Investor Presentation - 121 Mining Investment Conference
Released
Released
Announcement PDF
Globe Metals & Mining Limited
ABN 33 114 400 609
45 Ventnor Avenue
West Perth WA 6005
ASX: GBE
+61 8 6118 7240
info@globemm.com
globemm.com
ASX Announcement
5 February 2024
Investor Presentation – 121 Mining Investment Conference
Attached is a copy of the Investor Presentation that will be presented by Globe at the 121 Mining
Investment Conference being held on 5 and 6 February 2024 in Cape Town, South Africa.
This announcement was authorised for release by Paul Hardie, Company Secretary.
For further information, please contact:
Grant Hudson
Chief Executive Officer
+61 8 6118 7240
gh@globemm.com
Paul Smith
Chief Operating Officer
+61 8 6118 7240
paul.smith@globemm.com
An emerging
vertically-integrated
niobium producer.
121 Investor Conference - February 2024
Grant Hudson
Chief Executive Officer
Paul Smith
Chief Operating Officer
ASX: GBE | globemm.com
Charles Altshuler
Chief Financial Officer
Disclaimer
This Presentation has been prepared by Globe Metals & Mining Limited ABN 33 114 400 609
(Globe or the Company).
The information in this Presentation is an overview and does not contain all information necessary for
making investment decisions. In making investment decisions, investors should rely on their own
examination of the Company and the Kanyika Niobium Project and consult their own legal, technical,
business and/or financial advisers. The information contained in this Presentation has been prepared in
good faith by Globe, however no representation or warranty expressed or implied is made as to the
accuracy, correctness, completeness or adequacy of any statements, estimates, options, or other
information contained in this presentation. To the maximum extent permitted by law, Globe, its
Directors, officers, employees and agents disclaim liability for any loss or damage which may be
suffered by any person relying on anything contained in or omitted from this Presentation.
Certain information in this Presentation may refer to the intentions of Globe with respect to the Kanyika
Niobium Project, but these are not intended to be forecasts, forward looking statements or statements
about the future matters for the purposes of the Corporations Act or any other applicable law. The
occurrence of the events in the future are subject to risk, uncertainties and other actions that may cause
Kanyika Niobium Project’s actual results, performance or achievements to be materially different from
the results, performance or achievements implied by the forward-looking statements.
Such factors include, but are not limited to, general economic, market and business conditions, market
prices for niobium and tantalum, demand for niobium and tantalum, niobium and tantalum supply,
obtaining additional debt and equity funding (as required), concluding of off-take agreements, obtaining
of all necessary permits for development and production as and when required, estimation of resources
and reserves, development and production costs, processing recoveries transportation delays and
costs, risks and uncertainties related to construction and commissioning, delays in construction of the
mining and processing operations, accidents, equipment breakdowns, title matters, labour disputes,
environmental issues and local community issues involving relocation of project affected people or other
unanticipated difficulties with, or interruptions in, development or production, exchange rate fluctuations,
and risks and uncertainties associated with doing business in Africa.
An emerging vertically-integrated niobium producer.
In addition, there may be information herein that is information about prospective results of operations,
financial position or cash flows and which is provided only to assist in an evaluation of the Kanyika
Niobium Project outlined herein but are not to be relied upon as accurate representations of future
results and may not be appropriate for any other purpose.
This Presentation contains certain forward-looking statements and comments about future matters.
Forward-looking statements can generally be identified using forward-looking words such as, “expect”,
“anticipate”, “likely”, “intend”, “should”, “could”, “may”, “predict”, “plan”, “propose”, “will”, “believe”,
“forecast”, “estimate”, “target” “outlook”, “continue”, “guidance” and other similar expressions. The
forward-looking statements including statements regarding our intent, belief or current expectations with
respect to Kanyika Niobium Project’s performance, market, political, social and environmental
conditions, additional feasibility work, improvements and updates, project configuration, construction
and commissioning costs and timelines, and general risks and uncertainties. Readers are cautioned not
to place reliance on these forward-looking statements. While due care has been used in the preparation
of forecast information, actual results may vary in a materially positive or negative manner.
Any such statements, targets, opinions and estimates in this Presentation speak only as of the date
hereof and are based on assumptions and contingencies subject to significant uncertainties or change
without notice. Forecasts and hypothetical examples are subject to uncertainty and contingencies often
outside Globe’s control. The information in this presentation is current as at the date of the publication of
this presentation.
There can be no assurance that actual outcomes will not differ materially from these forward-looking
statements. Except as required by law or regulation (including the ASX Listing Rules), Globe undertakes
no obligation to supplement, revise or update forward-looking statements in the future, regardless of
whether new information, future events or results or other factors affect the information contained in this
Presentation.
ASX GBE |
2
Investment
Highlights
This bottom quartile cost project has been designed to ensure the production of "green Niobium" in
that its Scope 1 and Scope 2 carbon emissions will be of the lowest in the world, with hydroelectric
and solar power dominating its power sources. The very low carbon footprint is also supported by a
unique closed-cycle Chlorination refining process, which is transformative for the industry.
01
03
02
Second vertically
integrated niobium
oxide player in the
world.
05
Rapidly growing
global demand for
high purity Niobium
Oxide
Major low-cost
resource of Niobium
in a conflict free zone
Worldwide
exclusivity on
environmentally
friendly refining
process.
An emerging vertically-integrated niobium producer.
Attractive Project IRR of 47% and
NPV of US$1 billion
08
07
06
De-risked and
phased project
start-up.
04
Niobium is number
3 on the US critical
metal list.
Fully permitted,
advanced staged
project.
ASX GBE |
3
Corporate snapshot
ASX GBE
Share price
Market capitalisation
Debt
Shares on issue
Cash
Various options
$A0.037
A$25m
A$ Nil
675.9m
A$3.4m
22m
2 February 2024
2 February 2024
31 January 2024
31 January 2024
31 December 2023
31 January 2024
52 week high $0.11, low $0.033
Share register
ASX Share
price
performance
($A)
Figures shown are approximate as at 31 January 2024
52.0% Apollo Metals Investment
12 months to 31
January 2024
20.3% Retail | Others
17.5% Ao-Zhong International Minerals Pty Ltd
10.3% Triple Talent Enterprises
An emerging vertically-integrated niobium producer.
ASX GBE |
4
Kanyika Niobium Project
Malawi, Africa
Malawi is a conflict free, democratic country underpinned by
its 2022-2027 mining strategic plan where mining will be the
main contributor to the sustainable socio-economic growth
and development of the country.
Figure 2: Production, processing and refining in Malawi.
Figure 1. Signing ceremony for the Mining Development Agreement
b etween the Glob e and Malawi Government : 29 March 2023
An emerging vertically-integrated niobium producer.
Shovel-ready, fully permitted, advanced staged project covered by a
Mining Development Agreement, Mining Licence, and all
environmental and land approvals required to immediately start
construction.
ASX GBE |
5
Large resource base
and long mine life
Potentially, the first globally significant
niobium mine in 50 years.
Mineral Resources
Measured
Indicated
Inferred
Total
5.3Mt
47Mt
16Mt
68.3Mt
180ppm Ta2O 5
954t Contained Ta2O 5
135ppm Ta2O 5
6,345t Contained Ta 2O 5
120ppm Ta2O 5
1,920t Contained Ta2O 5
135ppm Ta2O 5
9,219t Contained Ta2O 5
Proved
Probable
Total
• Contains pyrochlore and zircon
mineralisation in disseminated zones
5.3Mt
28.5Mt
33.8Mt
• Niobium and tantalum mineralisation occurs
within the mineral pyrochlore
171ppm Ta2O 5
906t Contained Ta2O 5
136ppm Ta2O 5
3,876t Contained Ta 2O 5
141ppm Ta2O 5
4,782t Contained Ta 2O 5
3,770ppm Nb2O 5
19,981t Contained Nb2O 5
2,860ppm Nb2O 5
134,420t Contained Nb2O 5
2,430ppm Nb2O 5
38,880t Contained Nb2O 5
2,830ppm Nb2O 5
193,281t Contained Nb2O 5
Ore Reserves
3,680ppm Nb2O 5
19,504t Contained Nb2O 5
2,930ppm Nb2O 5
83,505t Contained Nb2O 5
3,048ppm Nb2O 5
103,009t Contained Nb2O 5
An emerging vertically-integrated niobium producer.
• High-grade mineralisation features
pyrochlore bands associated with zircon
ASX GBE |
6
Kanyika Project Development plan update
Metallurgical
Test-work
Q1 2024
Confirmation of product
specification.
Pilot plant
Q2 2024
Project Phase 1
Capital Raise 1: FEED
Capital Raise 2 for Phase One Capital Raise 3 for Phase Two
US$5m*
U$30m*
US$250m
Q3 2024
Q4 2024
Execution Phase 1
(First production
expected Q4 2025)
2027
Execution Phase 2
Mine concentrate
Mine concentrate
Pilot plant construction &
operation
• Refining test-work on
Kanyika concentrate
• Construct and operate
Pilot Plant
• Confirm extraction and
recovery of high purity
Nb and Ta oxides
• Product samples to
potential off-takers (Nb
and Ta)
• Define Pilot Plant
design criteria
• Establish design and
operating parameters
for large-scale
chlorination refinery
• Undertake pilot plan
design modelling highpurity
DFS update & FEED
• Update feasibility study to include
the phased development of
operations and the chlorination
refining technology;
• Confirm offtake agreements for
niobium oxide and tantalum oxide
plus minor metals
An emerging vertically-integrated niobium producer.
2,000tpa
Project Phase 2
18,000tpa
Refined Niobium oxide
Refined Niobium oxide
313tpa
3,155tpa
ASX GBE |
7
Kanyika Project – Optimisation results relative to the 2021 DFS
Change in refining technology to the Chlorination process, which is more environmentally
sustainable, cost-effective and produces high purity products, attracting premium prices.
01
02
03
Optimisation of the milling and concentration
circuits:
The use of chlorination technology in Malawi for
the refining of high-purity metal oxides rather
than the HF Acid process in the UAE:
Financial impact:
1)
Robust NPV and IRR retained. Pre -tax NPV
US$1.004Bn and IRR of 47.1%.
The high-purity Niobium oxide products will be sold
into the speciality metals markets, realising premium
prices over the ferro-niobium market.
2)
Life of mine extended by 4 years due to smaller
Phase 1 start.
3)
Total unit cost gross profit margin increases by
5% to 71%.
4)
A realistic tax rate was assumed for Malawi (a
UAE-based effective tax rate of 3% was deemed
unreasonable).
Replacement of SAG mill with the EDS horizontal multishaft mill
1)
Redesign of the two-stage flotation circuit to a
single stage, and the reduction of flotation
reagents to 4 from 12 reagents.
2)
Optimisation of mass pull and recovery of
concentrator
3)
Dry tailings disposal and co-deposition with
mine strip waste material
1)
2)
Covering all Oxide markets from standard grade
to high quality grade with a focus on Optical
grade (99.99%).
Facilitates selling prices in excess of US$50 per
kg.
An emerging vertically-integrated niobium producer.
Realised a 15% improvement in total unit cash
operating cost (per Kg Nb2O5)
Refer to Slide 27 for a detailed Financial analysis.
5)
ASX GBE |
8
Kanyika Project – Optimisation results Phase 1 and Phase 2
Phase 1 operation is c. 6% of Phase 2 in respect of ROM Ore production and 10% in
respect of Nb205 production.
01
02
Phase 1:
Phase 2:
1)
Robust NPV and IRR retained. Pre -tax NPV US$20m and IRR of
32.5%.
1)
Robust NPV and IRR retained. Pre -tax NPV US$984m and IRR of
47.1%.
2)
Planned 3-year Phase 1 with an annual turnover estimated at
US$20m
2)
Planned ramp up after 3 years of Phase 1 with an annual turnover
estimated at US$205m
3)
Low risk and low capital (estimated total capital cost of US$29m) cost
phase 1 mine and concentrator
3)
28% improvement due to scale of total mine and refinery operating
costs
4)
Mine capacity of 86 ktpa ROM, and 1760 tpa of concentrate, for
shipment to the planned Lilongwe refinery (subject to finalisation of
financial incentives with the Government of Malawi).
4)
Mine capacity development to 1.5mtpa and 17.7 ktpa of concentrate
for shipment to the planned Lilongwe refinery (subject to finalisation
of financial incentives with the Government of Malawi).
Refer to Slide 28 for a detailed Financial analysis.
An emerging vertically-integrated niobium producer.
ASX GBE |
9
Kanyika Mine: Phase One
Scaleable start-up operations
Average of 380,000t of mined material including 140,000t of waste mined
per annum at minimum 10tph.
Open pit mining
“Free dig” mining
Load and haul
>
Crushing
Primary jaw and
secondary cone
>
Milling
EDS mill
Ball mill
>
Flotation
Single stage:
Rougher, scavenger and
cleaners
An emerging vertically-integrated niobium producer.
>
Drying
Locally produced
biomass as fuel
>
Concentrate
>
Contains radioactive nuclides
Sale and trucking
Bulk bags loaded
onto flat bed trucks
ASX GBE | 10
Our chlorination technology offers
superior overall ESG potential.
• Positive metallurgical test work
results with an extraction of 99.9%
Benefits of Chlorination
• Confident overall recovery across
the refinery will be 99% comparing
favorably to Globe’s August 2021
feasibility study of 95% based on
the HF process.
•
• Enables production of high-grade
oxides for all markets
•
Dry process – offering a substantial
(CAPEX, OPEX, environmental) advantage
over the previously considered
(HF/H2SO4) process in eliminating
wastewater and effluent monitoring and
treatment.
Revenue generating co-products limit the
effects of downturns in commodity price
cycles.
•
Energy – exothermic upfront extraction process
providing a substantial amount of energy for reutilisation in other process areas or for on-site power
generation.
•
The carbochlorination process involves reacting a
mixture of charcoal and concentrate with gaseous
chlorine. The metal oxides in the ore convert to
chlorides some of which have boiling points below the
900oC reactor temperature. These chlorides leave the
reactor and the gas is systematically cooled down
allowing for the removal of separate metal chlorides.
The separated metal chlorides are then oxidised to yield
high-purity metal oxides.
>
•
Low waste and tailings potential reducing
the burden of environmental bonds,
remediation, and closure liabilities.
•
Facilitating stakeholder buy-in and
attracting appropriate investment and likeminded suppliers, service providers,
clients and end users.
•
On-site reagent generation and recycling
substantially reduces input logistics, costs,
and overall carbon footprint.
Malawi refinery: Phase One- 313t of Niobium Oxide per annum
>
Salt (NaCl):
Electrolysis of salt to
produce chlorine
+
Concentrate and
chlorine gas:
Chlorine is recycled from oxidation and
reduction
>
>
>
Chlorination reactor:
Distillation and purification:
Metals converted to gaseous chlorides at
high temperature
Very high purity >99% achievable
in batch distillation
Selective cooling gives primary separation
of metal chlorides
An emerging vertically-integrated niobium producer.
High grade niobium (and other)
metal oxides and powders:
Regenerated chlorine is
recycled back to the chlorinator
ASX GBE | 11
Niobium has many applications
in the New Economy
In addition to ferroniobium’s (65%
niobium) use in in the production of
High Strength Low Alloy (HSLA) steel.
Aerospace
MRI
Optical
Glass
Super
Conductor
Nuclear
(SMR)
Thermo
Power
EV Batteries
Capacitors
Niobium alloys NiNb
and Vacuum Grade,
are used in aerospace
and defense industries,
due to their high
strength, low density,
and resistance to high
temperatures.
Niobium oxide is used
for ophthalmic lenses
having high refractive
indices, because it
combines the
advantages of high
refractive index and
relatively low value of
specific gravity for a
glass.
Niobium oxide is used
for ophthalmic lenses
having high refractive
indices, because it
combines the
advantages of high
refractive index and
relatively low value of
specific gravity for a
glass.
Niobium metal can be
used as
superconductors in
particle accelerators, like
the CERN in Switzerland.
Niobium is used in the
Nuclear industry due to
their high-temperature
strength and resistance
to corrosion, used in
reactor components,
fuel elements and
surface acoustic wave
devices.
Niobium is used in
Ultra Temperature
Thermal Power, due to
high-temperature and
resistance to corrosion,
user in high
temperature pipes.
As the green energy
transition gathers pace,
niobium’s use in
electric vehicle
batteries has the
potential to decrease
charging times,
increase range,
improve battery life and
maximise performance.
Niobium capacitors
can substitute
Tantalum, due to its
stable performance,
reliability level, non
burning high resistance
and high break down
voltage.
CAGR 8.6%
CAGR 6.8%
CAGR 11.1%
CAGR 10.0%
CAGR 15.8%
CAGR 9.1%
Refer Slide 10
CAGR 6.4%
So u r ce: MRI , Optical & Glasses
plus Thermo Power market :
Grand View Research (2023 –
2030)
So u r ce: Allied market research
(2022 – 2032)
So u r ce: Nuclear (SMR) : Allied
market research (2020 -2023)
So u r ce: Aerospace market:
Precision Business Insight
(2022-2028)
An emerging vertically-integrated niobium producer.
So u r ce: Capacitors : Allied
market research (2021 – 2031)
ASX GBE | 12
Batteries are a game-changing
market opportunity in the future
1 Source: https://www.autofutures.tv/topics/how-niobium-makes-batteries-greener--cheaper-and-cleaner---with-insights-from-a -nobel-
prize-winner--/s/7457515b-c647-434f-8877-3132 1e96859 2
2Source: World’s Leading Niobium Anode Battery Materials Supplier (echiontech.com) 2023
3 Source: https://www.global.toshiba/ww/products-solutions/battery/scib/next/nto.html
Niobium oxide makes batteries
greener, cheaper and cleaner.1
Ultra-fast
charging
Niobium oxide batteries can be fully charged in less than
10 minutes
at lower operating temperatures2
Increased
range
Niobium oxide increases the energy density of batteries by
200%
at a lower material cost2
Better
performance
Niobium oxide batteries are more stable and can withstand
10,000
charging cycles2
An emerging vertically-integrated niobium producer.
Toshiba’s Niobium Titanium Oxide (NTO)-SCIB battery can provide a
mileage of up to 320km, reaching 90% capacity after six minutes and
can fast charge to 80% capacity after 25,000 cycles.3
ASX GBE | 13
Niobium’s main use is
in steel making
Ferroniobium (at 65% niobium) is the
primary saleable form of the metal
and sells for over US$40,000t.
Construction
Automotive and Transport
Ferroniobium is primarily used in the production of High
Strength Low Alloy (HSLA) steel which is used extensively
in the construction and automotive industries and in the
manufacture of high-pressure gas and oil pipelines,
providing extra strength, and greater resistance to heat
and corrosion.
Fast fact
Construction of the Eiffel Tower used
7,300t of wrought iron. Today, it could
be built using 2,000t of HSLA steel
clearly indicating its part in the world’s
decarbonisation goals.
An emerging vertically-integrated niobium producer.
Aerospace and Defence
Oil & Gas
Other
Global ferroniobium sales by sector1
~100,000t/year
~US$3 billion per year2
1 Source: CBMM
2 Niobium Outlook to 2030 Roskill , 2020
ASX GBE | 14
That’s why its at the top of
critical metal list
Niobium is considered critical
not just in Australia but also in
the EU, US, Japan, and India.
Number 3 of 35 on the US Critical metal list critically
ranking.
An emerging vertically-integrated niobium producer.
ASX GBE | 15
Niobium oxide price has increased
17% in the last six months changed
Current niobium oxide (Nb205)
prices are $US54,000t for
99.9% (FOB China).
1
The Nb205 99.9% price has increased by 50% since
2015.
Globe total gross cash cost for (Nb205).
$US18,900t gross cash
margin % = 63%
per 2024 Optimization study for LOM.
1
Source: Asian Metals at 26 January 2024
An emerging vertically-integrated niobium producer.
ASX GBE | 16
Niobium demand will grow
but supply is limited
1 Source: https://www.mining.com/web/niobium- mining-the-first-step-in-building-a-fighter-jet/
2 Source: https://www.mining-technology.com/projec ts/niobec-niobium-mine-quebec/
3 Source:
https://www.researchgate.net/publication/272424460_Niobium_oxide_mineral_flotation_A_review_of_relevant_literature_and_the_current_stat
e_of_industrial_operations
4 Source: https://cbmm.com/en
Three mines account for over
95% of the global mined niobium
supply and no new mines have
been brought into production for
over 50 years.
Global production of niobium (FeNb +Nb 2O5)
~112,000tpa
3
• Excessive dependence on single supplier countries makes
global consumers vulnerable.
• Niobec and Boa Vista only produce ferroniobium. Only CBMM
produces Niobium Oxide used in lithium-ion batteries.
• All three companies use the leach process together with
electric arc furnace which is a carbon intensive process with
significant slag.3
An emerging vertically-integrated niobium producer.
ASX GBE | 17
CBMM is focusing on increasing
niobium oxide production for the
battery market
CBMM, one of the worlds leading
producers of Niobium oxide will
increase capacity over the next 3
years to serve the growing
battery market.
1
• CBMM invest in Eichion, Battery Streak, VW Brazil and
Lighting Motorcycles plus 40 other projects.
• 25% of CBMM’s sales will be for the battery market by
2030.
This strategic move of CBMM allows Globe the
opportunity to enter the highly lucrative specialty mentals
and Niobium oxide markets such as optical grade with
prices more than US$50 per kg.
1 Source: Derived and extrapolated from reports on https://niobium.tech/, https://www.echiontech.com/, https://cbmm.com/en/
An emerging vertically-integrated niobium producer.
ASX GBE | 18
Ideal time and opportunity for
Globe to enter the market.
Question: How do we compete with an established 50-year-old
supply chain? – we do not compete – Globe focuses on the
specialty oxide markets!
02
03
04
05
Low mining cost
Efficient
concentration
Chlorination
refining
Low carbon
footprint
Serving a speciality market
Shallow, open-cast
mining (low mining
costs)
Economic mineral
processing and
optimised oxide
floatation, producing
a c, 20% Nb2O5
concentrate.
Efficient - closed
circuit chlorination
refining technology v
ersus Hydrofluoric
Sulphuric Acid Leach
with Ammonia
Precipitation.
Very low refining
residue (Recovery of
chlorine for reuse).
Globe will not compete in the Ferro-Niobium
market.
01
Globe total cash cost - $US 18,900/t (Nb205).
Cash margin = 63% at current spot prices
(99.99%)
An emerging vertically-integrated niobium producer.
"Dry" refining - no
effluent water.
Low carbon footprint
– making use
of Biomass/
Hydropower
Focused on the high specialty Niobium Oxide
market - fast charging battery market
transport, aero-space, MRI, Optical glass,
Super Conductors Nuclear, Themo Power,
Painting and Coatings and Capacitors.
ASX GBE | 19
Strong ESG Drivers
1 Source: Feasibility of Biogas Production from Napier Grass, The 6th International Conference on Applied Energy – ICAE2014, Vanatpornratt
Sawasdeea and Nipon Pisutpaisal, www.sciencedirect.com
2 Source: https://www.angloamerican.com/media/press-releases/2022/18-03-2022
3 Source: Taulo, John L, Gondwe, Kenneth Joseph, & Sebitosi, Adoniya Ben. (2015). Energy supply in Malawi: Options and issues. Journal of
Energy in Southern Africa, 26(2), 19-32. Retrieved August 01, 2023, from http://www.scielo.org.za/scielo.php
Environment
Social
Community
development
Irrigation
water
Biogas from
biomass1
Solar PV with battery
storage plus Hydro power2
Production
optimisation
Regenerative chlorination
process
• A percentage of turnover will
be spent on projects with
qualified communities within
a 20km radius from the mine
• Globe will build a dam to
divert the river around the
orebody and for freshwater
storage
• The biomass purchased
from the community will be
anaerobically digested to
produce biogas
• Solar power will provide
power to the plant and
charge the battery during
daylight
• Move from two stage
flotation to single stage
• The chlorination process
regenerates and recycles
chlorine
• Training of artisans and
other disciplines will draw
trainees from the Kanyika
environment
• Raising the dam wall will
retain additional water that
will be made available as
irrigation water to local
communities
• Biogas will be used to dry
concentrate
• The battery will be
recharged at night from grid
hydropower (96% of Malawi
grid is hydro)
• Being able to grow two
crops per year is a
significant income
improvement
• Biomethane will replace
60% of the diesel in the
mining fleet
• Biogas will be upgraded to
biomethane
• Globe will install a run-ofriver hydro generator that
will operate during the rainy
season
• Reduction from 12 reagents
to 4
• Single water circuit
• Move from SAG/ball mills to
EDS /spiral/ball mill
• Very low residue volumes
remain
• Dry process means no
effluent water produced
• Early gangue rejection
• Reduced power
consumption
• Lower flotation throughput
An emerging vertically-integrated niobium producer.
ASX GBE | 20
What we look for in
strategic partners
Takes a stake
Equity Investment
1. The listed entity.
2. The project level.
3. Current shareholder
partial buyout.
Then helps us with
Debt funding
Offtake Agreements
Marketing
Operatorship
ESG
1. Assistance with
construction funding
debt packages
through external
providers.
1. At least 25% of
production scaling from
Phase 1 to Phase 2.
1. Working together to
qualify our product in
the relevant market.
1. Management/ Operator
of the mine and refinery.
2. Prepayment to assist
with construction.
2. Marketing/trading rights
on our product.
1. Working together to
achieve net zero and
supply chain
decarbonisation.
2. Debt funding direct
with strategic partner.
An emerging vertically-integrated niobium producer.
2. Member on technical/
operations/ finance
committees.
2. Reporting thereon.
3. Being part of the
marketing arm of the
strategic partner.
ASX GBE | 21
How to join the Globe Metals &
Mining Investor Hub:
Head to:
https://investorhub.globemm.com
/auth/signup
Follow the prompts to sign up for
an Investor Hub account.
Complete your account profile.
Link your shareholdings if you are
a current shareholder.
The QR code below can also be
used to access the Investor Hub .
ASX GBE| globemm.com
Globe Metals & Mining Ltd
ABN 33 114 400 609
ASX:GBE
45 Ventnor Avenue
West Perth WA 6005
Australia
info@globemm.com
+61 8 6118 7240
eNews
Join the conversation
https://twitter.com/GlobeMet
alsASX
Follow us
https://www.linkedin.com/
company/globe-metalsmining-ltd
Subscribe to our e-news:
globemm.com
Appendices
An emerging vertically-integrated niobium producer.
ASX GBE | 23
Competent person’s
statement
Mineral resource estimates:
Ore reserves:
The information in this report that relates to Mineral Resources is extracted from the report titled
“Kanyika Niobium Project – Updated JORC Resource Estimate” released to the Australian Securities
Exchange (ASX) on 11 July 2018 and available to view at www.globemm.com and for which Competent
Persons’ consents were obtained. Each Competent Person’s consent remains in place for subsequent
releases by the Company of the same information in the same form and context, until the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The information in the report that relates to Ore Reserves is extracted from the report titled “Kanyika
Niobium Project – Project Feasibility and Economics” released to the Australian Securities Exchange
(ASX) on 19 August 2021 and available to view at www.globemm.com and for which a Competent
Person’s consent was obtained. The Competent Person’s consent remains in place for subsequent
releases by the Company of the same information in the same form and context, until the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the
information included in the original ASX announcement released on 11 July 2018 and, in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters underpinning
the estimates in the original ASX announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Persons’ findings are presented
have not been materially modified from the original ASX announcement.
The Company confirms that is not aware of any new information or data that materially affects the
information included in the original ASX announcement released on 19 August 2021 and, in the case of
estimates of Ore Reserves, that all material assumptions and technical parameters underpinning the
estimates in the original ASX announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Person’s findings are presented
have n
Share your feedback
Discover