30 April 2026
Quarterly Activities Report – March 2026 Quarter
Kanyika Niobium Project Bankable Feasibility Study Confirms Strong
Project Economics
Highlights
▪ Strong Economics: Post-tax NPV of US$1.0bn, IRR of 48%, and average
annual EBITDA of US$205m.
▪ Long-Life, Large-Scale Asset: 24-year mine life with first production targeted
in 2028.
▪ High Margin Project: 72% gross margin and ~US$7.0bn LOM net revenue.
▪ Low-Cost Position: Operating costs of US$14.26/kg Nb₂O₅, placing the
project in the lowest cost quartile.
▪ Phased Development Strategy: Low initial capex (US$139m) with scalable
expansion to full production.
▪ Early works are advancing across access, site infrastructure and mining
preparation, supporting transition toward construction.
▪ The program is focused on de-risking critical path items and enabling
targeted first production in 2028.
▪ Ongoing PAPs engagement and relocation sensitisation activities progressed
during the quarter, supporting transparent resettlement planning and
community alignment.
▪ Cash at bank at the end of the March 2026 quarter was $4.20 million (31
March 2026: $5.76 million).
Globe Metals & Mining Limited (ASX: GBE) (Globe or Company) is pleased to
announce its Appendix 5B cashflow report for the quarter ended 31 March 2026 (Q3
FY26), together with the following operational update.
This quarter marked a defining step in Globe’s development trajectory, with the
Company progressing workstreams funded from the Q4 2025 capital raise,
culminating in the completion and post-quarter announcement of the Bankable
Feasibility Study (BFS), which confirms the technical feasibility, strong economic
returns and a clear pathway to development for the Kanyika Project.
Globe’s Interim Chief Executive Officer, Charles Altshuler, commented:
“The timing of the BFS is particularly compelling, with niobium and tantalum markets
experiencing strong demand growth and increasing strategic importance driven by
defence, technology and infrastructure sectors. At the same time, supply remains
either highly concentrated or constrained, reinforcing the need for new, reliable
sources.
Kanyika is well positioned within this landscape, offering a rare combination of scale,
low-cost production and a conflict-free supply profile. The BFS validates this
positioning and provides a clear pathway to development.
We are now focused on converting this into execution through funding, offtake and
EPCM agreements, with a targeted Final Investment Decision in 2026 and first
production targeted in 2028.”
Corporate and Financing Update
During the quarter, the Company utilised proceeds from the Q4 2025 financing to
progress final technical workstreams supporting completion of the BFS, which was
subsequently announced following quarter end.
Post-Quarter-End Kanyika Niobium Project – Bankable Feasibility Study
Subsequent to quarter end, the Company announced the completion of the BFS for
the Kanyika Niobium Project in Malawi (refer to ASX announcement dated 1 April
2026), representing a significant milestone in advancing the Project toward
development. The Company confirms that all material assumptions underpinning the
BFS continue to apply and have not materially changed.
The BFS confirms Kanyika as a long-life, large-scale critical minerals project with
robust economic fundamentals. On a 100% basis, the Project delivers a post-tax NPV
(8%) of approximately US$1.025 billion, a pre-tax NPV of US$1.524 billion, and a
post-tax IRR of 48%, with a payback period of approximately 43 months from first
production.
The Project is expected to generate average annual EBITDA of approximately
US$205 million and average annual free cash flow of approximately US$122 million,
supported by average annual net sales revenue of approximately US$291 million and
life-of-mine (LOM) net revenue of approximately US$6.98 billion, delivering a gross
margin of approximately 72% over the life of mine.
The development is underpinned by a Probable Ore Reserve of 33.8 million tonnes,
supporting a ~24-year life of mine, with average grades of approximately 3,050 ppm
Nb₂O₅ and 142 ppm Ta₂O₅.
Production Profile
The BFS outlines a steady-state production profile based on an integrated mining,
concentrator and refinery operation:
• Average annual ore processed: ~1.4 Mtpa
• Total ore processed (LOM): ~33.8 Mt
• Average concentrate production: ~13,200 tonnes per annum
• Average annual contained production:
o ~3,400 tpa Nb₂O₅
o ~156 tpa Ta₂O₅
• Refined product output (LOM average):
o ~3,300 tpa Nb₂O₅
o ~149 tpa Ta₂O₅
• Total LOM production:
o ~79,500 tonnes Nb₂O₅
o ~3,565 tonnes Ta₂O₅
Metallurgical assumptions include approximately 80% recovery in the concentrator
and ~96.5% recovery in the refinery, supporting high overall recoveries and premium
product quality. The Project is designed as a fully integrated mine-to-refinery
operation, enabling value capture across the full processing chain.
Cost and Capital Profile
The Project demonstrates a strong cost position:
• Average net operating cost: ~US$14.26/kg Nb₂O₅ (after tantalum credits)
• Gross margin: ~72%
• Total operating cost (LOM): ~US$1.14 billion (net)
This positions the Project within the lowest quartile of the global cost curve,
supported by favourable geology, strong recoveries, integrated refining and a hybrid
renewable power solution.
Capital requirements are structured on a phased basis:
• Initial phase capital: ~US$139 million
• Expansion capital: ~US$253 million
• Total project capital: ~US$392 million
This phased approach reduces upfront capital intensity and enhances financeability.
Development Strategy and Timeline
The Project will be developed through a phased approach, commencing at
approximately 500ktpa (~33% capacity) and expanding to ~1.5Mtpa full capacity,
subject to market conditions.
The BFS outlines a clear and executable development pathway, with the following
targeted milestones:
• Calendar Q2 2026: Continue project evaluation and advance funding, offtake
and EPCM negotiations. Complete the remaining BFS finalisation activities
and progress early development works, including advancing the technical and
commercial framework required for project execution.
• Q3 2026: Target Final Investment Decision (FID), execute initial funding and
EPCM contracts, commence long-lead procurement activities, and initiate
relocation of affected households associated with the initial phase of
development.
• Q4 2026: Mobilise contractors and site teams and commence initial phase site
works, including site establishment, access roads, camp construction, water
supply infrastructure and temporary power systems.
• Q1 2027 to Q3 2027: Undertake major construction activities, including civil
works, structural steel erection, process plant installation, tailings storage
facility construction and power infrastructure development, together with pre-
strip activities and initial ore exposure.
• Q4 2027: Achieve mechanical completion of major circuits and progress
commissioning preparations.
• Q1 2028: Commence first production and initial revenues, with the Project
targeting positive operating cash flow as the initial phase reaches steady-state
operations.
• Q2 2028 to 2030: Undertake expansion phase construction to increase
throughput and processing capacity toward full-scale operations, subject to
market conditions.
• Early 2030: Achieve full-scale operations following completion of the
expansion phase.
Strategic Positioning
Kanyika is positioned as a globally significant new source of niobium supply, outside
Brazil, within a highly concentrated global market. The Project is expected to supply
into growing demand across aerospace, defence, high-strength steel, AI
infrastructure, data centres and advanced manufacturing applications, while
providing a conflict-free and traceable supply source aligned with increasing
geopolitical focus on supply chain diversification.
Funding and Next Steps
Following completion of the BFS, the Company is progressing a diversified funding
strategy, including engagement with development finance institutions, commercial
lenders, strategic investors and offtake partners.
While a number of funding and offtake arrangements remain non-binding and subject
to customary conditions precedent, the Company considers that the combination of
strong project economics, advanced technical definition, permitting status and
favourable market dynamics provides a solid basis to support project financing.
Pre-Development / Early Works
The Company has advanced a structured pre-development program to support the
transition of the Kanyika Project toward construction readiness.
Key activities completed and underway include:
• Access Road Upgrade
o Planning and design of an initial ~6km access road upgrade to enable
year-round site access
o Scope includes grading, drainage, culverts and placement of
compacted crusher material
o Designed as a staged solution, with upgrade to Life-of-Mine (LOM)
road standard planned in later phases
• Site Establishment (Camp & Office Infrastructure)
o Assessment and selection of preferred locations for early works camp
and permanent accommodation facilities
o Camp design includes:
▪ accommodation units
▪ kitchen and amenities
▪ offices and meeting facilities
▪ water, power and sanitation systems
o Early works camp expected to transition into long-term operational
infrastructure
• Earthworks and Platform Development
o Planning for initial waste mining and bulk earthworks to establish:
▪ plant terraces
▪ ROM pad
▪ supporting infrastructure platforms
o Approximately 280,000 m³ of material identified for initial development
works
o Mine design optimisation undertaken to source material within final pit
limits, minimising additional waste
• Mining Preparation
o Detailed mine planning aligned with staged development schedule
o Early mining activities to include:
▪ clearing and grubbing
▪ haul road development
▪ initial waste stripping
o Targeting:
▪ mining commencement in 2027
▪ first ore to plant in early 2028
• Contractor Engagement
o Engagement with multiple experienced regional contractors for:
▪ civil works
▪ mining operations
▪ infrastructure development
o Tendering and contractor selection processes underway, with focus
on:
▪ capability
▪ regional experience
▪ ability to meet accelerated timelines
• Execution Planning
o Development of a structured project execution schedule, integrating:
▪ early works
▪ mining readiness
▪ infrastructure development
o Focus on de-risking critical path items ahead of construction
Community Engagement and Resettlement Planning
During the quarter, ongoing stakeholder engagement included participation in PAPs
assessment and relocation sensitisation meetings, aimed at ensuring transparent
communication of the resettlement process and alignment with affected communities.
The sessions covered key aspects including compensation methodology, relocation
planning and stakeholder rights.
Further engagement activities are scheduled for the upcoming quarter as part of the
formal resettlement action plan, reinforcing the Company’s commitment to
responsible development and maintaining its social licence to operate.
Quarterly Market Update
Niobium demand increased by approximately 27% year-on-year1
, driven by
continued growth in defence spending, infrastructure development and advanced
manufacturing applications, including increasing utilisation in aerospace alloys, high-
strength steels and emerging AI-related infrastructure. This demand growth is
occurring in the context of a highly concentrated supply base, with the majority of
global niobium production sourced from Brazil, reinforcing the strategic importance
of new, diversified supply sources.
Tantalum has also experienced strong structural growth of approximately 55% year-
on-year1
, supported by sustained demand from electronics, semiconductors,
aerospace and defence applications, where its properties are difficult to substitute.
However, supply remains constrained and increasingly complex, with a significant
portion of global production originating from Central Africa, including regions
1 Source: https://www.asianmetal.com/news/2309811/China's-niobium-oxide-producers'-sales-volume-increased-
27.27-YoY-in-Feb
impacted by instability associated with groups such as M23. As a result, tantalum is
classified as a conflict mineral, and increasing regulatory, ESG and traceability
requirements in Western markets have effectively restricted access to portions of
supply, reducing the availability of compliant, bankable material.
These dynamics, strong and growing demand across both commodities, combined
with either concentrated (niobium) or constrained and fragmented (tantalum) supply,
are contributing to tightening market conditions and supporting a favourable long-
term pricing environment. Importantly, they are reinforcing the strategic importance
of developing secure, diversified and traceable sources of supply, particularly within
stable jurisdictions, which is increasingly a key consideration for end-users,
governments and capital providers.
Cash position
At the end of the March 2026 quarter, the Company remained debt free and held
cash of $4.20 million (31 December 2025: $5.76 million).
ASX additional information
ASX Listing Rule 5.3.1: There were no substantive mining exploration activities during
the quarter. Work was confined to evaluation. The Company expended approximately
$628,000 on evaluation activities (refer section 2.1(d) of Appendix 5B).
ASX Listing Rule 5.3.2: There were no substantive mining production and
development activities during the quarter.
ASX Listing Rule 5.3.5: A total of $79,000 was paid to related parties during the
quarter comprising Non-Executive Directors’ fees (including superannuation).
Globe Metals & Mining Limited
ABN 33 114 400 609
45 Ventnor Avenue
West Perth WA 6005
ASX: GBE
+61 8 6118 7240
info@globemm.com
globemm.com
Shareholding information
At 31 March 2026, shares on issue totalled 937,909,228.
The number and distribution of holders at 31 March 2026 was:
Holding Ranges Holders Holding % IC
above 0 up to and including 1,000 47 1,700 0.00%
above 1,000 up to and including 5,000 36 114,067 0.01%
above 5,000 up to and including
10,000 64 517,978 0.06%
above 10,000 up to and including
100,000 284 12,526,788 1.34%
above 100,000 134 924,748,695 98.60%
Totals 565 937,909,228 100.00%
Top 20 holders at 31 March 2026
Position Holder Name Holding % IC
1 APOLLO METALS INVESTMENT
COMPANY LIMITED
351,405,158 37.47%
2 AVOCADO TRADING LIMITED 136,500,000 14.55%
3 TRIPLE TALENT ENTERPRISES LTD 125,621,035 13.39%
4 AO-ZHONG INTERNATIONAL MINERALRE
SOURCES PTY LTD
118,143,062 12.60%
5 SUITABLE PIONEER LIMITED 33,500,000 3.57%
6 BNP PARIBAS NOMINEES PTY LTD
<CLEARSTREAM>
17,310,710 1.85%
7 MS JENNIFER CHING PING 17,063,845 1.82%
8 PATRAS CAPITAL PTE LTD 14,000,000 1.49%
9 CITICORP NOMINEES PTY LIMITED 12,873,395 1.37%
10 MR COLIN ROBERT SEARL &
MRS CYNDA SEARL
12,349,888 1.32%
11 BNP PARIBAS NOMINEES PTY LTD
<IB AU NOMS RETAILCLIENT>
10,601,093 1.13%
12 BNP PARIBAS NOMS PTY LTD 7,562,852 0.81%
13 BENRET PTY LTD
<COLIN SEARL FAMILY A/C>
5,373,888 0.57%
14 C & CR SUPERCO PTY LTD
<C & CR SEARL SUPERFUND A/C>
4,451,295 0.47%
15 MR RICHARD ULRICK &
MRS WENDY ULRICK
<ULRICK SUPER FUND A/C>
3,934,439 0.42%
16 GOENG INVESTMENTS PTY LTD
<GOENG PENSION FUND A/C>
3,858,697 0.41%
17 HSBC CUSTODY NOMINEES
(AUSTRALIA) LIMITED - A/C 2
3,039,844 0.32%
18 GOTHA STREET CAPITAL PTY LTD
<BLUE SKY NO 2 A/C>
2,812,400 0.30%
19 MR KELLY PETER BODMAN 2,520,562 0.27%
20 MR BAHRAM REZAEI 2,500,000 0.27%
Total 885,422,163 94.40%
Total issued capital 937,909,228 100.00%
Schedule of mineral tenements at 31 March 2026
Country Project Type Status Tenement Interest held by Globe Africa
31 March 2026 31 December
2025
Malawi Kanyika
Mining
Licence
Granted LML0216/21* 100% 100%
There were no tenements acquired or disposed of during the quarter.
* Pursuant to the Mines and Minerals Act, the Malawi Government is entitled to a 10%
free equity interest in LML0216/21 subject to formally notifying Globe Africa of its
desire to take up its entitlement. As at the date of this report, neither the Company
nor Globe Africa has received any such notice.
Authorisation for release
This report was authorised for release by the Board of Directors.
For further information, please contact:
Globe Metals & Mining Limited
Charles Altshuler
Interim Chief Executive Officer
P: +61 8 6118 7240
E: ca@globemm.com
About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of
the regional centre of Kasangu and is secured by Large-Scale Mining Licence No.
LML0216/21 which grants the Company security of tenure and the right to mine niobium,
tantalum, zirconium and other minor metals.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have defined the
extent of mineralisation. Structured and progressive engineering studies have resulted in the
current (JORC 2012) Mineral Resource Estimate (refer below) and given rise to significant
improvements and simplifications in the process flowsheet.
The Kanyika Project will be developed in phases, substantially de-risking the project. The
project will be fully integrated on the mine site – Mining, Concentration and Refining, to
produce high-purity, high-value Niobium and Tantalum oxides for direct export to international
markets.
A Mineral Resource Estimate for the Kanyika Niobium Project under the 2012 JORC
guidelines was reported to ASX on 11 July 2018 as follows:
Mineral Resource Estimates
The information in this report that relates to Mineral Resources is extracted from the report titled
“Kanyika Niobium Project – Updated JORC Resource Estimate” released to the Australian Securities
Exchange (ASX) on 11 July 2018 and available to view at www.globemm.com and for which Competent
Persons’ consents were obtained. Each Competent Person’s consent remains in place for subsequent
releases by the Company of the same information in the same form and context, until the consent is
withdrawn or replaced by a subsequent report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the
information included in the original ASX announcement released on 11 July 2018 and, in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters underpinning
the estimates in the original ASX announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Persons’ findings are presented
have not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 titled “Kanyika Niobium
Project – Updated JORC Resource Estimate” available to view at www.globemm.com.
Table 1: MRE for KNP using a 1,500 ppm Nb2O5 lower cut Table 2: MRE for KNP using a 3,000 ppm Nb2O5 lower cut
Category
Resource
(Mt)
Nb2O5 (ppm) Ta2O5 (ppm) Category
Resource
(Mt)
Nb2O5 (ppm) Ta2O5 (ppm)
Measured 5.3 3,790 180 Measured 3.4 4,790 220
Indicated 47 2,860 135 Indicated 16.6 4,120 160
Inferred 16 2,430 120 Inferred 2.8 4,110 190
TOTAL 68.3 2,830 135 TOTAL 22.8 4,220 190
Rule 5.5
ASX Listing Rules Appendix 5B (17/07/20) Page 1
+ See chapter 19 of the ASX Listing Rules for defined terms.
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
GLOBE METALS & MINING LIMITED
ABN Quarter ended (“current quarter”)
33 114 400 609 31 March 2026
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
- -
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (235) (713)
(e) administration and corporate costs (395) (1,189)
1.3 Dividends received (see note 3) - -
1.4 Interest received 34 35
1.5 Interest and other costs of finance paid (19) (183)
1.6 Income taxes paid - -
1.7 Government grants and tax incentives - -
1.8 Other (provide details if material)
(a) Exploration and evaluation
payments for assets disposed
(b) Insurance recoveries
-
-
-
-
-
-
1.9 Net cash from / (used in) operating
activities
(615) (2,050)
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment (4) (7)
(d) exploration & evaluation (628) (1,019)
(e) investments - -
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 2
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
(f) other non-current assets - -
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other - funds from joint ventures - -
2.6 Net cash from / (used in) investing
activities
(632) (1,026)
3. Cash flows from financing activities
- 8,670
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
(314) (340)
3.5 Proceeds from borrowings - 818
3.6 Repayment of borrowings - (2,372)
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other – operating lease payments - -
3.10 Net cash from / (used in) financing
activities
(314) 6,776
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
5,757 496
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(615) (2,050)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(632) (1,026)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
(314) 6,776
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 3
+ See chapter 19 of the ASX Listing Rules for defined terms.
Consolidated statement of cash flows Current quarter
$A’000
Year to date (9
months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
- -
4.6 Cash and cash equivalents at end of
period
4,196 4,196
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances (includes cash from assets
held for sale)
977 2,757
5.2 Call deposits - -
5.3 Bank overdrafts - -
5.4 Other (term deposits) 3,219 3,000
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
4,196 5,757
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
79
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
-
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Payments relate to Director’s fees and their associates
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 4
+ See chapter 19 of the ASX Listing Rules for defined terms.
7. Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at quarter
end
$A’000
7.1 Loan facilities - -
7.2 Credit standby arrangements - -
7.3 Other (please specify) - -
7.4 Total financing facilities - -
7.5 Unused financing facilities available at quarter end -
7.6 Include in the box below a description of each facility above, including the lender, interest rate, maturity
date and whether it is secured or unsecured. If any additional financing facilities have been entered into
or are proposed to be entered into after quarter end, include a note providing details of those facilities as
well.
8. Estimated cash available for future operating activities $A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (615)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(628)
8.3 Total relevant outgoings (item 8.1 + item 8.2) (1,243)
8.4 Cash and cash equivalents at quarter end (item 4.6) 4,196
8.5 Unused finance facilities available at quarter end (item 7.5) -
8.6 Total available funding (item 8.4 + item 8.5) 4,196
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
3.4
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer:
N/A
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer:
N/A
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
ASX Listing Rules Appendix 5B (17/07/20) Page 5
+ See chapter 19 of the ASX Listing Rules for defined terms.
8.8.3 Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer:
N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 30 April 2026.............................................................................
Authorised by: .........By the Board ..........................................................................
(Name of body or officer authorising release – see note 4)
Notes
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the
entity’s activities for the past quarter, how they have been financed and the effect this has had on its cash position. An
entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is
encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions
in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash
Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting
standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”.
If it has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the
[name of board committee – eg Audit and Risk Committee]”. If it has been authorised for release to the market by a
disclosure committee, you can insert here: “By the Disclosure Committee”.
5. If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as
complying with recommendation 4.2 of the ASX Corporate Governance Council’s Corporate Governance Principles and
Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial
records of the entity have been properly maintained, that this report complies with the appropriate accounting standards
and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a
sound system of risk management and internal control which is operating effectively.
Share your feedback
Discover