, ultra-rapid
rechargeable batteries for electric vehicles.
Both the United States and the European Union have placed niobium on their list of critical minerals
supporting climate change.
During the quarter the Company made significant progress with the Kanyika Niobium Project (Project). Key
highlights include:
Critical Vendors Selected
The Company also announced 6 highly experienced vendors selected to advance the Project.
Solo has been selected to design and construct the mineral processing plant. Based in Johannesburg, Solo has a
wealth of experience in the design, build and commissioning of mineral plants in South Africa, and have supplied
such installations all over the Continent.
TCM has been selected to design the refinery process for the Kanyika concentrate and to determine the design
parameters of the refinery. In the past TCM has worked with more than 10 different ore concentrates that contain
niobium and tantalum. In addition, they have processed concentrates containing platinum group metals, rare
earths, gold, tin, vanadium and iron, tungsten, zircon and hafnium, nickel, and copper sulphides as well as low levels
of radioactive materials such as uranium, thorium, and other fission daughter products. They have also done work
for Vanadium Resources (ASX: VR8) and Orion Minerals (ASX: ORN). The advantage of the chlorination process is
the ability to convert the bulk of these metals into chlorides that can be separated and purified to high grades. The
chlorides are then oxidized to oxides and the chlorine is recycled to the reactor.
The Resonant Group will complete the engineering drawings for the refinery using these design parameters.
Resonant is a multi-disciplinary engineering business active in the metals, minerals, chemicals, oil and gas, and
infrastructure sectors. Whilst based in South Africa, Resonant is also active in the Americas, Europe, Asia, and the
Middle East.
Globe has selected Geolabs Global as the laboratory to process the Kanyika ore to concentrate. Geolabs Global is
a leading provider of mineral processing solutions for the mining and minerals industry based in South Africa.
For Phase 1 of the Project, Globe has selected Malawi-based construction company, S.R. Nicholas Ltd, to provide
the preliminary design and civil engineering of the plant.
Since 2016, EDS has been developing a horizontal, multi-shaft mill that has a significantly lowered power
consumption when compared to the equivalent SAG ball mill. The EDS mill produces -1mm crushed ore that is ideal
for gravity spiral separation and is expected to allow some gangue to be discarded prior to reaching the ball mill,
which enhances plant efficiency. In the revised flowsheet, Globe expects both capex and opex to be reduced by
about 10%. The final cost savings will be published in the revised feasibility study (refer below).
Quarter ended 30 June 2023
3
Refinery Design
The final refinery design is dependent on the current test work results which will determine the bespoke process
design criteria to be used in the final engineering drawing. Areas of focus are:
•
the discard rate of gangue from the proposed gravity spiral plant;
•
determining the size and operating parameters of each of the steps in the refinery by processing the
concentrate through the chlorination pilot plant; and
•
achieving target product quality by TCM to meet marketing purity requirements.
The target for completion of all design work is Q4 2023.
Feasibility Study
Once the refinery design is finalised, all vendors will have their cost estimates verified and finalised for execution
of their respective portions of the overall plant and refinery. Globe expects this to be completed by Q1 2024 when
the revised feasibility study will be published.
Safe Transportation of Class 7 Material
In June 2023, the Company finalised initial discussions with C. Steinweg Group to safely handle the transportation
of concentrate from the Project.
Concentrate from the Project is classified as Class 7 material and is labelled as hazardous. As such, certain strict
protocols need to be followed in the management and handling of the product. Ensuring that Globe has a compliant
transport operator that can carry concentrate from the Project to the refinery in Namibia is a critical step in the derisking of the Project.
C. Steinweg Group is a globally operating independent, worldwide logistics service provider. They operate in the
fields of storage, handling, forwarding, chartering and other commodity related logistics services. C. Steinweg
Group has over 5,000 employees located across 100 locations in 52 countries. They are well-known in the region
and are the largest logistics company in Malawi with 5 sites and an additional office in Namibia.
Globe has now received and accepted an indicative quotation from C. Steinweg Group to transport concentrate
from the Project to the refinery in Namibia. The route chosen by Globe in consultation with C. Steinweg Group is
Kanyika to Johannesburg and onward to Walvis Bay in Namibia (Figure 1). These are regular and established logistics
routes and are more cost effective as they allow for back hauling along the line.
Quarter ended 30 June 2023
4
Figure 1. Route chosen by Globe in consultation with C. Steinweg Group is Kanyika to Johannesburg and onward to Walvis Bay
in Namibia
Continued Strong Support from Malawi Government
The Company received strong support from the Malawi Government during the quarter with a letter confirming
agreement on amended timing for commencement of substantial mine development and mineral production at
the Project.
The letter from the Department of Mines of the Malawi Government endorsed the ongoing efforts of Globe to
acquire and mobilise resources for the Project and assured the continued security of tenure for mining licence
LML0216/21.
Commenting on Globe’s efforts to progress the Project, the Malawian Commissioner of Mines and Minerals stated:
“I would like, therefore, to assure your Company, in view of Section 174(6) of the Mines and Minerals Act (No. 8 of
2019), of the continued security of tenure for the aforementioned Mining Licence since there is a reasonable
expectation that following the signing of the Mining Development Agreement (MDA) between Government and
your Company on 29th March, 2023, over the Kanyika Niobium Project:
(i)
Mine development shall commence within eighteen (18) months from date of the signing of the MDA;
and
(ii)
Substantial commercial mineral production at your Project site shall commence within sixty (60) months
from the date of the signing of the MDA.”
Quarter ended 30 June 2023
5
Government Ministers Visit Kanyika Mine Site
Globe received further endorsement for the Project with a site visit from the Honourable Monica Chang’anamuno
(Minister of Mining) and the Honourable Ibrahim Matola (Minister of Energy) on 8 June 2023 to inspect the progress
of the Project.
The Project is located between the areas of Senior Chief Inkosi Mabulabo of Mzimba District and Traditional
Authority (TA) Simlemba of Kasungu District, and both Government Ministers were pleased with the Company’s
operations to date and advancements made.
During the visit The Honourable Monica Chang’anamuno (Minister of Mining) commented on the cordial working
relationship with the Ministry of Energy in respect of the Project, with the Honourable Ibrahim Matola (Minister of
Energy) pledging to expedite the connection of electricity at the Kanyika mine site.
Figure 2. Hon. Monica Chang’anamuno (Minister of Mining) and Dr Joseph Mkandawire (Principal Secretary, Ministry of Mining)
at the Kanyika mine site
Appointment of Leading Malawian Businessman as Non-Executive Director
The Company strengthened the development team for the Project with the appointment of leading Malawian
businessman Mr Macleod G. Nyirongo as a Non-Executive Director of Globe Africa.
Mr. Nyirongo began his career as Principal Economist in Malawi’s Office of the President and Cabinet, responsible
for economic analysis and formulation of economic and social policies to stimulate Malawi’s growth. Thereafter he
had more than 25 years within the United Nations (UN) organisation, where his official postings as UN Country
Director included the People’s Republic of China, Eritrea, and Zambia, and he was also the UN’s Resident Director
in Sierra Leone and Kenya.
Quarter ended 30 June 2023
6
10-Tonne Sample Extracted for Phase 1 Plant Feasibility Study
One month after the Malawi Government approved the Mining Development Agreement (MDA) for the Project in
March 2023, Globe announced it had successfully completed its 10-tonne sampling program from an outcropping
at surface at the Project.
The 10-tonne sampling result is a significant next step after concluding the MDA and satisfies the first of the shortterm value drivers proposed for Q2, 2023.
The sample will accelerate important metallurgical testing and will enable the Company to:
•
determine the operating parameters for the implementation of chlorine gas-vapour technology for the
extraction and refining of Kanyika concentrate materials;
•
confirm the process to recover metals at a rate of >95% and to produce oxides with a grade of >99.5%;
•
confirm the potential suite of finished products viz. Nb2O5, Ta2O5, ZrO, FeO; and
•
produce the engineering parameters for the design, construction and operation of the pilot plant used for the
Phase One plant in support of the Scoping and Feasibility Study work.
The sample will also produce +/- 30 x 1kg commercial-grade samples to provide to interested parties and allow the
Company to expedite discussions with potential offtake partners (battery producers and Nb and Ta metal refiners).
The Company was assisted in this exercise by S.R. Nicholas and Crushing for Africa, and the final -40mm sample will
be packed into 1-tonne bulk bags and despatched to Johannesburg using C.Steinweg Bridge, a well-known regional
logistics company based in Lilongwe. In Johannesburg the sample will be further milled to effectively <1mm by EDS
(Energy and Densification Systems). Thereafter, Geolabs Global will prepare a concentrate sample using milling,
desliming, magnetic separation, flotation, dewatering and drying. The dried sample will then go to TCM Research
who will conduct an extensive program of metallurgical test work that will generate full-scale design parameters
for the refinery while producing marketing samples for customer evaluation.
Figure 3. Sample collection at Kanyika mine site: 28 April 2023
Quarter ended 30 June 2023
7
Niobium Market updates during the
quarter
13 Jun 2023: “The 35kWh battery pack gives the Elise-based Nybolt a range of up to 250km on one charge — a
relatively short range, but rather more useful if its ultra-rapid recharge time can be replicated in the real world.
Nybolt claims that constant fast-charging doesn’t wear out the battery, either. According to the company: “The
battery has been tested for over 2,000 fast charging cycles without significant performance loss.”
“With our unique technology we have achieved a six-minute charge car, and developed smaller battery packs that
can deliver more power and charge in less time. Our partnership with Callum shows how adoption of system-level
technology innovations can transform the future of electric vehicles and increase accessibility of EVs, including to
the 40 per cent of UK households who can’t charge their vehicle at home overnight.”
Figure 4. The 35kWh battery pack gives the Elise-based Nybolt a range of up to 250km on one charge
Niobium’s Ranking on the USA List of Critical Minerals 1
The Energy Act of 2020, Section 7002(c)(4)(A) 2, defined critical minerals as those which:
(i)
are essential to the economic or national security of the United States;
(ii)
the supply chain of which is vulnerable to disruption (including restrictions associated with foreign political
risk, abrupt demand growth, military conflict, violent unrest, anti-competitive or protectionist behaviors,
and other risks through-out the supply chain); and
1
https://www.federalregister.gov/documents/2021/11/09/2021-24488/2021-draft-list-of-critical-minerals
Quarter ended 30 June 2023
(iii)
8
serve an essential function in the manufacturing of a product (including energy, technology, defence,
currency, agriculture, consumer electronics, and healthcare-related applications), the absence of which
would have significant consequences for the economic or national security of the United States.
The 2021 quantitative evaluation uses: (a) a net import reliance indicator of the dependence of the U.S.
manufacturing sector on foreign supplies; (b) an enhanced production concentration indicator which focuses on
production concentration outside of the United States; and (c) weights for each producing country's production
contribution by its ability or willingness to continue to supply the United States.
Niobium ranks second on the list ie, the second highest supply chain risk based on quantitative evaluation out of
54 critical minerals.
Corporate
Cash at Bank
Cash at bank and term deposits at 30 June 2023 was $0.245 million (31 March 2023: $0.543 million).
The Company has initiated steps to raise further cash to fund its operations. The Company regularly evaluates
market appetite for equity investment and manages its capital and operations accordingly. The Company
anticipates it will be able to continue to access funding as required and, to this end, it is considering further fund
raising from internal and external parties. The Company will update the market of any steps it decides to take with
respect to funding at the appropriate time.
Loan Facilities with Director Bo Tan
During the quarter, the Company announced a further short-term loan facility of $600,000 from Director Bo Tan
(refer to ASX announcement made on 26 April 2023).
The key terms of the new loan facility are as follows:
•
Facility Limit: A$600,000
•
Drawdowns: 3 x A$200,000
•
First drawdown: on or after 1 May 2023
•
Interest Rate: 8.3% per annum
•
Default Interest Rate: 20% per annum
•
Maturity Date: 6 months after first drawdown (ie, 4 November 2023)
•
Security: the loan is unsecured
•
Repayment: At the lender’s election – repayable in cash or, subject to shareholder approval, by the issue of
fully paid ordinary shares at the lesser of:
o
a 15% discount to the 5-day VWAP immediately prior to the issue date; or
o
the issue price per share of the next debt or equity financing after the first drawdown date.
Quarter ended 30 June 2023
9
As announced on 19 April 2023, the terms of Mr Tan’s previous loan facility of $500,000 were varied to extend the
due date for repayment, by a further 6 months, to 18 October 2023. The facility limit was also reduced to
A$400,000. All other terms of the previous loan facility remain the same.
During the quarter, the Company also announced an additional short-term loan advance of $200,000 from Director
Bo Tan (refer to ASX announcement made on 28 June 2023).
The key terms of the new loan are as follows:
•
Loan Amount: A$200,000
•
Interest Rate: 8.3% per annum
•
Default Interest Rate: 20% per annum
•
Maturity Date: 4 November 2023
•
Security: the loan is unsecured
•
Repayment: At the lender’s election – repayable in cash or, subject to shareholder approval, by the issue of
fully paid ordinary shares at the lesser of:
o
a 15% discount to the 5-day VWAP immediately prior to the issue date; or
o
the issue price per share of the next debt or equity financing after the first drawdown date.
The new loan brings the total amount of all outstanding loan facilities provided to the Company by Mr Tan to A$1.2
million. The Board wishes to acknowledge the continued strong support shown by Mr Tan and is appreciative of his
ongoing commitment to the Company.
Ratification of Tranche One Placement
During the quarter, at a General Meeting of Globe’s shareholders held on 19 April 2023, shareholders ratified the
issue of 16,365,439 fully paid ordinary Globe shares and 3,273,078 options to subscribe for Globe shares pursuant
to tranche one of the $1.55 million placement to sophisticated and professional investors announced on 18
November 2022 (Placement).
Ratification of tranche one of the Placement has the effect of ‘refreshing’ the Company’s 15% capacity to issue
further equity securities under ASX Listing Rule 7.1 without obtaining shareholder approval, thus providing the
Company with as much flexibility as possible to raise additional capital.
After the end of the quarter, the Company announced that it had terminated its engagement of Viriathus Capital
Pty Ltd as Globe’s advisor and lead manager of the Placement. Consequently, the Company will not be proceeding
with tranche two of the Placement (refer to ASX announcement made on 31 July 2023).
ASX Additional Information
ASX Listing Rule 5.3.1: There were no substantive mining exploration activities during the quarter. Work was
confined to evaluation, however no funds were expended on evaluation activities (refer section 2.1(d) of Appendix
5B).
ASX Listing Rule 5.3.2: There were no substantive mining production and development activities during the quarter.
ASX Listing Rule 5.3.5: A total of $81,000 was paid to related parties during the quarter comprising Non-Executive
Directors’ fees (including superannuation).
Quarter ended 30 June 2023
10
ASX Announcements during the Quarter
The following announcements were lodged on the ASX Market Announcements Platform during the quarter:
Date
Description
19-Apr-23
19-Apr-23
27-Apr-23
28-Apr-23
1 May-23
3-May-23
9-May-23
14-Jun-23
16-Jun-23
27-Jun-23
28-Jun-23
Variation of Loan Facility with Director Bo Tan
Results of Meeting
Globe secures further funding with additional $600,000 loan
Quarterly Activities/Appendix 5B Cash Flow Report
Proposed issue of securities – GBE
Globe extracts 10-tonne sample from Kanyika Niobium Project
Globe strengthens team with key appointment in Africa
Kanyika Niobium Project Update
Kanyika Niobium Project – Further Update
Kanyika Niobium Project Next Steps and Vendor Selection
Globe secures further funding with additional $200,000 loan
These announcements are available for viewing on the Company’s website www.globemm.com.
Shareholding Information
At 30 June 2023, shares on issue totalled: 506,768,695. The number and distribution of holders at 30 June 2023
was:
Units
1 - 1,000
1,001 – 5,000
5,001 – 10,000
10,001 – 100,00
100,001 and above
Total
Number
Total Units
%
64
46
78
317
149
654
3,198
158,143
635,389
14,420,457
491,551,508
506,768,695
0.00%
0.03%
0.13%
2.85%
97.00%
100.00%
Top 20 Holders at 30 June 2023
Position
1
2
3
4
5
6
7
8
9
Holder Name
APOLLO METALS INVESTMENT COMPANY LIMITED
AO-ZHONG INTERNATIONAL MINERALRE SOURCES
PTY LTD
TRIPLE TALENT ENTERPRISES LTD
BNP PARIBAS NOMINEES PTY LTD ACF
CLEARSTREAM
CITICORP NOMINEES PTY LIMITED
MR COLIN ROBERT SEARL &
MRS CYNDA SEARL
BNP PARIBAS NOMS PTY LTD
<DRP>
MR RICHARD ULRICK &
MRS WENDY ULRICK
<ULRICK SUPER FUND A/C>
HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED A/C 2
Holding
% IC
245,983,611
118,143,062
48.54%
23.31%
24,480,883
13,619,239
4.83%
2.69%
8,165,464
7,145,467
1.61%
1.41%
4,940,016
0.97%
3,769,607
0.74%
2,547,891
0.50%
Quarter ended 30 June 2023
10
11
12
13
14
15
16
17
18
18
19
20
11
M & K KORKIDAS PTY LTD
<M & K KORKIDAS PTY LTD A/C>
GOENG INVESTMENTS PTY LTD
<GOENG PENSION FUND A/C>
MR NOEL MALCOLM SCAMMELL
MR DRITAN MEHMETI
C & CR SUPERCO PTY LTD
<C & CR SEARL SUPERFUND A/C>
MR KELLY PETER BODMAN
MR MARK LEONARD SWANSON
GOTHA STREET CAPITAL PTY LTD
<BLUE SKY NO 2 A/C>
FIRST INVESTMENT PARTNERS PTY LTD
PRIMARY SECURITIES LTD
<ANADARA ASX SP OPP FUND A/C>
BENRET PTY LTD
<COLIN SEARL FAMILY A/C>
TEBIL PTY LTD
<BODMAN SUPER FUND A/C>
Total
Total Issued Capital
2,478,000
0.49%
2,358,697
0.47%
2,009,900
2,000,000
1,980,078
0.40%
0.39%
0.39%
1,980,022
1,725,000
1,711,000
0.39%
0.34%
0.34%
1,600,000
1,600,000
0.32%
0.32%
1,469,182
0.29%
1,310,414
0.26%
451,017,533
89.00%
506,765,695
100.00%
Schedule of Mineral Tenements at 30 June 2023
Country
Project
Type
Status
Tenement
Malawi
Kanyika
Mining Licence
Granted
LML0216/21*
Interest held by Globe
30 Jun 2023
31 Mar 2023
100%
100%
There were no tenements acquired or disposed during the quarter.
* Pursuant to the Mines and Minerals Act, the Malawi Government is entitled to a 10% free equity interest in
LML0216/21.
Authorisation for Release
This report has been authorised for release by the Company’s Chief Executive Officer, Grant Hudson.
For further information, please contact:
Grant Hudson
Chief Executive Officer
gh@globemm.com
Quarter ended 30 June 2023
12
Qualifying Statements
Mineral Resources Estimates
The information in this report that relates to Mineral Resources is extracted from the report titled “Kanyika
Niobium Project – Updated JORC Resource Estimate” released to the Australian Securities Exchange (ASX) on 11
July 2018 and available to view at www.globemm.com and for which Competent Persons’ consents were
obtained. Each Competent Person’s consent remains in place for subsequent releases by the Company of the
same information in the same form and context, until the consent is withdrawn or replaced by a subsequent
report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the information
included in the original ASX announcement released on 11 July 2018 and, in the case of estimates of Mineral
Resources, that all material assumptions and technical parameters underpinning the estimates in the original ASX
announcement continue to apply and have not materially changed. The Company confirms that the form and
context in which the Competent Persons’ findings are presented have not been materially modified from the
original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 titled “Kanyika Niobium Project –
Updated JORC Resource Estimate” available to view at www.globemm.com.
The information in this report that relates to Ore Reserves is extracted from the report titled “Kanyika Niobium
Project – Project Feasibility and Economics” released to ASX on 19 August 2021 and available to view at
www.globemm.com and for which Competent Persons’ consents were obtained. Each Competent Person’s
consent remains in place for subsequent releases by the Company of the same information in the same form and
context, until the consent is withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the information
included in the original ASX announcement released on 19 August 2021 and, in the case of estimates of Ore
Reserves, that all material assumptions and technical parameters underpinning the estimates in the original ASX
announcement continue to apply and have not materially changed. The Company confirms that the form and
context in which the Competent Persons’ findings are presented have not been materially modified from the
original ASX announcement.
Full details are contained in the ASX announcement released on 19 August 2021 titled “Kanyika Niobium Project –
Project Feasibility and Economics” available to view at www.globemm.com.
Disclaimer
This report has been prepared by Globe Metals & Mining Limited (Company). The material contained in this
report is for information purposes only. This release is not an offer or invitation for subscription or purchase of, or
a recommendation in relation to, securities in the Company and nether this release nor anything contained in it
shall form the basis of any contract or commitment.
This report may contain forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning the Company’s business plans, intentions, opportunities, expectations, capabilities, and
other statements that are not historical facts. Forward-looking statements include those containing such words as
could-plan-target-estimate-forecast-anticipate-indicate-expect-intend-may-potential-should or similar
expressions. Such forward-looking statements are not guarantees of future performance and involve known and
Quarter ended 30 June 2023
13
unknown risks, uncertainties, assumptions, and other important factors, many of which are beyond the control of
the Company, and which could cause actual results to differ from those expressed in this report. Because actual
results might differ materially to the information in this report, the Company does not make, and this report
should not be relied upon as, any representation or warranty as to the accuracy, or reasonableness, of the
underlying assumptions and uncertainties. Investors are cautioned to view all forward-looking statements with
caution and to not place undue reliance on such statements.
The report has been prepared by the Company based on information available to it, including information from
third parties, and has not independently verified. No representation or warranty, express or implied, is made to
the fairness, accuracy or completeness of the information or opinions contained in this report.
The Company estimates its reserves and resources in accordance with the Australasian Code for Reporting of
Identified Mineral resources and Ore Reserves 2012 Edition (JORC Code), which governs such disclosures by
companies listed on ASX.
Appendix A: About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the regional centre of Kasungu
and is secured by Large-Scale Mining Licence No. LML0216/21 which grants the Company security of tenure and the right to
mine niobium, tantalum, and deleterious uranium.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have defined the extent of mineralisa�on.
Structured and progressive engineering studies have resulted in the current (JORC 2012) Mineral Resource Es�mate (refer
below) and given rise to significant improvements and simplifica�ons in the process flowsheet, from that first imagined.
In addi�on, Globe has undertaken substan�al metallurgical op�misa�on work and commissioned a pilot plant to
demonstrate and further op�mise metallurgical processes. Metallurgical op�misa�ons studies have improved recoveries
from 62% in 2012 to 75% today, through simple novel patented metallurgical processes
The Kanyika opera�ons will produce a pyrochlore mineral concentrate that contains both niobium and tantalum in
commercially valuable volumes to be shipped to a refinery for advanced processing into high purity materials.
A Mineral Resource Es�mate for the Kanyika Niobium Project under the 2012 JORC guidelines was reported to ASX on 11 July
2018 as follows:
Table 1: MRE for KNP using a 1,500 ppm Nb2 O5 lower cut
Category
Resource
(Mt)
Measured
5.3
Indicated
47
Inferred
16
TOTAL
68.3
Nb2 O5 (ppm)
Table 2: MRE for KNP using a 3,000 ppm Nb2 O5 lower cut
Resource
(Mt)
Nb2 O5 (ppm)
Ta2 O5 (ppm)
Ta2 O5 (ppm)
Category
3,790
180
Measured
3.4
4,790
220
2,860
135
Indicated
16.6
4,120
160
2,430
120
Inferred
2.8
4,110
190
2,830
135
TOTAL
22.8
4,220
190
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Globe Metals & Mining Limited
ABN
Quarter ended (“current quarter”)
33 114 400 609
30 June 2023
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(12 months)
$A’000
(305)
(305)
(393)
(1,637)
-
-
-
331
(698)
(1,611)
(c) property, plant and equipment
-
(7)
(d) exploration & evaluation
-
(846)
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
(b) development
(c) production
(d) staff costs
(e) administration and corporate costs
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (provide details if material)
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) tenements
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash f