Full Year Statutory Accounts
Released
Released
Announcement PDF
Globe Metals and Mining Limited
ABN 33 114 400 609
Annual Financial Report for the year ended - 30 June 2024
GLOBE METALS AND MINING LIMITED
CONTENTS
FOR THE YEAR ENDED 30 JUNE 2024
CORPORATE DIRECTORY
CHAIRMAN'S LETTER
DIRECTORS' REPORT
AUDITOR'S INDEPENDENCE DECLARATION
CONSOLIDATED STATEMENT OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOME
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
CONSOLIDATED STATEMENT OF CASH FLOWS
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS
CONSOLIDATED ENTITY DISCLOSURE STATEMENT
DIRECTORS’ DECLARATION
INDEPENDENT AUDITOR'S REPORT
SHAREHOLDER INFORMATION
ANNUAL MINERAL STATEMENT
1
2
3
5
29
30
31
32
33
34
56
57
58
62
65
GLOBE METALS AND MINING LIMITED
CORPORATE DIRECTORY
FOR THE YEAR ENDED 30 JUNE 2024
Directors
Alice Wong - Non-Executive Chairperson
Bo Tan - Non-Executive Director
Ricky Lau - Non-Executive Director
Michael Barrett - Non-Executive Director
Michael Choi - Non-Executive Director
Company secretary
Paul Hardie
Senior Management
Paul Smith - Chief Executive Officer
Rex Zietsman - Chief Technical Officer
Charles Altshuler - Chief Financial Officer
Principle & Registered office
Telephone
Fax
ABN
45 Ventnor Avenue, West Perth, WA, 6005
+61 8 6118 7240
+61 8 6323 0418
33 114 400 609
Auditors
Australia:
BDO Audit Pty Ltd
Level 9, Mia Yellagonga Tower 2, 5 Spring St
Perth WA 6000
Malawi:
Deloitte
1st Floor PLC House, Kaohsiung Road
Top Mandala
Blantyre
Share Registry
Automic Pty Ltd
Level 5, 191 St Georges Terrace
Perth WA 6000
T: 1300 288 664
www.investor.automic.com.au
Stock exchange listing
Australian Securities Exchange
(Home Exchange: Perth, Western Australia)
Level 40, Central Park, 152-158 St Georges Terrace
Perth WA 6000
Code: GBE
Bankers
Westpac
106 St Georges Terrace
Perth WA 6000
2
GLOBE METALS AND MINING LIMITED
CHAIRMAN'S LETTER
FOR THE YEAR ENDED 30 JUNE 2024
Chairman’s Letter
Dear shareholders,
I am pleased to share our progress as we advance toward developing the first globally significant niobium mine in 50 years.
Over the course of 2024 financial year, we have made significant strides in our flagship Kanyika Niobium Project located
in Malawi.
Progress on the Kanyika Project
On behalf of the Board of Directors, I am proud to report that the 2024 financial year has seen substantial advancements in
our efforts to develop the Kanyika Niobium Project (Project). In February 2024, we finalised the optimisation study of the
Project, which critically assessed the Definitive Feasibility Study (DFS) published in 2021. Key findings from this study included
the need to phase the Project to mitigate delivery risk and enhance funding opportunities. Additionally, we identified several
optimisation initiatives for the concentrator design and concluded that establishing a refining facility in Malawi is the most
viable option.
We have strategically decided to develop an integrated Project utilizing the proven Hydrofluoric Acid/Solvent Extraction
(HF/SX) refining technology. The low-risk process ensures high product purity to meet the demands of the oxide markets.
We are on track to release a Bankable Feasibility Study (BFS) update soon, paving the way for project execution in 2025.
Strengthening the team
I am delighted to announce that we have significantly strengthened our management team over the past year. A key
appointment was Mr Paul Smith, who joined us as CEO in May 2024. We have also welcomed new senior management across
essential areas, including Geology, Project Management and Marketing. I extend my heartfelt gratitude to our former CEO,
Mr Grant Hudson, for his invaluable support during this transition.
We are equally thankful to Mr Neville Huxham who retired in July 2024 after his 12 years of outstanding and dedicated service
to Globe. Mr Macleod G. Nyirongo succeeded Mr Huxham as Chairman of our Malawi subsidiaries, and has shown great
leadership to ensure a smooth operation and transition.
Funding
In the 2024 financial year, our team worked diligently to define the Phase 1 capital cost of US$46m (on a pre-BFS basis). We
have established a clear and pragmatic funding structure, incorporating equity funding, convertible debt, senior debt and
pre-offtake funding.
Shortly after the close of our 2024 financial year, we received a Letter of Intent from Ecobank Malawi for a senior debt facility
of US$15m. This commitment by Ecobank is significant and positions us to secure the remaining funding needed for the
Project.
Additionally, on 26th April 2024, we announced the reactivation of its Legal Entity Identifier (LEI) number, enabling us to
resume trading on the Frankfurt Stock Exchange (FSE), the other regional German stock exchanges, and the Tradegate
exchange under the ticker symbol "G4U". This cross-listing initiative has increased trading activity in Globe shares.
Offtake Agreements
In line with our development achievements, we signed our first Letter of Intent of offtake with Affilips N.V. of Belgium just
after the end of our 2024 financial year. The offtake agreement covers approximately one-third of Phase 1 production. We
are actively advancing discussions for additional offtake agreements, which will further support the BFS process initiated late
last year.
3
GLOBE METALS AND MINING LIMITED
CHAIRMAN'S LETTER
FOR THE YEAR ENDED 30 JUNE 2024
Commitment to Malawi
Globe remains committed to supporting local communities and enjoys strong relationships with regional stakeholders and
the Government of Malawi. Following the Mine Development Agreement signed in March 2023, we recently signed a
Community Development Agreement (CDA) with seven local communities, reinforcing our commitment to community
engagement and development. This leads to the establishment the Kanyika Development Trust, ensuring that the local
communities have a pivotal voice in selecting and managing community-upliftment projects funded by the Project.
We are proud to have sponsored the first-ever Inaugural Malawi Mining Investment Forum, which was a resounding success.
We look forward to supporting this initiative in the coming years.
Looking forward
The upcoming year promises to be an exciting period for Globe Metals & Mining. When we achieve the Phase 1 project
capital raise, we anticipate finalizing our BFS update in early 2025, securing offtake commitments, and moving the Project
into execution. We are confident that a fully integrated Kanyika Project will be commissioned and in production by early
2026, with the second phase of development expected in early 2028.
On behalf of the entire Globe Metals & Mining Board of Directors, I extend my sincere thanks to our management team and
staff for their dedication to developing the Kanyika Project. I also appreciate the ongoing support from local communities,
regional authorities and the Government of Malawi. Lastly, I want to express my gratitude for your patience as we continue
to achieve milestones in our development plan. We look forward to providing regular updates on our progress in bringing
this exciting asset to fruition.
Yours faithfully,
Alice Wong
Non-Executive Director
4
GLOBE METALS AND MINING LIMITED
DIRECTORS' REPORT
FOR THE YEAR ENDED 30 JUNE 2024
The directors of Globe Metals and Mining Limited (‘Globe’ or ‘the Company’) hereby submit the financial report of the Company and its
controlled entities ('the Group') for the financial year ended 30 June 2024.
DIRECTORS
The names and particulars of the Directors of the Company during or since the end of the financial year are:
Alice Wong
Bo Tan
Ricky Lau
Michael Choi
Michael Barrett
Non-Executive Chairperson
Non-Executive Director
Non-Executive Director
Non-Executive Director
Non-Executive Director
Directors have been in office since the start of the financial year to the date of this report unless otherwise stated.
INFORMATION ON DIRECTORS
Alice Wong
Special responsibilities:
Qualifications:
Experience:
Interests in shares:
Interests in options:
Other current directorships:
Former directorships (last 3 years):
1
Non-Executive Chairperson
Member of Nomination and Remuneration Committee
B. Bus in Accounting and Finance
Ms Alice Wong is an accountant by training and commenced her career with Price Waterhouse.
After more than a decade of service in the investment banking industry in Asia working for large
multinational companies Morgan Stanley, ABN AMRO Rothschild and BNP Paribas Peregrine, Ms
Wong extended her entrepreneurial endeavour into luxurious products and health care
companies. Ms Wong invested into Globe via Apollo Metals Investment Co. Ltd during 2014 and
has since served as the Non-Executive Chairperson of its Board of Directors where she has played
an integral role in advancement of the Kanyika Project including the granting of the mining
licence in August 2021.
351,405,1581
Nil
Ms Wong holds a Bachelor of Business Administration in Accounting and Finance from the
University of Hong Kong and is a member of the American Institute of Certified Public
Accountants (AICPA).
Nil
Ms Wong is the sole shareholder and Director of Apollo Metals Investment Co. Ltd which holds 351,405,158 shares in the Company.
Bo Tan
Non-Executive Director
Special responsibilities:
Qualifications:
Experience:
Chairperson of Audit and Risk Committee
BEcon - Renmin China, MBA - Thunderbird USA, M.A University of Connecticut
Mr Tan has approximately 20 years’ experience as a senior manager and director in financial
planning, reporting, investment, capital structure and industrial research; and has worked for
companies such as Bohai Industrial Investment Fund, Lehman Brothers Asia and Macquarie
Securities Asia, and across international markets in China, Hong Kong, Canada and USA.
69,428,6622
1,250,000
Nil
Nil
Interests in shares:
Interests in options:
Other current directorships:
Former directorships (last 3 years):
2
Mr Tan a shareholder and Director of Triple Talent Enterprises Ltd which holds 69,428,662 shares in the Company.
5
GLOBE METALS AND MINING LIMITED
DIRECTORS' REPORT
FOR THE YEAR ENDED 30 JUNE 2024
Ricky Lau
Non-Executive Director
Special responsibilities:
Qualifications:
Experience:
Interests in shares:
Interests in options:
Other current directorships:
Former directorships (last 3 years):
Chairperson of Nomination and Remuneration Committee
MBA Kellogg-HKUST, BCom UBC (Hons)
Mr Lau has over 20 years’ experience in private equity investment in Asia and is presently the
Managing Partner of private equity real estate firm Crane Capital Limited.
Nil
1,250,000
Nil
Nil
Michael Barrett
Non-Executive Director
Special responsibilities:
Member of the Audit and Risk Committee
Member of the Environment, Society and Governance Committee
BSc.(SocSci) Joint Honours - Accounting and Economics, Fellow of The Institute of Chartered
Accountants in England and Wales, Graduate of the AICD
Mr Barrett has over 30 years’ international experience in strategy, capital markets, investor
relations, and risk management. Mr. Barrett has extensive experience working in the energy and
resources industry having held senior mining sector roles in Western Australia, including with
Rio Tinto Iron Ore and WMC Resources Ltd. Most recently, Mr Barrett was National Lead Partner
for Deloitte’s Risk Advisory Energy and Resources practice, specialising in Board Advisory and
Risk Management for many of the largest mining and energy and resources companies
nationally, prior to establishing his own consulting business, helping develop smaller businesses
across the energy and resources industry.
Mr Barrett is a Graduate of the AICD and is previously the Lead Independent, non-executive
director and Chair of the Audit Committee with dual listed (TSX and ASX) Novo Resources Corp
(TSXASX Code: NVO).
Nil
1,250,000
Nil
Novo Resources Corp (TSX/ASX: NVO), non-executive director, appointed on October 2017 and
resigned April 2024. Entyr Limited (ASX: ETR) (previously Pearl Global Limited (ASX: PG1)), nonexecutive director, appointed on August 2018 and resigned February 2023.
Qualifications:
Experience:
Interests in shares:
Interests in options:
Other current directorships:
Former directorships (last 3 years):
Michael Choi OAM
Non-Executive Director
Special responsibilities:
Qualifications:
Experience:
Chairperson of Environment, Society and Governance Committee
BEng (Civil) University of Queensland
Mr Choi is a professional chartered engineer specialising in property development, project
management and construction. Mr Choi also has extensive experience in trade development,
community engagement, cross cultural communication, relationship management and
negotiations with governmental agencies.
Mr Choi is a former member of parliament of Queensland and held the position of Parliamentary
Secretary (assisting on ministerial matters) with portfolios including natural resources, mines
and energy, trade as well as multicultural affairs. He was the first Asian-Australian elected to
Queensland parliament. With this background he is therefore experienced in mining includes
policy setting, governance, regulations, negotiation with authorities, project assessment,
feasibility, CAPEX, all acquired in his Assistant Minister role in the Queensland Government with
mines and energy portfolios.
In his career, Mr Choi was recognized with multiple awards, including the Medal of the Order of
Australia (OAM), and Lord Mayor’s Business Award.
Nil
1,250,000
Nil
Nil
Interests in shares:
Interests in options:
Other current directorships:
Former directorships (last 3 years):
6
GLOBE METALS AND MINING LIMITED
DIRECTORS' REPORT
FOR THE YEAR ENDED 30 JUNE 2024
COMPANY SECRETARY
Paul Hardie was appointed Company Secretary and General Counsel of Globe effective from 1 July 2022.
Mr Hardie is admitted as a practitioner of the Supreme Court of Western Australia and the High Court of Australia, holds a Bachelor of
Laws from Murdoch University and a Bachelor of Economics from the University of Western Australia. In addition, Mr Hardie has
significant experience as a corporate and commercial lawyer advising public companies in the SME and ASX microcap sector across
various industries and in the management of listed public companies having acted as Chairman and as a non-executive director of a
number of ASX listed companies and is currently the Company Secretary of ASX listed company Matrix Composites & Engineering
Limited.
PRINCIPAL ACTIVITIES
The principal activities of the Group during the financial year were to explore, develop and invest in the resource sector. The Group’s
major project is the Kanyika Niobium Project in Malawi.
There were no significant changes in the nature of the Group’s principal activities during the current year.
RESULTS
The consolidated loss after providing for income tax of the Group for the year ended 30 June 2024 amounted to $3,437K (30 June 2023:
$2,675K).
REVIEW OF OPERATIONS
The Kanyika Niobium Project (“Kanyika”) is located in central Malawi, approximately 55km northeast of the regional centre of Kasangu
and secured by Mining Licence LML0216/21. Niobium usage is rapidly increasing and is at the forefront of numerous new-age
technologies, including gas and wind turbines, medical imaging, particle accelerators and space travel, as well as the manufacture of
high-performance and ultra-safe, ultra-rapid rechargeable batteries for electric vehicles.
The Company is well on the way to opening the fourth niobium mine in the world (and the first such mine into production in the last 50
years) and the first ever in Africa. The production of high-grade niobium oxides from Africa will improve the current geographic
concentration of major niobium suppliers (with only three in South America and one in Canada) and help mitigate existing supply chain
risks for the whole industry.
Project Development
Project optimisation study
Kanyika has the potential to become the first new globally significant niobium mine in 50 years, with an average nameplate production
capacity of 3,267 tonnes per annum of niobium pentoxide, (Nb2O5) and 136 tonnes per annum of tantalum pentoxide (Ta2O5) over the
27-year life of mine. The Nb2O5 and Ta2O5 products will be high-purity products with grades exceeding 99.5% and 99.0% respectively.
The optimisation study follows the announced 2021 Definitive Feasibility Study (“DFS”), which first established Kanyika’s potential
configuration and economic feasibility. On 5th February 2024, Globe announced the findings of its optimisation study which had the
following key elements:
●
a low-risk, two-phased approach to the development of the Project
●
optimisation of the milling and concentration circuits
●
the preferred location of the refinery to be Malawi.
Two-Phased Development Approach
Phase 1
(1) Low risk and low total capital cost (estimated at US$29m) Phase 1 (mine, concentrator, and refinery development).
(2) Mine capacity of 86k tonnes per annum ROM, and 1,760 tonnes per annum of concentrate.
(3) Deferral of the Milenje River Dam by four years (capital cost US$25m).
(4) The preferred location of the Phase 1 refinery is Malawi.
Phase 2
(1) Mine and concentrator ramp up post the commissioning of Phase 1.
(2) Mine capacity development to 1.5m tonnes per annum and 17.7k tonnes per annum of concentrate.
(3) Phase 2 Refinery to be built in Malawi, on the mine site.
7
GLOBE METALS AND MINING LIMITED
DIRECTORS' REPORT
FOR THE YEAR ENDED 30 JUNE 2024
Mine Concentrator Design Optimisation
(1) Replacement of SAG mill with the EDS horizontal multi-shaft mill.
(2) Redesign of the two-stage flotation circuit to a single stage, and the reduction of flotation reagents to 4 from 12 reagents.
(3) Optimisation of mass pull and recovery of the concentrator.
(4) Dry tailings disposal and co-deposition with mine strip waste material.
Preferred Refinery Location – Malawi
(1) The Company has evaluated a number of options for the location of the Refinery, including the UAE, Namibia, and Malawi.
(2) Malawi is the preferred location of the Phase 1 refinery for the following key reasons:
●
●
●
●
●
●
Regulatory – initial discussions relating to the regulatory requirements of operating a Class 7 facility in Malawi have been
constructive and favourable to the Project.
Availability of land.
Initial discussions around a range of financial incentives to operate a refinery in Malawi have been favourable.
Stable and low-risk country in which to operate.
Transparent and efficient legal and regulatory system.
Cost-effective source of reagents, including salt (chlorine generaon).
Concentrator Design
Bulk Sample
In Q1 calendar 2023, it was decided to carry out additional metallurgical testing on Kanyika ore. In April 2023, an 11 tonne bulk sample
was collected from Pit 1 in the mine. Pit 1 will be the first pit to be mined. The bulk sample was collected at a surface outcrop using an
excavator. This sample was transported to Lilongwe where it was crushed to less than 40mm. The sample was bagged in bulk bags and
exported to South Africa.
Crushing and Milling
The previous metallurgical testwork on the ore was carried out in 2012. Since then, a new horizontal shaft impactor crushing machine
was developed by Energy Densification Systems (“EDS”) of South Africa. The EDS impactor promised to reduce the size of less than 40mm
ore to less than 1mm using about 2kWh/tonne of ore. The Kanyika bulk sample was put through a full-scale EDS machine which confirmed
that 2kWh/ton was achievable.
Production of Concentrate
The partially crushed less than 1mm bulk sample was then milled in a ball mill and screened to less than 150µm. The milled ore was
subjected to two stage desliming, followed by low intensity magnetic separation (LIMS) as per the original flowsheet. Flotation tests with
three different collectors were carried out. The results showed that the collector previously identified outperformed the other two South
Africa-sourced contenders. A set of grade/recovery profile tests were carried out to see under what combinations of recovery versus
concentrate grade could be achieved. The results were very similar to previous batch flotation tests carried out internally by Globe in
Perth in 2021/22.
The bulk sample niobium grade was close to the predicted Whittle model grade for that location on the ore body, though both values
are lower than the life-of-mine average. It was previously established that niobium recoveries decline with reducing niobium
concentration in the ore. This was confirmed with the grade/recovery flotation tests.
The objective of the flotation work thereafter was to produce concentrate for further metallurgical testing. The methodology followed
was to produce an intermediate grade concentrate and then to clean the intermediate grade sample to fall within the range of 15% to
20% Nb2O5. A total of 14.5 kg of concentrate was produced in four batches with an average grade of 17.3% Nb2O5.
Concentrator Design for Phase 1
The effect of using the EDS impactor rather than SAG mill was an approximate 40% reduction in comminution power consumption. This
was mostly achieved by eliminating a 2MW SAG mill and reducing the 3.2MW ball mill to just 2MW. Added into the flowsheet were a
cone crusher to get the ore below 40mm, and four EDS impactors.
The mill classification circuit was modified to use a standard two deck vibrating screen with a high frequency lower deck. This screen
replaced multiple Derrick screens while reducing operational complexity.
8
GLOBE METALS AND MINING LIMITED
DIRECTORS' REPORT
FOR THE YEAR ENDED 30 JUNE 2024
The flotation section has been modified since the 2013 DFS engineering by reducing the two-stage flotation to a single stage comprising
rougher and scavenger sets with four cleaner stages. Single stage flotation has greatly reduced the complexity of having to maintain two
separate water circuits as the niobium suppression reagents used in the first stage would be very detrimental in the niobium recovery in
the second stage. In addition, the number of reagents required dropped from twelve to four, significantly reducing the reagent cost.
The Phase 1 concentrator design was carried out using the new flowsheet. This flowsheet will be used in the 2024 BFS and will be applied
to both Phases 1 and 2.
Refining Technology
The optimisation study initially focused on using Carbochlorination refining technology, over the Hydrofluoric Acid/Solvent Extraction
(HF/SX) technology, originally recommended in the 2021 DFS. Globe then undertook further Chlorination test-work, to validate the
assumption. Based on several significant challenges relating to Chlorination, Globe decided to continue the development of the project
using the HF/SX refining route, which has the following key advantages:
●
An approved DFS, based on HF/SX refining in Malawi, is already in place
●
An approved EIA in Malawi using the technology is also already in place
●
Using the HF/SX technology will help fast-track the development of the project
●
Using the HF/SX technology better ensures that the product quality demanded by key off-takers is delivered.
Globe is continuing its Chlorination refining metallurgical test work, as the Company believes the process has significant environmental
and cost advantages. Globe, however, realised that the process was not mature enough to develop into a commercial operation at this
point in time.
Project Capital Cost
During the year, Globe has focused in on the development of Phase 1 of the Project.
As announced on 28th May 2024, the total funding required for Phase 1 first production, including working capital and indirect costs has
been estimated at US$46m.
Table 1: Kanyika project Phase 1 capital cost estimate
* Refer ASX announcement dated 5th February 2024 entitled ‘Globe completes Optimisation study at Kanyika’.
Phase 1 Funding
The Company has made significant progress in the structured financing of Phase 1, emphasizing practicality, viability, and risk mitigation
within the funding package. This package is expected to consist of equity, project debt, convertible notes, and pre-shipment financing.
The equity funding could involve a general issue of shares to the market, along with allocations to cornerstone investors. Discussions
with the cornerstone investors are well-advanced. The Company is committed to minimizing the dilution of existing shareholders as
much as possible and believes the now-being-constructed Phase 1 financing package will address this concern.
Progress on project debt and convertible note funding is also advanced, with negotiations in progress. The Company has received
substantial support from global and regional development institutions, which will play a crucial role in providing the necessary debt and
convertible note funding for the project.
9
GLOBE METALS AND MINING LIMITED
DIRECTORS' REPORT
FOR THE YEAR ENDED 30 JUNE 2024
After the end of Globe’s 2024 financial year, the Company announced that it had received a signed letter of intent from Ecobank Malawi
for US$15 million in senior debt (see ASX announcement dated 25th July 2024). This funding commitment has marked a significant step
forward in Globe’s funding objectives.
Strategically, the Company has decided to focus on Western country principal (OEM) refined products offtake, and has finalised a "target
list" of strategic offtakers. Discussions regarding the long-term offtake of its main high-purity products (Niobium, Tantalum, and
Zirconium) are progressing well.
The table below displays the different financing ranges and their average amounts for the mining, concentrator, and refinery project.
Offtake
Also post the end of the 2024 financial year, Globe signed a letter of intent (LOI) with Affilips N.V of Belgium (“Affilips”) (see ASX
announcement dated 2nd September 2024).
The Agreement provides a framework for Globe and Affilips to negotiate a binding offtake agreement for the supply of up to 32%
(approximately 100 tonnes out of 313 tonnes of total annual Phase 1 production) of the high purity Niobium Pentoxide production from
this stage of The Kanyika Niobium Project’s development process. The initial 3-year term of the Agreement would commence from 1
May 2026, when the production of Phase 1 oxide is expected. The price paid by Affilips for this production will be negotiated depending
on prevailing market conditions.
A now stronger Project Team to take Kanyika into development
The Company further strengthened its executive team over the past 12 months or so, a clear positive as the Kanyika Project’s
development plan and operations continue to evolve:
●
The Company further strengthened its executive team over the past 12 months or so, a clear positive as the Kanyika Project’s
development plan and operations continue to evolve:
●
On 6th March 2024, Mr Paul Smith was appointed COO and CEO designate. Paul subsequently succeeded Mr Grant Hudson as CEO
on 3 May 2024.
●
In May 2023, Malawi businessman Mr Macleod G. Nyirongo was appointed as a Non-Executive Director of Globe Metals and Mining
(Africa) Limited. Mr Nyirongo has subsequently taken up the Chairmanship of the latter company. Mr Nyirongo has acknowledged
experience in the global mining sector and a successful track record of supporting the development of African countries, the latter
clearly apparent during his time with the United Nations.
●
Mr Hudson then agreed to take up the critical role with Globe’s leadership team of Regional Advisor - Southern Africa.
●
As announced on 27th October 2024, Mr Louis Schoeman was appointed Project Manager for the Kanyika Project.
●
Two further senior appointments in our 2024 financial year were Mr David Young as Senior Consulting Geologist, and Mr Rogerio
Pastore as Senior Marketing Advisor.
Malawi developments
In another important development occurring just after the end of Globe’s 2024 financial year, the Company signed the critical Community
Development Agreement (CDA) with seven local communities in mid-August 2024 (see ASX announcement dated 19 August 2024). This
Agreement comes in the wake of the Mine Development Agreement, which was signed in March 2023. The CDA provides for the creation
of the Kanyika Development Trust, which will ensure that the community has an active and pivotal voice in the selection and management
of community-upliftment projects to be funded by the Company.
10
GLOBE METALS AND MINING LIMITED
DIRECTORS' REPORT
FOR THE YEAR ENDED 30 JUNE 2024
Signing of the Community Development Agreement
Globe has also been active in the community with various projects completed. One of these projects was the donation of 5 000 trees to
various schools in the area and Wildlife and Environment Society of Malawi (WESM). Globe is now working together with the children to
ensure that the trees reach maturity. In other projects, Globe has donated 100 desks to the local high school, and will be upgrading
water-points at schools and clinics in the area before the next rainy season commences.
The Malawi Government, ably represented by the Minister of Mines the Honourable Monica Chang'anamuno, has been extremely active
in their support of the mining community and Globe in particular. With the recent gazetting of the new Mines Bill and the imminent
introduction of the Mines Regulations, Globe looks forward to continuing to build momentum towards the successful commencement
of the Kanyika Project.
Germany cross-listings
On 26th April 2024, Globe announced that it had received approval for the reactivation of its German stock market Legal Entity Identifier
(LEI) number, opening the way for the Company to re-commence trading on the Frankfurt Stock Exchange (FSE), several regional German
stock exchanges, and the Tradegate exchange. Trading in these exchanges is now occurring under the ticker symbol "G4U".
11
GLOBE METALS AND MINING LIMITED
DIRECTORS' REPORT
FOR THE YEAR ENDED 30 JUNE 2024
The FSE is one of the world's largest international trading centres for securities. Operated by the De
Share your feedback
Discover