8 October 2026
Annual General Meeting Date and Director Nominations
Globe Metals & Mining Limited (ASX: GBE) (“Globe” or “Company”) announces, in
accordance with ASX Listing Rule 3.13.1, it intends to hold the Annual General Meeting
(“AGM”) of the Company on Friday, 27 November 2026.
An item of business at the AGM will be the re-election of Directors.
In accordance with the Company’s Constitution, the closing date for the receipt of
nominations from persons wishing to be considered for election as a Director is
Thursday, 15 October 2026.
Any nominations must be received in writing (and duly signed) at the Company’s
registered office no later than 5.00pm AWST on Thursday, 15 October 2026.
The Company will announce further details regarding the AGM, including the location,
date and time of the AGM, in a separate notice of meeting which will be provided to
shareholders in due course.
This announcement was authorised for release by the Interim CEO & CFO, Charles
Altshuler
For further information, please contact:
Charles Altshuler
Interim CEO & CFO
P: +61 8 6118 7240
E: ca@globemm.com
About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the
regional centre of Kasangu. The Project is secured by Large-Scale Mining Licence No.
LML0216/21, which grants the Company security of tenure and the right to mine niobium,
tantalum, deleterious uranium, Zircon, Hafnium, Praesidium and Neodymium.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have defined the
extent of mineralisation. Structured and progressive engineering studies have resulted in the
current (JORC 2012) Mineral Resource Estimate (refer below) and given rise to significant
improvements and simplifications in the process flowsheet.
The Kanyika Project will be developed in two phases, substantially de-risking the project. The
project will be fully integrated on the mine site – Mining, Concentration and Refining, to produce
high-purity, high-value Niobium and Tantalum oxides for direct export to foreign markets.
A Mineral Resource Estimate for the Kanyika Niobium Project under the 2012 JORC guidelines
was reported to ASX on 11 July 2018 as follows:
Mineral Resource Estimates
The information in this report that relates to Mineral Resources is extracted from the report titled “Kanyika
Niobium Project – Updated JORC Resource Estimate” released to the Australian Securities Exchange (ASX)
on 11 July 2018 and available to view at www.globemm.com and for which Competent Persons’ consents
were obtained. Each Competent Person’s consent remains in place for subsequent releases by the Company
of the same information in the same form and context, until the consent is withdrawn or replaced by a
subsequent report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the
information included in the original ASX announcement released on 11 July 2018 and, in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the
estimates in the original ASX announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Persons’ findings are presented have
not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2028 titled “Kanyika Niobium
Project – Updated JORC Resource Estimate” avaialble to view at www.globemm.com.
Table 1: MRE for KNP using a 1,500 ppm Nb2O5 lower cut Table 2: MRE for KNP using a 3,000 ppm Nb2O5 lower cut
Category
Resource
(Mt)
Nb2O5 (ppm) Ta2O5 (ppm) Category
Resource
(Mt)
Nb2O5 (ppm) Ta2O5 (ppm)
Measured 5.3 3,790 180 Measured 3.4 4,790 220
Indicated 47 2,860 135 Indicated 16.6 4,120 160
Inferred 16 2,430 120 Inferred 2.8 4,110 190
TOTAL 68.3 2,830 135 TOTAL 22.8 4,220 190