Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
Globe Metals & Mining Limited
ABN 33 114 400 609
45 Ventnor Avenue
West Perth WA 6005
ASX: GBE
+61 8 6118 7240
info@globemm.com
globemm.com
ASX Announcement
31 July 2026
Quarterly Activities Report – June 2026 Quarter
During the quarter, Globe Metals & Mining Limited completed the Bankable
Feasibility Study for the Kanyika Niobium Project, confirming robust project
economics and a 24-year mine life. The Company also continued to advance project
development, permitting and community resettlement while engaging with strategic
partners and funding providers.
Highlights
▪ Kanyika Niobium Project Bankable Feasibility Study Confirms Strong Project
completed, confirming:
o Strong Economics: Post-tax NPV of US$1.0bn, IRR of 48%, and
average annual EBITDA of US$205m
o Long-Life, Large-Scale Asset: 24-year mine life with first production
targeted in 2028
o High Margin Project: 72% gross margin and ~US$7.0bn LOM net
revenue
o Low-Cost Position: Operating costs of US$14.26/kg Nb₂O₅, placing the
project in the lowest cost quartile
o Phased Development Strategy: Low initial capex (US$139m) with
scalable expansion to full production
▪ Post quarter end Green Energy exercised 9,249,497 options, representing
total exercise proceeds of A$638,215.
▪ Community engagement and resettlement planning continued during the
quarter, with compensation payments expected to commence next quarter.
▪ Following completion of the BFS, the Company continued to advance project
development while progressing discussions with potential strategic partners
and funding providers.
▪ Cash at bank at the end of the June 2026 quarter was $2.78 million (31 March
2026: $4.20 million).
Globe Metals & Mining Limited (ASX: GBE) (Globe or Company) is pleased to
announce its Appendix 5B cashflow report for the quarter ended 30 June 2026 (Q4
FY26), together with the following operational update.
During the quarter, the Company completed the Bankable Feasibility Study (BFS) for
the Kanyika Niobium Project, confirming robust project economics, a 24-year mine
life and a phased development strategy. The Company also continued to advance
detailed project development activities, including permitting, technical optimisation,
community resettlement and engagement with potential strategic partners and
funding providers to support the Project's development. Community consultation and
relocation planning continued throughout the quarter, with compensation payments
expected to commence next quarter. Market fundamentals for both niobium and
tantalum remained supportive, with increasing global demand and tantalum prices
significantly exceeding the assumptions adopted in the Kanyika BFS.
Globe’s Interim Chief Executive Officer, Charles Altshuler, commented:
"The June 2026 quarter marked a significant milestone for Globe with the completion
of the Bankable Feasibility Study for the Kanyika Niobium Project. The BFS confirms
Kanyika as a globally significant critical minerals project with robust economics, a
long mine life and a clear pathway to development.
During the quarter, we continued to advance key project workstreams, including
permitting, technical optimisation, community resettlement and engagement with
potential strategic partners and funding providers to support the phased
development of the Project. These activities reflect our continued focus on
progressing Kanyika in a disciplined and responsible manner.
It is also encouraging to see the continued strengthening of global niobium and
tantalum markets, particularly the significant increase in tantalum prices, which
further reinforces the strategic value of the Kanyika Project. Together with our
ongoing development activities, we believe Globe is well positioned to continue
advancing Kanyika towards becoming one of the world's next major sources of
niobium and tantalum."
Corporate and Financing Update
Under the Company's A$8.67 million two-tranche placement completed in late 2025,
Globe issued 190,000,000 free-attaching options as follows:
• 152,560,000 options were issued to Avocado Trading Limited; and
• 37,440,000 options were issued to Suitable Pioneer Limited.
The options were issued on the basis of approximately 1.12 options for every
placement share subscribed, had an exercise price of A$0.069 per option, and were
due to expire one year from the date of issue. The options were non-listed but
transferable.
Subsequent to their issue, Avocado Trading Limited and Suitable Pioneer Limited
transferred all of their options to Hong Kong Green Energy Industrial Co., Ltd (Green
Energy). As Green Energy became the registered holder of the options, it acquired
the right to exercise them in accordance with their terms.
Post quarter end, Green Energy exercised 9,249,497 options, representing total
exercise proceeds of A$638,215.
Green Energy is a Hong Kong-based clean energy and infrastructure company that
provides integrated engineering, procurement, construction and energy solutions. Its
capabilities include solar photovoltaic systems, battery energy storage systems,
diesel and gas power generation, wind power generation, and hybrid microgrid
solutions. The company offers end-to-end services encompassing project design,
engineering, manufacturing, construction, logistics, commissioning, operation and
maintenance. The company is also developing and pursuing renewable energy and
infrastructure opportunities in Africa as part of its international expansion
strategy.
Kanyika Niobium Project – Bankable Feasibility Study
During the quarter, the Company completed the BFS for the Kanyika Niobium Project
in Malawi, representing a major milestone in advancing the Project towards
development (refer to the ASX announcement dated 1 April 2026, the Company
confirms that all material assumptions underpinning the BFS continue to apply and
have not materially changed).
The BFS confirms Kanyika as a globally significant, long-life critical minerals project,
supported by a Probable Ore Reserve of 33.8 million tonnes grading approximately
3,050 ppm Nb₂O₅ and 142 ppm Ta₂O₅. The Ore Reserve underpins an estimated
mine life of approximately 24 years and forms the basis of a phased development
strategy designed to optimise capital deployment while supporting long-term
production growth.
The study demonstrates robust project economics, including a post-tax Net Present
Value (8%) of approximately US$1.025 billion, a post-tax Internal Rate of Return of
48%, and a payback period of approximately 43 months from first production.
Average annual EBITDA is forecast at approximately US$205 million, with average
annual free cash flow of approximately US$122 million and life-of-mine net revenue
of approximately US$6.98 billion.
The proposed operation comprises an integrated mine, concentrator and refinery,
processing approximately 1.4 million tonnes of ore per annum at steady state.
Average annual refined production is forecast at approximately 3,300 tonnes of
niobium pentoxide (Nb₂O₅) and 149 tonnes of tantalum pentoxide (Ta₂O₅), with total
life-of-mine production of approximately 79,500 tonnes of Nb₂O₅ and 3,565 tonnes of
Ta₂O₅.
The BFS also confirms Kanyika's competitive operating cost position, with forecast
net operating costs of approximately US$14.26/kg Nb₂O₅ (after tantalum credits),
supported by favourable mineralogy, efficient metallurgical recoveries, integrated
downstream refining and the planned utilisation of renewable power solutions. Total
project capital is estimated at approximately US$392 million, comprising an initial
development phase of approximately US$139 million followed by expansion capital of
approximately US$253 million.
Following completion of the BFS, the Company continued to advance detailed
development planning, permitting activities, technical optimisation and community
resettlement programmes. The completion of the BFS has also enabled the Company
to continue engaging with potential strategic partners and funding providers
regarding the development of the Kanyika Project. These discussions form part of the
Company's broader project financing strategy to support the phased development of
the Project. The Company will continue to update shareholders as material
developments occur in accordance with its continuous disclosure obligations.
Community Engagement and Resettlement Planning
During the quarter, ongoing stakeholder engagement included participation in the
Project Affected Person (PAP) assessment and relocation sensitisation meetings,
aimed at ensuring transparent communication of the resettlement process and
alignment with affected communities. The sessions covered key aspects including
the compensation methodology, relocation planning and stakeholder rights.
Compensation payments are expected to commence during the next quarter,
marking a significant milestone in the implementation of the resettlement programme.
The Board will continue to keep shareholders informed of progress and provide
further updates as key milestones are achieved over the coming weeks.
Quarterly Market Update
Niobium and Tantalum Market Update – Quarter Ended 30 June 2026
The June 2026 quarter saw continued strengthening in global niobium and tantalum
markets, driven by increasing demand from advanced electronics, semiconductors,
artificial intelligence infrastructure, aerospace, defence and other critical technology
sectors. According to Asian Metal, tantalum pricing remained particularly strong, with
99.99% tantalum oxide reported at approximately US$680,000 per tonne,
significantly above the US$264,000 per tonne assumption used in the March 2026
Kanyika BFS.
Asian Metal data also demonstrated the strength of the tantalum market during the
quarter. China's exports of tantalum powder increased 111.1% year-on-year in May
2026, with average export prices of approximately US$640,792 per tonne and some
shipments achieving between US$680,000 and US$690,000 per tonne. Japan's
exports of tantalum bar, rod and powder increased 96.0% year-on-year in April 2026,
with average realised prices exceeding US$662,000 per tonne.
The niobium sector also recorded strong growth during the quarter. Asian Metal
reported that Chinese niobium oxide producers sold approximately 790 tonnes of
niobium oxide during May 2026, compared with 535 tonnes during the corresponding
period in 2025, representing 47.66% year-on-year growth and 22.48% month-on-
month growth. For the first five months of 2026, cumulative sales totalled 3,257
tonnes, compared with 2,464 tonnes in the same period of 2025, representing growth
of 32.18% year-on-year.
Inventory levels also increased substantially. Asian Metal reported Chinese niobium
oxide inventories of approximately 580 tonnes in April 2026, compared with 275
tonnes a year earlier, representing growth of 110.91% year-on-year. Average
inventories for the first four months of 2026 were approximately 590 tonnes,
compared with 267.5 tonnes during the corresponding period of 2025, an increase of
120.56% year-on-year. The simultaneous increase in both inventories and sales
suggests producers are positioning themselves for continued growth in demand from
steel, battery materials, advanced alloys and emerging technology applications.
International trade data reported by Asian Metal also reflected strong global demand
for critical minerals. During April 2026, Brazil's exports of tantalum, niobium and
vanadium ores increased approximately 150% year-on-year, while export values
increased more than 400% year-on-year, highlighting the growing importance of
these commodities to global supply chains.
Overall, June quarter market developments continued to reinforce the strategic
importance of both tantalum and niobium. Strong demand growth, increasing supply-
chain security concerns, expanding technology applications and rising government
focus on critical minerals continue to support favourable long-term fundamentals for
both commodities. For Kanyika, the current tantalum pricing environment in particular
highlights the potential for tantalum to contribute materially greater value to future
project economics than was contemplated in earlier feasibility assumptions.
Cash position
At the end of the June 2026 quarter, the Company had debt (included accrued
interest) of $Nil (31 March 2026: $Nil) and held cash of $2.78 million (31 March 2026:
$4.20 million).
ASX additional information
ASX Listing Rule 5.3.1: There were no substantive mining exploration activities during
the quarter. Work was confined to evaluation. The Company expended approximately
$726,000 on evaluation activities (refer section 2.1(d) of Appendix 5B).
ASX Listing Rule 5.3.2: There were no substantive mining production and
development activities during the quarter.
ASX Listing Rule 5.3.5: A total of $92,000 was paid to related parties during the
quarter comprising Non-Executive Directors’ fees (including superannuation).
Shareholding information
At 30 June 2026, shares on issue totalled 937,909,228.
The number and distribution of holders at 30 June 2026 was:
Holding Ranges Holders Holding % IC
above 0 up to and including 1,000 47 1,700 0.00%
above 1,000 up to and including 5,000 41 136,484 0.01%
above 5,000 up to and including 10,000 73 594,076 0.06%
above 10,000 up to and including 100,000 278 11,980,486 1.28%
above 100,000 131 925,196,482 98.64%
Totals 570 937,909,228 100.00%
Top 20 holders at 30 June 2026
Position Holder Name Holding % IC
1 APOLLO METALS INVESTMENT
COMPANY LIMITED
351,405,158 37.47%
2 AVOCADO TRADING LIMITED 136,500,000 14.55%
3 TRIPLE TALENT ENTERPRISES LTD 125,621,035 13.39%
4 AO-ZHONG INTERNATIONAL MINERALRE
SOURCES PTY LTD
118,143,062 12.60%
5 SUITABLE PIONEER LIMITED 33,500,000 3.57%
6 MS JENNIFER CHING PING 17,063,845 1.82%
7 BNP PARIBAS NOMINEES PTY LTD
<CLEARSTREAM>
16,533,445 1.76%
8 PATRAS CAPITAL PTE LTD 14,000,000 1.49%
9 MR COLIN ROBERT SEARL &
MRS CYNDA SEARL
12,349,888 1.32%
10 BNP PARIBAS NOMINEES PTY LTD
<IB AU NOMS RETAILCLIENT>
12,320,638 1.31%
11 CITICORP NOMINEES PTY LIMITED 12,165,124 1.30%
12 BNP PARIBAS NOMS PTY LTD 8,609,153 0.92%
13 C & CR SUPERCO PTY LTD
<C & CR SEARL SUPERFUND A/C>
5,451,295 0.58%
14 BENRET PTY LTD
<COLIN SEARL FAMILY A/C>
4,526,263 0.48%
15 MR RICHARD ULRICK &
MRS WENDY ULRICK
<ULRICK SUPER FUND A/C>
3,934,439 0.42%
16 GOENG INVESTMENTS PTY LTD
<GOENG PENSION FUND A/C>
3,858,697 0.41%
17 HSBC CUSTODY NOMINEES
(AUSTRALIA) LIMITED - A/C 2
3,042,844 0.32%
18 GOTHA STREET CAPITAL PTY LTD
<BLUE SKY NO 2 A/C>
2,707,753 0.29%
19 MR BAHRAM REZAEI 2,550,000 0.27%
20 MR KELLY PETER BODMAN 2,520,562 0.27%
Total 886,803,201 94.55%
Total issued capital 937,909,228 100.00%
Schedule of mineral tenements at 30 June 2026
Country Project Type Status Tenement Interest held by Globe Africa
30 June 2026 31 March 2026
Malawi Kanyika
Mining
Licence
Granted LML0216/21* 100% 100%
There were no tenements acquired or disposed of during the quarter.
* Pursuant to the Mines and Minerals Act, the Malawi Government is entitled to a 10%
free equity interest in LML0216/21 subject to formally notifying Globe Africa of its
desire to take up its entitlement. As at the date of this report, neither the Company
nor Globe Africa has received any such notice.
Authorisation for release
This report was authorised for release by the Board of Directors.
For further information, please contact:
Globe Metals & Mining Limited
Charles Altshuler
Interim Chief Executive Officer
P: +61 8 6118 7240
E: ca@globemm.com
About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of
the regional centre of Kasangu and is secured by Large-Scale Mining Licence No.
LML0216/21 which grants the Company security of tenure and the right to mine niobium,
tantalum, zirconium and other minor metals.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have defined the
extent of mineralisation. Structured and progressive engineering studies have resulted in the
current (JORC 2012) Mineral Resource Estimate (refer below) and given rise to significant
improvements and simplifications in the process flowsheet.
The Kanyika Project will be developed in phases, substantially de-risking the project. The
project will be fully integrated on the mine site – Mining, Concentration and Refining, to
produce high-purity, high-value Niobium and Tantalum oxides for direct export to international
markets.
A Mineral Resource Estimate for the Kanyika Niobium Project under the 2012 JORC
guidelines was reported to ASX on 11 July 2018 as follows:
Mineral Resource Estimates
The information in this report that relates to Mineral Resources is extracted from the report titled
“Kanyika Niobium Project – Updated JORC Resource Estimate” released to the Australian Securities
Exchange (ASX) on 11 July 2018 and available to view at www.globemm.com and for which Competent
Persons’ consents were obtained. Each Competent Person’s consent remains in place for subsequent
releases by the Company of the same information in the same form and context, until the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the
information included in the original ASX announcement released on 11 July 2018 and, in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters underpinning
the estimates in the original ASX announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Persons’ findings are presented
have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 titled “Kanyika Niobium
Project – Updated JORC Resource Estimate” available to view at www.globemm.com.
Table 1: MRE for KNP using a 1,500 ppm Nb2O5 lower cut Table 2: MRE for KNP using a 3,000 ppm Nb2O5 lower cut
Category
Resource
(Mt)
Nb2O5 (ppm) Ta2O5 (ppm) Category
Resource
(Mt)
Nb2O5 (ppm) Ta2O5 (ppm)
Measured 5.3 3,790 180 Measured 3.4 4,790 220
Indicated 47 2,860 135 Indicated 16.6 4,120 160
Inferred 16 2,430 120 Inferred 2.8 4,110 190
TOTAL 68.3 2,830 135 TOTAL 22.8 4,220 190
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
GLOBE METALS & MINING LIMITED
ABN Quarter ended (“current quarter”)
33 114 400 609 30 June 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (309) (1,022)
(e) administration and corporate costs (340) (1,529)
1.3 Dividends received (see note 3) - -
1.4 Interest received 21 56
1.5 Interest and other costs of finance paid (38) (221)
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material)
(a) Exploration and evaluation
payments for assets disposed
(b) Insurance recoveries
-
-
-
-
-
-
1.9 Net cash from / (used in) operating
activities
(666) (2,716)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment (19) (26)
(d) exploration & evaluation (726) (1,745)
(e) investments - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
(f) other non-current assets - -
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other - funds from joint ventures - -
2.6 Net cash from / (used in) investing
activities
(745) (1,771)
3. Cash flows from financing activities
- 8,670
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(6) (346)
3.5 Proceeds from borrowings - 818
3.6 Repayment of borrowings - (2,372)
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other – operating lease payments - -
3.10 Net cash from / (used in) financing
activities
(6) 6,770
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
4,196 496
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(666) (2,716)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(745) (1,771)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
(6) 6,770
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (12
months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
2,779 2,779
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances (includes cash from assets
held for sale)
1,366 977
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (term deposits) 1,413 3,219
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,779 4,196
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
92
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Payments relate to Director’s fees and their associates
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at quarter
end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest rate, maturity
date and whether it is secured or unsecured. If any additional financing facilities have been entered into
or are proposed to be entered into after quarter end, include a note providing details of those facilities as
well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (666)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(726)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (1,392)
8.4 Cash and cash equivalents at quarter end (item 4.6) 2,779
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 2,779
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
2.0
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer:
N/A
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:
N/A
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:
N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 31 July 2026.............................................................................
Authorised by: .........By the Board ..........................................................................
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.