Globe announces cross-listings on German Exchanges
Released
Released
Announcement PDF
Globe Metals & Mining Limited
ABN 33 114 400 609
45 Ventnor Avenue
West Perth WA 6005
ASX: GBE
+61 8 6118 7240
info@globemm.com
globemm.com
ASX Announcement
26 April 2024
Globe announces cross-listings on German Exchanges
Globe Metals and Mining Limited (ASX: GBE) (“Globe” or “Company”) is pleased to announce that its
ordinary shares are now trading on the Frankfurt Stock Exchange (FSE), various regional German stock
exchanges, and the Tradegate Exchange under the ticker symbol “G4U” pursuant to its planned crosslisting strategy to increase brand recognition and liquidity in the central European capital markets
announced on 4 April 2024 1.
Globe’s ordinary shares will continue to trade on the ASX under the ticker symbol “GBE”.
Cross-trading in the European capital markets will assist overseas investors to participate in the Globe
story as it progresses the development of the Kanyika Niobium Project. The cross-listings follow the
reactivation approval of Globe’s Legal Entity Identifier (LEI) number and will provide the Company with
access to a deep pool of new potential investors that will help expand the Company’s shareholder base,
increase liquidity, and introduce Globe to a wider audience across Europe.
Paul Smith, Globe’s Chief Operating Officer, commented: “The LEI reactivation will facilitate increasing
the international profile of Globe, while providing the full range of the European investment community
with an opportunity to invest in the Company”.
FSE information on Globe can be found on the Börse Frankfurt website at:
https://www.boerse-frankfurt.de/equity/globe-metals-mining-ltd.
The FSE is one of the world’s largest international trading centres for securities. Operated by the
Deutsche Börse Group, FSE is the largest of Germany’s 8 stock exchanges, and is responsible for
approximately 90 percent of all securities traded in Germany. Globe’s FSE listing will facilitate the
process of trading in its shares by investors in Europe and internationally and enables cross-border
trading for international investors.
The Tradegate Exchange is a German electronic securities exchange founded in 2009 and based in
Berlin that specialises in the execution of private investor orders. It was the first German electronic,
over-the-counter trading system for securities with immediate, automatic executions linked to an
information platform on the Internet for private investors.
Tradegate is a fully regulated exchange and provides access to the world’s leading trading venue for
private investors. Trading hours are from 8:00am to 10:00pm Central European Time every trading day.
1 Refer to ASX Announcement titled ‘Globe appoints strategic investor relations partner in Europe’ made on 4
April 2024
The stock exchange prices are determined by the electronic trading system ‘Tradegate’ with the
support of specialists who provide sufficient liquidity for trading.
In addition to FSE and the Tradegate Exchange, Globe has activated cross-listings on the Berlin Stock
Exchange (BER), The Hamburg Stock Exchange (HAM), and The Stuttgart Stock Exchange (SWB).
Authorisation for Release
This announcement was authorised for release by Globe’s Chief Operating Officer, Paul Smith.
For further information, please contact:
Paul Smith
Chief Operating Officer
+61 8 6118 7240
paul.smith@globemm.com
Charles Altshuler
Chief Financial Officer
+61 8 6118 7240
ca@globemm.com
About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the regional centre of
Kasangu and is secured by Large-Scale Mining Licence No. LML0216/21 which grants the Company security of
tenure and the right to mine niobium, tantalum, and deleterious uranium.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have defined the extent of
mineralisa�on. Structured and progressive engineering studies have resulted in the current (JORC 2012) Mineral
Resource Es�mate (refer below) and given rise to significant improvements and simplifica�ons in the process
flowsheet.
2
The Kanyika opera�ons will produce a pyrochlore mineral concentrate that contains both niobium and tantalum in
commercially valuable volumes to be shipped to a refinery for advanced processing into high purity materials.
A Mineral Resource Es�mate for the Kanyika Niobium Project under the 2012 JORC guidelines was reported to
ASX on 11 July 2018 as follows:
Table 1: MRE for KNP using a 1,500 ppm Nb2 O5 lower cut
Table 2: MRE for KNP using a 3,000 ppm Nb2 O5 lower cut
Category
Resource
(Mt)
Nb2 O5 (ppm)
Ta2 O5 (ppm)
Category
Resource
(Mt)
Nb2 O5 (ppm)
Ta2 O5 (ppm)
Measured
5.3
3,790
180
Measured
3.4
4,790
220
160
Indicated
47
2,860
135
Indicated
16.6
4,120
Inferred
16
2,430
120
Inferred
2.8
4,110
190
TOTAL
68.3
2,830
135
TOTAL
22.8
4,220
190
Kanyika has the poten�al to become the first new globally significant niobium mine in 50 years, with an average
nameplate produc�on of 3,267 tonnes per annum (tpa) of niobium pentoxide, (Nb2O 5) and 136 tpa of tantalum
pentoxide (Ta 2O 5) over the 27-year life of opera�ons. The Nb2O 5 and Ta2O 5 products will be high-specifica�on
high-purity products with grades exceeding 99.5% and 99% respec�vely.
Standard Niobium oxide is being used in the anodes of fast charging bateries (charging to 100% in less than 10
minutes). These bateries have applica�on in large vehicles that cannot afford excessive charging �me. These
include haul trucks, trains, front-end loaders, underground mining machinery, etc. They are also being used in
bateries for handheld tools where fast charging is an advantage.
High purity Niobium is an integral component of daily-use, energy-related, and specialty technologies such as
superalloys (for example, aircra� engines and rocket assemblies), and superconduc�ng magnets (for example,
medical imaging devices and nuclear power genera�on).
The Kanyika Project aims to be a pioneering and environmentally sustainable niobium venture, priori�sing both
innova�on and adherence to ESG principals. It has been shown to be a botom quar�le cost project and is
designed to ensure the produc�on of “green Niobium” in that its Scope 1 and Scope 2 carbon emissions will be of
the lowest in the world, with hydroelectric and solar power domina�ng its power sources for both the mine site
and the refinery. The very low carbon footprint is also supported by a unique closed-cycle Chlorina�on refining
process, which is transforma�ve for the industry.
Mineral Resource Es�mates
The informa�on in this report that relates to Mineral Resources is extracted from the report �tled “Kanyika
Niobium Project – Updated JORC Resource Es�mate” released to the Australian Securi�es Exchange (ASX) on 11
July 2018 and available to view at www.globemm.com and for which Competent Persons’ consents were
obtained. Each Competent Person’s consent remains in place for subsequent releases by the Company of the
same informa�on in the same form and context, un�l the consent is withdrawn or replaced by a subsequent
report and accompanying consent.
The Company confirms that is not aware of any new informa�on or data that materially affects the informa�on
included in the original ASX announcement released on 11 July 2018 and, in the case of es�mates of Mineral
Resources, that all material assump�ons and technical parameters underpinning the es�mates in the original ASX
announcement con�nue to apply and have not materially changed. The Company confirms that the form and
context in which the Competent Persons’ findings are presented have not been materially modified from the
original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 �tled “Kanyika Niobium Project –
Updated JORC Resource Es�mate” available to view at www.globemm.com.
3
Share your feedback
Discover