7 April 2025
Non-binding MOUs now signed for up to 100% of Kanyika Phase
1 production
Up to 100% of the Kanyika Project’s Phase 1 production of Niobium Pentoxide
and Tantalum Pentoxide is now under non-binding offtake MOU or letter of intent,
paving the way for binding offtake undertakings which will support Globe’s
upcoming updated Bankable Feasibility Study
Highlights
•
•
•
•
•
•
•
Globe Metals & Mining signs a non-binding MOU on an offtake agreement
with NEO Performance Materials Inc. (TSX:NEO) (“Neo”)
The MOU gives Neo the right to purchase 150 metric tonnes per annum of
Niobium Pentoxide from the Kanyika Project’s Phase 1 production.
Up to 100% of both niobium and tantalum Phase 1 production of the Kanyika
Project is now under non-binding offtake MOU or letter of intent.
It is anticipated that the agreement will be renewed annually.
Development of the Kanyika Project positions Globe Metals & Mining as a key
and reliable supplier of in-demand Niobium Oxide to specialised industries
based in Europe and North America.
Neo also has a limited right of first refusal to purchase other critical metals,
such as Tantalum and Zirconium, produced at Kanyika, further demonstrating
the strong demand for the Project’s output.
Neo manufactures critical industrial materials for modern technologies,
supporting efficiency, sustainability, and the net-zero transition, with global
operations and R&D facilities.
Globe Metals & Mining Limited (ASX:GBE) (“Globe” or “the Company”) is
pleased to announce the signing of a non-binding Memorandum of Understanding
(“MOU”) with Neo Performance Materials Inc. (TSX:NEO) (“Neo”) for 150 tonnes of
refined high-purity Niobium Pentoxide. This MOU outlines the framework for both
parties to negotiate a binding offtake agreement (“Agreement”) for 50% of the
Kanyika Niobium project Phase 1 production of Niobium Pentoxide.
The MOU provides the framework for negotiation of a binding offtake
agreement
Key components of the non-binding MOU :
•
The MOU provides a framework for Globe and Neo to negotiate a binding
offtake agreement for the supply of around 50% (150 metric tonnes out of 313
metric tonnes) of Kanyika’s total annual Phase 1 production of the high-purity
Niobium Pentoxide.
•
The term of the Agreement shall commence on the date of execution of the
MOU and continue until Globe has completed delivery of shipments of Niobium
Pentoxide in the aggregate annual quantity of 150 metric tonnes during Phase
1 production.
•
The Agreement will be automatic renewal annually, unless terminated by either
party with at least twelve months’ notice.
•
Neo will have a right of first refusal to purchase Tantalum Pentoxide and
zircon units on terms and conditions to be agreed upon by the Parties. The
duration of the first right of refusal is 30 days, after which Globe has the right
to sell the production to other parties.
•
Pricing of offtake will be based on the Asian Metals Index price - FOB Chinalow.
Globe’s Chief Executive Officer, Paul Smith, commented
“The Neo MOU represents a watershed moment for the Kanyika Project. It means
Globe has now signed multiple MOUs and a letter of intent that, as a package, cover
offtake for100% of the Kanyika’s Phase 1 production of both Niobium Pentoxide and
Tantalum Pentoxide. We are now working to quickly turn these offtake discussions
towards binding agreements. Success here will materially support the commercial
viability of the Kanyika Project, and provide a significant boost to our current efforts to
finalise key funding processes. These offtake discussions will now also be
incorporated into upcoming updated Bankable Feasibility Study. The latter document,
which will further demonstrate the economics of our Kanyika Project, is expected to
be published early in the June 2025 quarter.
We look forward to a long and lasting relationship with Neo, and are very pleased to
be associated with such a highly regarded group, which enjoys a pre-eminent
position in the global market for strategic and critical metals.”
Neo’s Chief Executive Officer, Rahim Suleman, commented
“We are laser-focused on diversifying and de-risking our supply chain, including our
long term access to critical metals, and expanding into increasingly more
downstream value-added applications across all our business lines, including niobium
and tantalum. The feedstock agreement with Globe provides an opportunity to
engage in multi-year planning to optimize Neo’s supply chain.”
Other key offtake agreements for Kanyika Phase 1 production
•
On 2 September 2024, Globe announced the signing of a letter of intent
(“LOI”) with Affilips N.V. The LOI would allow Affilips the right to purchase up
to 32% (approximately 100 metric tonnes) of expected annual high-purity
Niobium Pentoxide production from the Kanyika Project.
•
On 10 March 2025 Globe announced the signing of an MOU with Myst
Trading Pte Ltd relating to offtake.
o The key aspects of the MOU include:
▪ The right to purchase 100% (approximately 14 metric tonnes)
of the Kanyika Project’s expected annual high-purity Tantalum
Pentoxide production
▪ The right of first refusal on 25% (approximately 76 tonnes) of
the Kanyika Project’s expected annual high-purity Niobium
Pentoxide production
In total, the current package of MOUs and letter of Intent paves the way for binding
undertakings on 100% of the Kanyika Project Phase 1 offtake.
About Neo Performance Materials ULC
Neo Performance Materials Inc.(TSX:NEO) is listed on the Toronto Stock Exchange
under the ticker symbol “NEO”. Neo manufactures the building blocks of many
modern technologies that enhance efficiency and sustainability. Neo's advanced
industrial materials – magnetic powders, rare earth magnets, magnetic assemblies,
specialty chemicals, metals, and alloys – are critical to the performance of many
everyday products and emerging technologies. Neo's products fast-forward
technologies for the net-zero transition. The business of Neo is organized along three
segments: Magnequench, Chemicals & Oxides and Rare Metals. Neo is
headquartered in Toronto, Ontario, Canada; with corporate offices in Greenwood
Village, Colorado, United States; Singapore; and Beijing, China. Neo has a global
platform that includes manufacturing facilities located in China, Germany, Canada,
Estonia, Thailand and the United Kingdom, as well as a dedicated research and
development centre in Singapore. For more information, please visit
www.neomaterials.com.
For further information, please contact:
Globe Metals & Mining Limited
Media & Investor Enquiries
Paul Smith
Chief Executive Officer
P: +61 8 6118 7240
E: paul.smith@globemm.com
The Capital Network
Julia Maguire
P: +61 2 7257 7338
E: julia@thecapitalnetwork.com.au
About the Kanyika Niobium Project
The Kanyika Niobium Project is located in central Malawi, approximately 55km northeast of the
regional centre of Kasangu and is secured by Large-Scale Mining Licence No. LML0216/21 which
grants the Company security of tenure and the right to mine niobium, tantalum, zirconium and
other minor metals.
Drilling programs totalling 33.8 kilometres of percussion and core drilling have defined the
extent of mineralisation. Structured and progressive engineering studies have resulted in the
current (JORC 2012) Mineral Resource Estimate (refer below) and given rise to significant
improvements and simplifications in the process flowsheet.
The Kanyika Project will be developed in two phases, substantially de-risking the project. The
project will be fully integrated on the mine site – Mining, Concentration and Refining, to produce
high-purity, high-value Niobium and Tantalum oxides for direct export to western markets.
A Mineral Resource Estimate for the Kanyika Niobium Project under the 2012 JORC guidelines
was reported to ASX on 11 July 2018 as follows:
Table 1: MRE for KNP using a 1,500 ppm Nb 2 O5 lower cut
Table 2: MRE for KNP using a 3,000 ppm Nb 2 O5 lower cut
Category
Resource
(Mt)
Nb2 O5 (ppm)
Ta2 O5 (ppm)
Category
Resource
(Mt)
Nb2 O5 (ppm)
Ta2 O5 (ppm)
Measured
5.3
3,790
180
Indicated
47
2,860
135
Measured
3.4
4,790
220
Indicated
16.6
4,120
160
Inferred
16
2,430
120
TOTAL
68.3
2,830
135
Inferred
2.8
4,110
190
TOTAL
22.8
4,220
190
Mineral Resource Estimates
The information in this report that relates to Mineral Resources is extracted from the report titled “Kanyika
Niobium Project – Updated JORC Resource Estimate” released to the Australian Securities Exchange (ASX)
on 11 July 2018 and available to view at www.globemm.com and for which Competent Persons’ consents
were obtained. Each Competent Person’s consent remains in place for subsequent releases by the Company
of the same information in the same form and context, until the consent is withdrawn or replaced by a
subsequent report and accompanying consent.
The Company confirms that is not aware of any new information or data that materially affects the
information included in the original ASX announcement released on 11 July 2018 and, in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters underpinning the
estimates in the original ASX announcement continue to apply and have not materially changed. The
Company confirms that the form and context in which the Competent Persons’ findings are presented have
not been materially modified from the original ASX announcement.
Full details are contained in the ASX announcement released on 11 July 2018 titled “Kanyika Niobium Project –
Updated JORC Resource Estimate” available to view at www.globemm.com.
Share your feedback
Discover