Details of Auditor Appointment/Resignation
Released
Released
Announcement PDF
Globe Metals & Mining Limited
ABN 33 114 400 609
45 Ventnor Avenue
West Perth WA 6005
ASX: GBE
+61 8 6118 7240
info@globemm.com
globemm.com
ASX Announcement
4 July 2023
Change in Auditor
Globe Metals & Mining Limited (ASX: GBE) (“Globe” or “Company”) advises that, in accordance with
ASX Listing Rule 3.16.3, BDO Audit Pty Ltd (BDO) has been appointed as auditor of the Company
effective from the date of this announcement.
The change follows the resignation of Ernst & Young as Globe’s auditor in accordance with section
329(5) of the Corporations Act 2001 (Cth) (Act) and ASIC’s consent to the resignation. The change in
auditor has occurred due to the Company tendering the audit service.
BDO’s appointment is effective until the 2023 Annual General Meeting of the Company. In accordance
with section 327B of the Act, a resolution will be put to shareholders at the 2023 Annual General
Meeting to appoint BDO as auditor of the Company.
Authorisation for Release
This announcement has been authorised for release by the Company Secretary.
For further information, please contact:
Grant Hudson
Chief Executive Officer
+61 8 6118 7240
gh@globemm.com
Paul Hardie
Company Secretary
+61 409 296 276
phardie@globemm.com
About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the regional centre of
Kasangu and is secured by Large-Scale Mining Licence No. LML0216/21 which grants the Company security of
tenure and the right to mine niobium, tantalum, and deleterious uranium.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have defined the extent of
mineralisa�on. Structured and progressive engineering studies have resulted in the current (JORC 2012) Mineral
Resource Es�mate (refer below) and given rise to significant improvements and simplifica�ons in the process
flowsheet, from that first imagined.
In addi�on, Globe has undertaken substan�al metallurgical op�misa�on work and commissioned a pilot plant to
demonstrate and further op�mise metallurgical processes. Metallurgical op�misa�ons studies have improved
recoveries from 62% in 2012 to 75% today, through simple novel patented metallurgical processes.
The Kanyika opera�ons will produce a pyrochlore mineral concentrate that contains both niobium and tantalum in
commercially valuable volumes to be shipped to a refinery for advanced processing into high purity materials.
A Mineral Resource Es�mate for the Kanyika Niobium Project under the 2012 JORC guidelines was reported to
ASX on 11 July 2018 as follows:
Table 1: MRE for KNP using a 1,500 ppm Nb2 O5 lower cut
Table 2: MRE for KNP using a 3,000 ppm Nb2 O5 lower cut
Category
Resource
(Mt)
Nb2 O5 (ppm)
Ta2 O5 (ppm)
Category
Resource
(Mt)
Nb2 O5 (ppm)
Ta2 O5 (ppm)
Measured
5.3
3,790
180
Indicated
47
2,860
135
Measured
3.4
4,790
220
Indicated
16.6
4,120
Inferred
16
2,430
160
120
Inferred
2.8
4,110
190
TOTAL
68.3
2,830
135
TOTAL
22.8
4,220
190
Mineral Resource Es�mates
The informa�on in this report that relates to Mineral Resources is extracted from the report �tled “Kanyika Niobium Project –
Updated JORC Resource Es�mate” released to the Australian Securi�es Exchange (ASX) on 11 July 2018 and available to view
at www.globemm.com and for which Competent Persons’ consents were obtained. Each Competent Person’s consent remains
in place for subsequent releases by the Company of the same informa�on in the same form and context, un�l the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new informa�on or data that materially affects the informa�on included in the
original ASX announcement released on 11 July 2018 and, in the case of es�mates of Mineral Resources, that all material
assump�ons and technical parameters underpinning the es�mates in the original ASX announcement con�nue to apply and
have not materially changed. The Company confirms that the form and context in which the Competent Persons’ findings are
presented have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 �tled “Kanyika Niobium Project – Updated JORC
Resource Es�mate” available to view at www.globemm.com.
2
Share your feedback
Discover